Dave Jelley Email and Phone Number
Dave Jelley work email
- Valid
Dave Jelley personal email
- Valid
More detailed information summary on my website t/a Airflow Instrumentation LTD:http://davejelley.wix.com/d-jelley-modu-engSPECIALIST SERVICES:Cold Blast Cupola Measurements & Control SystemsMODU Special Periodical Survey 5 yearly SPS Commissioning & documentation preparedMODU Reactivation Documentation Prepared for third party acceptanceMODU 24 hr SIT ( System Integration & Test ) before MODU departsMODU Project Tracking % Complete with Punch List CoordinationMODU/DRILLSHIP/FPSO/MOPU /GAS COMPRESSION PLATFORM/POWER PLANT/ Special Periodical Survey Upgrades Commissioning & SIT Multidisciplinary third party acceptance Engineer with extensive experience on worldwide projects ( both onshore and offshore ) who offers MODU speciality:Third party acceptance multidisciplinary commissioning documentation prepared for E & I, Mechanical, Piping, Structural & Marine.Project construction to commissioning % complete tracking & punch list coordinator. MODU reactivation, ready for service acceptance & ready to drillMODU SPS ( special periodical survey ) equipment upgrade commissioning & acceptanceMODU SPS project tracking from 0 - 100% construction to commissioning completeMODU SPS Punchlist tracking MODU SIT ( Drilling systems 24hr endurance integration test )FAT ( factory acceptance test & simulation )Commissioning procedures & acceptance completed for MODU semi-submersible rigs, Jackup rigs, drill ships,FPSO, Onshore/Offshore Power Plants- Rolls-Royce/GE/Solar ,Power Barges, Gas Compression Platforms, Onshore Terminals, Pipeline Pumping Stations,Instrumentation & control systems, ICSS,DCS, PCS, ESD, F & G, Power generation,BOP,WHRSG,WHRU, gas compressors,air compressors, pumps & cooling water systems.
-
Power Plant Commissioning EngineerRamboll Power Jan 2024 - PresentFalkland IslandsPower Plant commissioning & acceptance engineer
-
Company DirectorJelleyworld Narrowboat Hire Jan 2020 - PresentTattenhall Marina, Chester Uk - Www.Jelleyworldnarrowboathire.ComHoliday Rental arrangement & maintenance on two 50ft 6 berth steel narrowboat’s
-
ProprietorAirflow Instrumentation 1983 - PresentUk & OverseasFPSO/MODU/MOPU & Power Plant MC to Ready For Service, Inspection, Commissioning & Third Party Acceptance Engineer, Project construction to commissioning % complete tracking & punch list coordinator.Speciality trading as Airflow Instrumentation I write third party acceptance E & I, Mechanical, piping, Structural and Marine commissioning procedures & Installation acceptance documentation for MODU upgrade work such as 5 yearly special periodical survey work and then complete the commissioning & inspections, I can also perform a 24 hour system integration test SIT for the drilling equipment before the rig departs the ship yard, more information on the systems I commission is under the ‘services’ section of my website link below and SIT presentation is on the ‘home’ page:http://davejelley.wix.com/d-jelley-modu-eng -
I & C Commissioning EngineerAirflow Instrumentation Sep 2016 - Oct 2016Aga Rangemaster Foundry, Telford, Shropshire.Design replacement cupola blast furnace control system to Replace damaged Foxboro pneumatic system. Install newPanel mounted ABB CM50 controller with ABB fieldEquipment & commission. -
Instrumentation SuperintendentGkpi Kurdistan Sep 2019 - Jun 2023KurdistanProject closed down due to political problems in March 2023!Various instrumentation upgrades on Process Facility PF-1 &. PF-2, installation & commissioning of new PF-1 pump station to RETM export pipeline facility, installation & commissioning wellsite SH-9 & SH-13.Project % complete tracking on work scopes and punch lists, complete instrumentation commissioning work packs to include location drawings, PID’s, data sheet, loop drawing, calibration loop check sheets, cause & effects chart. As - built update any documentation.Control & oversee local E & I technicians and arrange work permits, risk assessments, tool box talks, materials and correct test equipment & certification for commissioning.
-
Instrumentation LeadKentech Group Kuwait Sep 2018 - May 2019KuwaitInstrumentation construction & commissioning lead to oversee and coordinate turnover & commissioning activities on the project. Subcontracted to Fluor ( FDHJV ) commissioning readiness MC to RFC for six Howden Thomassen compressors with AviComp controls systems and associated plant. Project % complete tracking on work scopes, complete work instrumentation packs to include location drawings, PID’s, data sheet, loop drawing, calibration loop check sheets, cause & effects. Control & oversee local Instrument technicians and arrange materials with correct test equipment & certification.
