Tunnel Construction Manager
CurrentSalini Impregilio (ISG JV) – September 2014 to PresentRedline North, Doha Metro Project (€1.8bn) – Tunnel Construction ManagerClient – Qatar RailManaging construction of 23km of 6.170m internal diameter bored tunnel connecting nine stations of the Redline North section of the Doha Metro Project, utilising four 7.050m diameter EPB Herrenknecht TBM’s and associated follow on 23no cross passage (CP) construction and mechanical electrical plant (MEP) installation.Reporting to the Project Manager, duties include managing the construction of the tunnels, allocating resources, managing programme, guiding the teams with launch, driving and reception techniques of the boring machines and CP works. Minimising project construction risks through careful evaluation of construction methodologies.Managing interfaces with the station teams and other station contractors.As well as the tunnelling aspects, also managed the segment production factory, which saw production increase from 12 rings per day to over 45 rings per day; completing segment manufacture two months ahead of baseline programme.Leading by example, demonstrating a strong presence on site; encouraging the team and work force to put their own safety first, as well as maintaining high standards of safety, health, environment and quality throughout all aspects of the works.