Quality Control Inspector
CurrentAs lead E&I inspector in the field, I was responsible for all Electrical and Instrumentation throughout the different plants on location: Including, ensuring the installations of engineered and field run tray, were up to code as well as to CNRL standards. EHT was installed and tested and all test information was recorded for testing and commissioning forms, Checking the installation of instruments and tubing as well as all loop checks to ensure correct operation of the instruments.