Hses Coordinator
Current*HSES Coordinator*Offshoreproject loc : Forel Bronang project, Medco Energi, North Natuna Sea, (Sept 24 - Now)project Loc : Lawe", Kilang Pertamina Balikpapan, Kal-Tim(Feb 24 - Aug 24)project loc : PHM Bekapai AL, Kal-Tim (Nov 2023 - Feb 2024)Project loc : Husky Cnooc Madura Limited - MAC, MOPU-Prameswari 8, North Java Sea(Sept 2023 - Nov 2023)Project loc : PHE ONWJ - OPL YYA, North Java Sea, Cilamaya, Jawa Barat (Startup wheel and Running Equipment)(Ags2023 - Sept 2023)Project loc : Jawa Satu Power, Cilamaya Karawangsite : Onshore and Offshoreperiod : Jan 2023 - Ags 2023*Sr.HSES Officer*site : OffshoreProject loc : Forel site Medco Natuna Limited, North Natuna SeaRecovery hole conductor (subsea project)period : Des 2022 - Jan 2023*HSES Officer*Project loc : PHE ONWJ - OPL YYA, North Java Sea, Cilamaya, Jawa BaratInstall jacket, topside and pipe linesite : Offshoreperiod : Sept 2022 - Nov 2022Project loc : Forel - Bronang Medco Natuna Limited, North Natuna SeaInstall jacketsite : Offshoreperiod : Ags 2022 - Sept 2022Project loc : Husky Cnooc Madura Limited - MAC, North Java Sea, Jawa TimurInstall jacket, topside and pipe linesite : Offshoreperiod : Juni 2022 - Ags 2022project loc : PETRONAS, Bukit tua, North Java Sea, Jawa TimurInstall topside, topside and test commissioningsite : Offshoreperiod : Feb 2021 - Mar 2022project loc : LNG Tangguh, Bintuni, Papua Baratsite : Onshoreperiod : july 2019 - Des 2020- pre-start meeting all HSSE, Supervisor, and wolker at Tangguh Expantion project papua barat- Ensure JSA (Job Safety Analisis) before submit PTWC- pre-use tools/equipment checklist inspection before start working- Ensure STARRT CARD and permit working (sipil work, cold/hot work and lifting operational)- Sipil work (road, excavation, granding cutting, compacting soil, back fill and concrete)- Daily, weekly and monthly inspection report- Monitoring and close supervision onshore sipil, piping and lifting