Dave Jones Email and Phone Number
Dave Jones work email
- Valid
- Valid
Dave Jones personal email
ExpertiseDave started as an Engineer on large scale construction projects and over time has progressed through all stages of site management with roles as Section Engineer, Senior Engineer, Sub Agent, Agent, Project Manager, Contracts and Operations Manager,His experience includes projects with significant complex construction techniques such as station refurbs and rebuilds, bridge demolition and reconstruction, PWay works, bridge jacking, road construction, tidal works including offshore lighthouse construction, large scale foundation works using methods such as diaphragm walling, sheet piling (including Gikon anti vibration method) and bored piling, Deep drainage works, construction of segmental shafts and caisson shafts, construction of on-shore windfarms and all forms of Network Rail possession work.Since branching into Rail Sector works over the last 15 years, Dave has progressed to acting as Contractors Engineering Manager (CEM) and Contractors Responsible Engineer (CREc) on works such as over/under bridge construction, Overbridge Jacking, Platform construction, PWAY install and whole station construction/refurbishment.As Interface Manager Dave works closely with all Business units of Galliford Try, Clients and Designers acting as first point of contact on Rail Operations, Group Operations with Rail Interface, Pre-construction, Engineering and Assurance matters, adding expertise and Construction Knowledge to the design, improving cost estimations, carrying out early risk management processes, ensuring better collaboration is achieved with enhanced feasibility analysis to ensure rail interface projects are delivered safely, on time and within budgetKey StrengthsA Qualified Civil Engineer BEng (Hons)Chartered Civil Engineer (MICE)Member of Association of Project Management (MAPM)CEMCREcAward DSM whilst serving in HM Forces
Galliford Try
View-
Galliford Try Group, Rail Interface ManagerGalliford Try Group Of Companies Aug 2014 - PresentAs Interface Manager roles cover aspects such as, Group Operations, Pre-construction, Engineering and Assurance as below: Group Operations – Responsible for the managing all aspects of the Network rail interface, acting as Contractor’s Engineering Manager, Responsible Engineer and ALO champion, creating safe systems of work to facilitate normal working hours are utilised and being point of contact with Network Rail and TOCs Pre-Construction Lead - Adding expertise and Construction Knowledge to the design, and leading the quality and technical aspects of all Rail Interface Bids, improving cost estimations, carrying out early risk management processes, ensuring better collaboration is achieved with enhanced feasibility analysis to ensure rail interface projects are delivered safely, on time and within budgetMaintains the Network Rail Bravo e-tendering portalEngineering Manager – Acting as Contractors Engineering Manager, ensuring project teams and suppliers are designing out risk at the earliest opportunity on projects, Ensuring designs are buildable and incorporate value engineering innovations. Responsible for the technical review of designs and documentation prior to submission to the client. Ensuring design deliverables meet key project milestonesEnsures compliance with Network Rail and Railway Group Engineering standardsManages the impact of change on the projects by liaising closely with the teamsAssurance Lead – Acting as Rail Assurance ManagerMaintaining Sentinel portal, ensuring rail medicals, training and D&A screens are completed and acts as lead in any Sentinel based investigationReviews new standards, assess their impactAccountable for the Rail Management system, monitoring and communicating the RMS and production of changes to procedures that may be requiredPrepares and leads any Rail related audits undertaken by both internal and external clientsMaintains the company PCL (Principal Contractors licence) and RISQS accreditation
-