-
Instrumentation Commissioning Technician Bp Shah Deniz 2, BakuKentech Group May 2017 - Dec 2017Sd 2 Project, Baku, AzerbaijanBP Shah Deniz 2, Sangachal Terminal, Azerbaijan. Commissioning instrumentation on various plants, cold loop & hot loop checks, Calibration & function checks. Emerson Delta V DCS with AMS Intelligent Devise Manager, Siemens gas compressor Packages with Rolls-Royce gas turbines. -
Commissioning EngineerAllseas Mar 2016 - Sep 2016Rotterdam Area, NetherlandsWorking on the Pioneering Spirit heavy lift cable lay vessel, commissioning the top side lifting system instrumentation & controls.complete site inspections & punch list coordination. -
I & C Commissioning Engineer/Punch List CoordinatorKentz - Colombia May 2015 - Aug 2015Reficar Refinery, Colombia.I & C Pre-commissioning & loop checks B & C Sheets,Refinery Coker Plant Section,Punch list coordinator & clearance. -
Senior Project Modu Commissioning & Acceptance Engineer/Project Tracking & Punch List - Ensco 54Ocs Group Jul 2014 - Aug 2014Ensco 54 Project, Lamprell Ship Yard, Sharjah, UaeEnsco jackup rig E54,WBS Specific Work Breakdown Structure (WBS) Maintenance & Upgrade, Lamprell shipyard, Sharjah.UAE Accountable for the coordination, administration and control of Commissioning Multidisciplinary work scopes for E & I, Mechanical, Pipework, Structural & Marine during Shipyard Project, complete commissioning procedures specific for ABS standards and the Project 5 yearly SPS upgrade for the rig as previous projects to include such systems as;Fire & Gas, PA/GA, CCTV, UPS, Deluge fire monitors, pumps & helideck foam, Emergency Generator, Compressors, Mud Pumps, Cranes, BOP, Manifolds, BA Cascade System, Life boats & FRC, Helideck lighting, ESD CO2 & fire dampers, Drawworks, Rotary table, Iron Roughneck, Top Drive, Crown Block, HPU, Rigsense, Travelling Block, Shale Shakers, Air Hoists, Jacking System, Leg Length Monitoring System. Project construction/commissioning % complete tracking & punch list coordinator. -
Senior Project Modu Commissioning & Acceptance Engineer/Punch List Coordinator- Ensco 96/97Ocs Group Feb 2014 - May 2014Ensco 96/97 QatarEnsco jackup rigs E96/E97 Five year SPS ( second stage )(Special periodical survey), Maintenance & Upgrade, N/KOM shipyard, Qatar. Accountable for the coordination, administration and control of Commissioning during both Shipyard Projects, complete commissioning procedures specific for the project upgrade for the rigs as previous on Ensco projects, Project construction/commissioning % complete tracking & punch list coordinator. -
Senior Project Modu Commissioning & Acceptance Engineer/Punch List Coordinator- Ensco 88Ocs Group Aug 2013 - Nov 2013E88 BahrainEnsco Rig E88 special periodic survey( SPS ), maintenance & upgrade, Asry shipyard, Bahrain. Accountable for the coordination, administration and control of Commissioning during Shipyard Project, complete commissioning procedures specific for the project upgrades, Project construction/commissioning % complete tracking & punch list coordinator. -
Senior Project Modu Commissioning & Acceptance Engineer/Punch List Coordinator- Ensco 94Ocs Group Feb 2013 - Apr 2013BahrainEnsco Rig E94 special periodic survey ( SPS ), maintenance & upgrade, Asry shipyard, Bahrain. Accountable for the coordination, administration and control of Commissioning during Shipyard Project, complete commissioning procedures specific for the project upgrades for Mooring and Marine Equipment,Cranes and Winches,Drilling Equipment,Mud System,Well Control Systems,Power Generation & Distribution,Safety and Lifesaving,Support Systems,CCTV.SIT.( systems Integration & Test ) Project construction/commissioning % complete tracking & punch list coordinator. -
Project Drillship Commissioning & Acceptance Engineer/Punch List Coordinator- Ensco Ds-1Ocs Group Jul 2012 - Nov 2012Angola & Cape Town, South Africa.OCS Project commissioning engineer for DS-1.Ensco modu DS-1 special periodic survey ( SPS ), maintenance & upgrade, Offshore Angola & then Cape Town shipyard.Accountable for the coordination, administration and control of Commissioning during Shipyard project, complete commissioning procedures specific for the project upgrades to include:drawworks, crown block, travelling block, top drive, dfma, sack cutting machine, shakers, screw cutting conveyors, mud pumps, finger board, bridge racking crane, cement unit, pipework renewals, stand pipe manifold, dsc, diverter system, dead man system, choke manifold, bop controls, rov panel, conduit valve manifold, Xmas tree crane & transporter, bulk systems, iccp, valves replacements, lifeboats, thrusters, cranes, SIT. Project construction/commissioning % complete tracking & punch list coordinator. -
