AeroLeads people directory · profile

David Eremita Email & Phone Number

Manager: Canada Gas Pipeline Projects at TC Energy
Location: Calgary, Alberta, Canada 9 work roles 2 schools
1 work email found @tcenergy.com LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email d****@tcenergy.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Manager: Canada Gas Pipeline Projects
Location
Calgary, Alberta, Canada
Company size

Who is David Eremita? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

David Eremita is listed as Manager: Canada Gas Pipeline Projects at TC Energy, a with 218 employees, based in Calgary, Alberta, Canada. AeroLeads shows a work email signal at tcenergy.com and a matched LinkedIn profile for David Eremita.

David Eremita previously worked as Manager Capacity Capital Development Projects: Canada Gas at Tc Energy and Sr Project Manager - NGTL 2021 P at Tc Energy. David Eremita holds Bachelor Of Science (Bsc), Environmental Studies from The University Of Calgary.

Company email context

Email format at TC Energy

This section adds company-level context without repeating David Eremita's masked contact details.

{first}_{last}@tcenergy.com
86% confidence

AeroLeads found 1 current-domain work email signal for David Eremita. Compare company email patterns before reaching out.

Profile bio

About David Eremita

Possess over 20 years of experience managing small to large Oil and Gas projects that include Pipeline and Facility Construction, Emergency Response (Oil and Gas), Geo-technical, Class-Upgrades, Hydrostatic testing Programs, Pipeline Integrity Dig Programs (SCC / Corrosion) and Facility Decommissioning. Areas of strength include an ability to foster continuous improvement in the Project Management processes; Vendors / Contractors communication, Team building, Cost Estimating, Project Controls, Developing & Review of design drawings, Contract Development, Bid evaluations, Scheduling and Communication with Internal and External Clients.Decisive by nature; leverage strong skills in team work, diplomacy, conflict resolution and problem solving to create a balance between the need for consensus and the need to produce results on time .Bring forth a strong sense of commitment and professional standards to any project team.

Listed skills include Project Management, Project Planning, Regulatory Submissions, Environmental Compliance, and 24 others.

Current workplace

David Eremita's current company

Company context helps verify the profile and gives searchers a useful next step.

TC Energy
Tc Energy
Manager: Canada Gas Pipeline Projects
Calgary, AB, CA
Website
Employees
218
AeroLeads page
9 roles

David Eremita work experience

A career timeline built from the work history available for this profile.

Manager: Canada Gas Pipeline Projects

Calgary, Ab, Ca

Manager Capacity Capital Development Projects: Canada Gas

Current

Canada

Manager Canada Gas Development Projects - Pipeline & Compressor Stations.NCE - Bear Canyon: The Project includes approximately 25.0 km of 36-inch diameter (NPS 36) pipeline and tie-in facilities. The pipeline runs from the south connection at the NW35 Valve Site (SE-10-83-12-W6M), to the north connection at the NW51 Valve Site and Alces River Compressor Station (NE-14-85-13-W6M). North Star 2: Pipeline Project to safely deliver natural gas to the existing NGTL system in Alberta. The Project consists of approximately 24 km of NPS 48 pipe, looping from valve site NCCA100 to NCCA90 and associated facilities with a maximum operating pressure (MOP) of 9930 kPa. The Project is located approximately 20 km north of Manning, Alberta. The Project is located on Crown (19%) and Freehold (81%) land starting from NW-36-93-24-W5 and ending at NW-20-93-21-W5. The target in-service date is April 1, 2023.Red Earth 3: Pipeline Project to safely deliver natural gas to the existing NGTL system in Alberta. The Project consists of approximately 32 km of NPS 48 pipe, looping from valve site NCCA30 to NCCA40/Goodfish CS and associated facilities with a maximum operating pressure (MOP) of 9930 kPa. The Project is located approximately 45 km north of Red Earth Creek, Alberta. The Project is located entirely on Crown lands starting from SE-08-91-05-W5M and ending at SW-33-91-08-W5M. The target in-service date is April 1, 2023.Valhalla North: The proposed GPML Loop 4 (Valhalla North Section) component of the Project would be located in the province of Alberta within the Saddle Hills and Grande Prairie No. 1 counties. The installation of approximately 33 km of 48-inch diameter (NPS 48) pipeline starts at the existing NGTL Saddle Hills Compressor Station within SE 05-079-09 W6M, approximately 81 km northwest of Grande Prairie, and tie in to an existing NGTL valve site within NE 29-075-09 W6M, approximately 54 km northwest of Grande Prairie.