Gt Group Rail Interface Manager, Cem, Assurance ManagerGalliford Try Aug 2019 - PresentWithin Role of Interface Manager. Acts as CEM on Outside Parties (ASPRO) projects for Galliford Try Infrastructure and Building teams.Since 2019, acted as CEM on the following projectsGuildford Crescent, CardiffDesign and Construct of 29 Storey apartment tower adjacent to Rail Viaduct in Cardiff consisting of 262 residential apartments, Roof Terrace and 450m2 of Commercial spaceEngine Shed Lane Improvement SchemeHighways works consisting of the following:• Construction of new precast 400m 4m concrete box culvert to divert open channel along Ings Lane• 200m High Capacity Drainage Collection channels consisting of 2.5m dia Pipe culverts. New Carriage way Drainage systemKitty Brewster Productions Store – Police ScotlandConstruction of a new build Productions Store at the KittybrewsterCriminal Justice & Custody Centre located at 52 Great Northern Rd, Aberdeen AB24 3PT for Police Scotland.M56 J6-J8 Smart Motorways UpgradeSMART Motorways upgrade of Dual 3-Lane (D3M) and 4- Lane (D4M) M56 artery link to the M60 and the M6.Albany Road Student accommodation, CoventryConstruction of a new 465 student accommodation units consisting of a mix of studios and cluster bedrooms together with communal meeting areas, foyers, cafes and Gyms for Cassidy GroupAberdeen StationRefurbishment of Aberdeen station to facilitate greater revenue, by:conversation of existing Scotrail, network rail, TOC accommodation and facilities to new retail unitsBuilding of new accommodation for Station staffInternal reconfiguration of TOC and BTP accommodationCreation of new Public concourse retail facilities Perry BarrAfA Scheme - Demolition of Existing Station, Construction of New Station Building, with Open Plan ticket office. 2 No 16 person lifts, new stairs to 2 platforms. acted as CEM during Pre Construction element of works onlySomerleytonRefurbishment of redundant 5 storey brewery to housing and retail units. Structure 3m away from elevated DC track -
Operations Manager / Pre-Construction LeadGalliford Try Apr 2018 - Aug 2019Warrington, United Kingdom
-
Contracts Manager, Cem, CreGalliford Try Mar 2015 - Apr 2018 -
Project Manager, CemGalliford Try Aug 2014 - Mar 2015Hamilton Square Underground Station, Birkenhead, LiverpoolProject manager on refurbishment of Hamilton Square Station.Hamilton Sq stattion opened on 1 February 1886, designed by G. E. Grayson in Italianate style, and has been designated as a Grade II listed building listed under the Planning (Listed Buildings and Conservation Areas) Act 1990.The Project involved the closure of Hamilton Square station in order to upgrade the station to a modern aesthetic and included the removal of all non-compliant sub surface materials within the building fabric which includesd all floor surfaces, wall cladding, tunnel linings and associated M&E works which included the Upgrade of Emergency lighting arrangements and removal of the existing static invertor systemOther work items completed wherere-gauging of Platform 1, removal of asbestos based callactite canopies to Platforms 1 and 2 and replacement with non asbestos materials and the installation of New PA Speakers and CCTV cameras -
Project Director, CreHochtief Sep 2013 - Aug 2014Pont Briwet Transportation Upgrade SchemeInvolves the replacement of the 1860’s Grade II Listed toll bridge crossing the River Dwryd in Penrhyndeudreath, North WalesA Design Build Project involving complex phasing for demolition of the old structure and build of new. Sequencing involved stage 1 works which involved construction of a new viaduct to carry Network Rail Infrastructure alongside the existing timber structure, with phase 2 of the works being to demolish the existing structure and adjoining a 2 lane carriageway for road vehicles to the viaduct constructed in phase 1. Other works include 3km approach road works to accommodate bi-directional traffic, footpaths, cycleways the construction of a new 3 car stop railway station -