Ocs Project Modu Commissioning & Acceptance Manager Ensco 5002Offshore Commissioning Solutions ( Ocs ) Dec 2011 - Mar 2012BrazilEnsco Rig E5002 special periodic survey ( SPS ), maintenance & upgrade, Macae & Angra dos Reis shipyard, Brazil. Accountable for the coordination, administration and control of Commissioning during Shipyard Project,complete commissioning procedures specific for the project upgrades to include:Iron roughneck, drawworks, top drive, rotary table, mud pumps, bridge crane, oily water separator, vertical pipe racking system, crown block, travelling block, cranes, diverter system, BOP controls, pipework replacement, fire main system, anchor winches, deadline anchor, replacement sounding tubes, air systems, compressors, lifeboats, anodes, weather tight doors, cctv system, PA & Alarm system, emergency generator, tank level gauging system, SIT. Project construction/commissioning % complete tracking & punch list coordinator. -
C & I Power Barge Consultant EngineerWaller Marine Houston Feb 2011 - Nov 2011VenezuelaC & I consultant engineer, complete power barges and now commissioning fuel barge Iguana II project, Venezuela,working direct for WMI.
-
Lead C & I Power Barge Construction/Commissioning EngineerIec Systems, Venezuela Sep 2010 - Feb 2011Construction/Commissioning Lead C & I Engineer on two 171MW power barges for Waller Marine Inc with GE 7FA turbine generator packages & BOP. Speedtronic Mark VI controls on turbines, HPI controls for BOP, Deep Down panel for ballast & bilge monitoring system, also compile new CAD loop drawings for project.
-
C & I Power Plant Commissioning EngineerProenergy Services, Pakistan Jun 2010 - Aug 2010C & I Commissioning engineer at Naudero power plant project, Sindh, Pakistan.Commissioning instrumentation & controls on two RB211-24C gas generators & BOP -
Electrical Instrumentation & Controls EngineerAirflow Instrumentation Jan 1982 - Jul 2010My UK registered Instrumentation company t/a Airflow Instrumentation that was registered in 1982 that specialised in Iron Foundry cupola air blast furnace control systems, then later in 1992 for self employed onshore/offshore instrumentation oil & gas/power plant related projects both UK & overseas commissioning, inspection & consultancy work still trading to date.
-
Lead Modu Commissioning Instrumentation Engineer - Noble Dave BairdOcs Group May 2009 - Jan 2010Angra Dos Reais, BrazilInstrumentation commissioning engineer to completecommissioning for ballast control system, Fire & Gas system, Vessel Management system and rig monitoring System. Control teams of local instrument technicians for calibration of all instrumentation, loop checking and as-built drawings, Prepare all instrumentation & control packages for handover to Noble operation team. -
Lead Mopu Icss/Instrumentation Commissioning/Construction Engineer - Nabors Dolphin 1-11Dps Bristol Apr 2007 - Aug 2009Ingleside, Texas & Offshore AngolaCommissioning engineer on the Dolphin 1-11 Mobile Offshore Production Unit ( MOPU ). A conversion project of a drill rig into a central processing facility. Started work onshore Texas, USA E & I construction to replace the Siemens Moore Quadlog ICSS package after the rig partially sank, factory acceptance tests, remove old and install replacement ICSS cabinets, field junction boxes, cables and process equipment, then final commissioning offshore Block 2, Angola. Tasks included supervise instrument technicians, cold wire loop checks, acceptance on QA/QC for E & I contractors, final loop checks, function checks, as-built drawings using AutoCAD 2009, cause & effects testing, commission all plant including Boustead Controls(Singapore) Siemens ICSS ,PCS, ESD, F & G, on export pumps, test Separator, wellhead control panel, Solar GT, fuel gas compressor and chemical Injection pumps until first oil, plant performance tests & handover to client.
-
Instrumentation EngineerKentz Brazil Jun 2006 - Dec 2006Rio Polmeros, Rio.Clearing punch list items for final handover on behalf of Kentz, Houston, hands on for instrumentation and minor software changes, electrical issues corrected by local Brazilian electricians, installation and commissioning a new bog compressor.
-
Bg Miskar Gas Compression Platform C & I EngineerBg Tunisia May 2005 - May 2006Offshore TunisiaBritish Gas, Miskar platform, offshore Sfax, Tunisia,Commissioning/startup/training/maintenance on one Rolls- Royce RB211 type 24G with Siemens gas compression unit, Entronics UCP, Siemens F & G panel, Silvertech DCS.
-
White Rose Fpso Instrumentation EngineerAmkc Canada Mar 2005 - May 2005Nova Scotia, CanadaCommissioning & dynamic testing three Rolls-Royce RB211 turbines and heat recovery units. Entronics UCP.
-
Petrobras Caratinga/Barracuda Fpso P48 & P43 Senior Instrument SupervisorKbr Halliburton Brazil Nov 2004 - May 2005BrazilCaratinga development Project, Angra, Brazil, HVAC, gas compression & hydraulic control valves Loop checks and commissioning on FPSO P48, ECOS DCS.Barracuda Development Project, Niteroi,Rio de Janeiro, Brazil. DAC Inspections on various systems, Assist vendors with loop checks & commissioning FPSO P43.
-
Rolls-Royce Power Plant Lead C & I EngineerRolls-Royce Brazil Aug 2001 - Jun 2004Camaçari Area, BrazilC & I Construction/Commissioning Lead Engineer. Rolls Royce Power Generation, Fafen Project, Salvador, Brazil,Commissioning three Nuovo Pignone gas compressors, three Rolls Royce RB211 LE gas turbines, three heat recovery Steam generators, one MAN steam turbine & BOP using ABB DCS, Entronics/Allen Bradley UCP’s and Turbolog Control systems.
-
Rolls-Royce Power Plant C & I Commissioning EngineerRolls - Royce Bvi Mar 2001 - Jun 2001Bvi, CarribeanPockwood Pond Project, BVI, Carribean.Commissioning three Allens diesel generators using D S & S with SCADA package.
-
Fat Simulation/Commissioning C & I EngineerCbiss - Uk Nov 2000 - Mar 2001Birkenhead, UkCBISS FAT control panel simulation to client acceptance then on site commissioning on Allen Bradley plc & Eurotherm DCS packages.
-
Process Plaforms & Onshore Terminals Instrument Supervisor/TechnicianBrown & Root/ Halliburton Mar 1992 - Oct 2000Various Offshore/OnshoreVarious projects both onshore/offshore commissioning & routine maintenance. Fulmer Alpha Platform, Cleeton/Neptune Platform, Mongo Platform, Texaco Tarton Platform, BHP Terminal, North Wales, Sangachal Terminal, Azerbaijan, Sangu Development Project, Bangladesh, Schiehallion FPSO, Belfast, BG Amada Platform. Shell Gannet Platform, Brent Bravo LTFD.
-
Instrumentation EngineerSelf Employed T/A Airflow Instrumentation Jan 1983 - Mar 1992Self Employed trading as Airflow Instrumentation travelling throughout the UK and overseas on various onshore & offshore power plants and oil & gas projects. specialist for Iron foundry cupola blast control systems, single blast cupola control, twin blast cupola control.
-
Apprentice Instrument TechnicianOpl Instrumentation Jan 1977 - Jan 1983Instrumentation Technician commencing as apprentice, six years experience on various installations and maintenance of plant. JIB Graded Instrument Technician
Dave Jelley Skills
Dave Jelley Education Details
-
Widnes Technical CollegeInstrumentation & Controls City & Guilds Part Ii
Frequently Asked Questions about Dave Jelley
What company does Dave Jelley work for?
Dave Jelley works for Airflow Instrumentation
What is Dave Jelley's role at the current company?
Dave Jelley's current role is Instrumentation Engineer.
What is Dave Jelley's email address?
Dave Jelley's email address is da****@****ail.com
What schools did Dave Jelley attend?
Dave Jelley attended Widnes Technical College.
What skills is Dave Jelley known for?
Dave Jelley has skills like Commissioning, Instrumentation, Fpso, Gas, Onshore, Petroleum, Inspection, Offshore Drilling, Gas Turbines, Pumps, Pipelines, Dcs.
Not the Dave Jelley you were looking for?
-
-
2gmail.com, knowaste.com
-
1dpworldsouthampton.com
-
1btinternet.com
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial