Mega Projects Engineer
Toledo, Ohio
Project: ODOT 010493 LUC-280 $243 million cable stayed segmental bridge over the Maumee River in Toledo eventually known as the Veterans Glass City Skyway. Work included drilled shaft installation using mini-sid and cross sonic logging, mass concrete, span by span precast segmental box construction, unidirectional cantilever precast segmental box construction, stay cable installation, post tensioning and grouting, diamond grinding, LED lighting, glass installation, and mechanical work.Duties: Resident Engineer for the project management team which included FIGG, HNTB, Parsons Brinckerhoff and ODOT; Managed up to 9 project engineers, 2 project managers, 22 project inspectors, 8 surveyors, and 1 clerk; Contract administration; Resolve field issues promptly and/or consult with designers; Partner and resolve disputes; Analyze delays; Manage review of submittals, work procedures, RFI’s, and CPM schedule; Processed over 25,000 documents using indexed electronic file structure; Conducted weekly progress and schedule meetings; Assigned work duties to the project management team and tracked progress;