Contracts Manager, CemBirse Rail May 2011 - Sep 2013Bristol, United KingdomIn charge of 2 Projects, reporting to Regional Director:1.W10 Gauge Enhancements, Leathern Bottel (Value £2.3m) consisting of Erection using bridge launch methods of Vehicular and statutory undertakers service bridge. Temporary diversion of statutory services. Demolition of 2 span Brunnel Railway bridge which carries B-Type Road. Installation of new bridge structure built off existing foundations using portal units. Replacement of carriageway to upgraded Highways specification and ancillary works.2.W10 Gauge Enhancements, Newhill/Pondfarm Overbridge. Value £1.8m) consisting of Erection of Temporary pedestrian and statutory undertakers service bridge. Temporary diversion of statutory services. Demolition of 2 span Brunnel Railway bridge which carries B-Type Road.Installation of new bridge structure built off existing foundations using precast Concrete Abutment/Pier block sections, Raising of approach roads and embankments by 1m contained by 1.2m high insitu concrete retaining units by 120m long. Replacement of carriageway to upgraded Highways specification and ancillary works
-
Contracts Manager, CemBirse Rail Aug 2010 - May 2011OxfordIn charge of W10 Gauge Enhancement Project, reporting to Regional Director:Old Abingdon Road (value £2.9m + £1.3m of Stats diversions), consisting of Erection of Temporary pedestrian and statutory undertakers service bridge. Temporary diversion of statutory services. Demolition of 3 span Brunnel Railway bridge which carries A-Type Road. Installation of new bridge structure built off existing foundations using portal units, Raising of approach roads and embankments by 1m contained by 2m high insitu concrete retaining units by 200m long. Replacement of carriageway to upgraded Highways specification and ancillary works
-
Senior Project ManagerBirse Rail Dec 2009 - Aug 2010Acting as Bid Manager, reporting directly to the Regional Director. Heading the Winning the work Tender team, bid Managing Civil Engineering tenders with Railway Interface with values from £2m to £5m. Successful tenders included the W10 Gauge Enhancement Project with a value of £4.4m and the Structures 02 Project with a value of £3.4m
-
Senior Project Manager, CreBirse Rail Dec 2008 - Dec 2009In charge of 3 number DDA Contracts to provide Step free access to passengers at Stations in the Glasgow/Strathclyde region in Scotland with a Contract value of £8.5m reporting directly to the Regional Director, contract consisted of demolition of OHLE gantry, with resiting and construction of new. Demolition of Existing footbridge, Excavation and construction of new bridge foundations and lift shafts, construction of new footbridges with integrated passenger lifts, installation of automatic doors at station entrances, refurbish 2 number existing footbridges and ticket offices, construct new low level lobby areas, installation/construction of 3 number disabled access ramps
-
Project Manager, CreBirse Rail Jun 2007 - Dec 2008Merthyr Tydfil, South WalesIn Charge of £10m contract to Enhance train services on the Cardiff to Merthyr Tydfil lines. Reporting directly to the Regional Manager, contract consisted of construction of-Pway -3km passing loop, installation of 6 sets of points and 1 diamond crossover, Installation of points heating, installation of lubricatorsCivils (Merthyr Vale station) - Construction of 2nr new platforms complete with DDA compliant pedestrian ramps, waiting shelters and Earth reinforced retaining walls. Civils (Abercynon Station) – construction of Island Platform, precast and insitu subways with DDA compliant pedestrian ramps, Installation of 132 bored piles and 2nr Earth reinforced retaining walls (tensar) and installation of 3nr UTX’s Civils (Abercynon North Station) demolition of the redundant Abercynon North StationCivils (Passing Loop) Construction of 3km of Safe Cess walkway, DNO power supplies for points heating
-
Senior AgentBirse Rail Feb 2006 - Jun 2007Port Talbot, South WalesIn charge of £7m Resignalling contract for Network Rail in Port Talbot, South WalesReporting to the Regional Business Manager, contract consisted of: Construction and erection of 61 Straight Post signal structures and 17 Special Structures, construction of Signal Bases (Concrete and Piled), construction of Equipment Housing Bases, Embankment re-grading for Signal sighting, construction of Walkways to all trackside equipment from Access Points, construction of new Access Points, the construction of Under Track Crossings (UTX’s) and Under Road Crossings (URX’s) , and the demolition and removal of structures
