Ua Journeyman Steamfitter
Current• Installed high pressure piping systems, pumps, valves and other equipment in commercial, industrial and residential buildings.• Installed over 6500 ft of stainless steel piping and fixtures, completed projects within in 5-7% of the estimated budget and completed projects 125% faster than anticipated.• Applied safety guidelines to operations, monitored operational procedures and performed preventive maintenance on equipment.• Completed quality control tests and ensured that the systems were running correctly and safely.• Ensured compliance with local building codes and industry standards.• Coordinated with other trades, owners and subcontractors to insure smooth progress of the project. .• Gauged and inspected production equipment to ensure a safe and reliable operating system.