15+ years in deep water riser design, manufacturing, testing, supply and offshore installation. As part of my roles and responsibilities I’ve conducted global riser analysis using finite element analysis (FEA) programs such as flexcom provide strength and fatigue performance assessments to major oil and gas operators. In addition to FEA work I’ve spent several years designing, supplying and installing monitoring system for top tensioned riser (TTR’s), steel catenary risers (SCR’s), subsea jumpers and manifolds as well as tensioner systems.Over the past 10 years my primary objective have been to overseen vendor equipment design, manufacturing, quality, testing and delivery with various companies throughout the world. I have personally overseen the delivery of over $50M of subsea equipment. Equipment was delivered on time, fully tested and within budget to meet our clients’ offshore integration dates. In addition, I have been heavily involved with the offshore installation of multiple riser systems working with drilling and completions group to install equipment safely, within schedule and cost expectations.
Listed skills include Subsea Engineering, Offshore Drilling, Project Engineering, Feed, and 7 others.