-
Operations ManagerMcnicholas Construction (Holdings) Ltd Jan 2005 - Feb 2006Various UkIn charge of all operational matters in the UK for the new Renewable Energy Division.Reporting directly to the General Manager, Projects include:16 Turbine Windfarm site, including 6kms of access Road, Electrical cabling and substation in South Wales.8 Turbine Windfarm Site, including 3km of access Road , Electrical cabling and Substation in Deeping St Nicholas6 Turbine Windfarm Site, including 2km of access Road , Electrical cabling and Substation in Glassmoor8 Turbine Windfarm Site, including 2km of access Road , Electrical cabling and Substation in Redtile near Cambridge3 Turbine Windfarm Site, including 1km of access Road , Electrical cabling and Substation in BurnleyOn shore cabling for Burbo Off shore windfarm in Wallasey -
Contracts ManagerMcnicholas Construction (Holdings) Ltd Jun 2004 - Jan 2005North West UkIn charge of all Civil Engineering Operations in the North-West of the UK, reporting to the UK Operations Manager. Responsible for 6 Agents, running contracts of approximately £1M to £4M mainly in the Water/Sewerage sector, but since the merging and Streemlining of the Civil Engineering, Mechanical and Power divisions I am now taking a more diverse role which includes also taking on a number of Power Utilities Contracts namely in Glasgow, Leeds and Liverpool. -
Project ManagerMcnicholas Construction (Holdings) Ltd Feb 2003 - Sep 2004NottinghamIn charge of Sewer Contracts for Severn Trent Water in Stoke on Trent and Nottingham, which included the construction of CSO chambers fitted with mechanical and fixed wave screens, the construction of various sized pipelines and Tank Sewers (sizes range from 225mm dia up to 2.4m dia), the construction of large diameter wet wells and pumping stations c/w overflow and valve chambers.Responsible for the day to day running of the contract which included; the writing of all method statements and risk assessments; Duties also include costing of the contract, forecasting costs for month ahead and to end of contract, compiling the contract health and safety plan, attending both contract and public meetings and making sure the contract came in both on time and to budget -
Project ManagerMpb Structures Jan 2002 - Oct 2002Corby, UkIn charge of a £3m contract to up-grade the permanent access points on the west coast mainline for Birse and Railtrack.Responsible for the day to day running of the contract which included; the writing of all method statements and risk assessments; the coping of new works; compiling B of Q’s for further works, attending both contract and public meetings and making sure the contract came in both on time and to budget.(short term work timescale due to hospital treatment required following complications from wounds incurred whilst Serving with Royal Marines in 1991) -
Agent/Site Manager (Contract Position)Geomarine (Jersey) Ltd Mar 2001 - Dec 2001GuernseyIn sole charge of a £1.4m main sewer contract in Guernsey Channel Islands, which included laying 225mm dia VC pipework at depths up to 6m deep in ground conditions from running sand to hard rock, the construction of numerous pumping stations c/w wave chambers, penstock chambers and pumping mains. Duties included all setting out for the contract, the allocation of all labour, plant and materials (as there was no foreman on site), taking off and ordering of materials, liasing with the client and the public, collation and submittal of interim monthly valuations. Reporting to the company director. -
Project/Contracts ManagerDragtone Jan 2000 - Mar 2001Winsford UkWorking as Project Manager for a specialist drainage/water/pipeline contractor, on numerous contracts throughout the UK, for companies including Birse, Amey, Morrison, Weldon, Christiani and Nielsen and Bowmer and Kirkland. Responsible for the allocation of plant and labour to the various contracts, the writing of all method statements and risk assessments and submitting monthly valuations to the main contractor. Reporting directly to the company directors.(short term work timescale due to hospital treatment required following complications from wounds incurred whilst Serving with Royal Marines in 1991)
-
Senior Site AgentChristiani & Nielsen Ltd Feb 1998 - Jan 2000Isle Of WightProject – Isle of Wright CSO’s – A £2.5M contract to construct 2 number Pumping Stations, 3Km of Rising main, and the upgrading of 4 number Seat Outfalls. As this was a target cost adjustment contract as well as being in charge of the Engineers on the contract, I had the task of monitoring material and labour costs throughout the contract and creating target cost adjustments for all additional works.(short term contract timescale as company went into liquidation)
-
AgentTriact Civil Engineering, North Wales Aug 1997 - Feb 1998Various, North WalesActing as Agent on Water Industry contracts up to the value of £0.5M. In charge of planning, taking off and ordering materials and plant, collating the health and safety plan at the start of the contract and upgrading as contracts progressed. Appointing and supervising sub-contractors, reporting directly to the Contracts Manager. The job included open cut drainage, large dia wet wells, caisson shafts, segmental shafts and pipe jackings.(short term work timescale due to hospital treatment required following complications from wounds incurred whilst Serving with Royal Marines in 1991)
-
Section EngineerTarmac Civil Engineering Nov 1996 - Aug 1997CornwallProject – Cornwall Track renewals. A design and build contract work £2.2M. Involved 31 different work sites through Cornwall. The work included resleepering, rerailing, restressing, reballasting and entire renewal. As night shift Site Manager, I was responsible for the co-ordination of plant, labour, materials and Engineers on various work sites. Reporting to the Senior Engineer with responsibility for 2 Engineers and 1 Technician and for the general overseeing of the night-time supervisory staff.
-
Royal Marine42 Commando, 3 Commando Brigade Feb 1991 - Apr 1995
-
Graduate EngineerTarmac International (Major Projects) Feb 1988 - Feb 1991Rnad Coulport, ScotlandProject – RNAD Coulport, Scotland / Block Release Oxford Brooks UniversityWhilst on site, setting out Large Scale Concrete works (each pour in excess on 300m3) to RIMS (Reinforced Missle Silo’s), setting out control for each pour and carrying out I&T plan monitoring for pours for inclusion into H&S File. Also acting as Internal Quality Auditor for other Tarmac Sites
-
Trainee EngineerTarmac International (Major Projects) Sep 1986 - Feb 1988Conwy, North WalesProject – A55 Conway Crossing, North Wales/Block Release Wolverhampton PolytechnicWhilst on site acting as Site Engineer in charge of Earthworks setting out to Casting Basin for the Conwy Crossing, works included provision of batter rails and profiles for main dig. Co-ordinate setting out for 25,000No Band Drains for basin bed and profiles and co-ordinate setting out for 5km of Vibrated Diaphragm wall for basin cut off wall, reporting to Section Agent
Dave Jones Skills
Dave Jones Education Details
-
Civil Engineering -
Civil Engineering -
Ysgol AberconwyEnglish, Maths, Physics, Welsh, Geography, History, Technical Drawing, Latin
Frequently Asked Questions about Dave Jones
What company does Dave Jones work for?
Dave Jones works for Galliford Try
What is Dave Jones's role at the current company?
Dave Jones's current role is Galliford Try Group - Rail Interface, Assurance & Contractors Engineering Manager.
What is Dave Jones's email address?
Dave Jones's email address is da****@****y.co.uk
What schools did Dave Jones attend?
Dave Jones attended University Of Oxford, University Of Wolverhampton, Ysgol Aberconwy.
What skills is Dave Jones known for?
Dave Jones has skills like Civil Engineering, Highways, Bridge, Construction, Road, Contract Management, Earthworks, Construction Management, Drainage, Rail, Cost Management, Railway.
Not the Dave Jones you were looking for?
-
Dave Jones
Forres1bigtreeconsulting.co.uk -
Dave Jones
People Director @ Liberty Global / Head Of People / Highly Experienced Business PartnerBelper -
Dave Jones
Hereford -
Dave Jones
Leeds -
Dave Jones MCIPS
Procurement Leader With Extensive Experience In Several Sectors | Head Of / Director | Brings Collaboration, Improvement And PaceReading2yahoo.co.uk, efficioconsulting.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial