Administrative Assistant V ( Construction Maintenance Foreman
> Conduct inventory/survey of needed repairs & maintenance services of LNU Buildings & other structures. > Prepares Bill of Materials / Program of works (Excel form), Drawings & Sketches. > Prepares Schedule of Work. > Supervise & Manage the Repair, Maintenance & Construction Projects such as:Name of Projects with Drawings, Sketch, Plans, etc. ESTIMATED COST (W/ Drawings) Finished & Benefited Project14 concrete benches 49,773.88 49,773.88 Administration Building 2 sets ceramic sinks countertop lavatories 38,366.00 - 10 Sets School Blackboard 70,014.16 - Administration Building Termite Proofing ( LABOR AND MATERIAL ) 126,065.50 - Administration Building repair & repainting 644,764.47 - Administration Building Personnel Records Cabinets 39,251.97 39,251.97 Administration Building Registrar's 1 set working table & 2 sets cabinets 36,090.88 - Brillo Building repair and repainting2 689,046.00 689,046.00 CTE Building Repair of damaged canopy, 64,722.74 64,722.74 College Building Mock bar and Mock dining zone 189,000.00 - College Building Regional Center for Filipino Languages R.8 24,685.16 24,685.16 College Library Building water leak @ canopy etc. 37,100.85 37,100.85 Covered Court 5,958,650.65 - Covered walk Canal (ALONG COLLEGE BLDG) 160,340.00 160,340.00 Dormitory Kitchen Building 111,322.18 111,322.18 Gate & Fence 1,863,729.29 1,863,729.29 Gate & Fence Negotiated Contract 512,881.86 - Graduate Library Building Steel Railing 8,433.87 8,433.87 Graduate Library Building internet station lobby – Copy 50,789.58 - Humanities Building (6-ceramic lavatory sink with 2 wall hung) 126,043.55 -minimuum space alloted on Linked in T O T A L 15,765,235.59 5,829,273.59