Feb 2022 - Present

Sr Project Manager - Ngtl 2021 P

Canada

Valhalla:The Valhalla Project : 36km of 48 inch diameter pipeline in the Grande Prairie region of Alberta. It starts from valve site GPM 120 approximately 30km west of Grande Prairie, and travels north to end at valve site GPM 143, approximately 50km northwest of Grande Prairie. The project also includes the associated tie-in facilities at these valve sites. The project will also contains a crossover to Albright North at about kilometer post 17 of the project. (Bear River, Anderson Creek, and the Highway 754 Pipeline Corridor crossings. These crossings will be crossed with a mix of open cut and track, auger, and HD Bore techniques).Elmworth:The Elmworth Project: 47km of 48 inch diameter pipeline near the Grande Prairie region of Alberta. It starts from valve site GPM 85 approximately 30km south of Grande Praire, and travels northwest to end at valve site GPM 115 and Pipestone Creek Compressor Station, approximately 40km west of Grande Prairie. The project also includes the associated tie-in facilities at these sites. Near the middle of the project at kilometer post 22, the project will install GPM 87, a mainline block valve assembly. (Wapiti River crossing by HDD (1050m) and steep slope construction at the Wapiti Valley).Karr:The Karr Project: 57km of 48 inch diameter pipeline in the Grande Prairie region of Alberta. It starts from valve site GPM 60 (Latornell Compressor Station) located approximately 86km southeast of Grande Prairie, and travels northwest to GPM 80 (Gold Creek Compressor Station) located approximately 35km south of Grande Prairie. The project also includes the associated tie-in facilities at these sites. Near the middle of the project at kilometer post 25, the project will install GPM 70, a mainline block valve assembly. (Smokey River crossing by HDD(950M) and the compressor station tie-ins at Latornell and Gold Creek stations).

Mar 2020 - Feb 2022

Project Manager: Canadian Gas Development

Calgary, Canada Area

Wapiti River HDD Crossing (1850m - NPS 36) Double Stopple By-pass.Etzikom & Maleb Lateral (64 km - Pipeline Abandonment: Sec 74 Application)NPS 42 WASML - Rocky View Project: WASML Loop (Rocky View Section) The project consists of approximately 21.5 km of NPS 42 pipeline and associated valve sites. The Project parallels the existing NPS 36 Western Alberta System Mainline (Airdrie Section – 1962) from WAS110-1-RT in NE 16-26-04 W5M to WAS100-1- ST in NE10-24-04 W5M. This Project is located primarily on freehold lands in Rocky View County, AB. The Project will be designed with an MAOP of 5,825 kPa and will include HDD of the Bow River (1050m) and SR1 Reservoir (650m), and major slip bores of HWY 1, HWY 1A, CP Rail.

Jul 2017 - Mar 2020

Project Manager Pipeline: Grand Rapids Pipeline Project

Transcanada Pipelines Limited

Calgary, Canada Area

Acting Project manager for GRP Pipeline scope responsible for the implementation of pipeline construction:• A 28 (km) long 914 (mm) (36-inch) diameter crude oil pipelinedesigned and constructed to move crude oil from northwest of Fort McMurray to theEdmonton market hub and connecting pipeline systems. (Spread 8 North section constructed to date)• A 460 km long 508 mm (20-inch) diameter crude oil pipeline designed and constructed tomove crude oil from the Edmonton market hub to northwest of Fort McMurray.Completed. Spread 1 (20-inch) Completed construction Q1 2016. Continue reclamation activities through Q4 2016. Spread 2 (20-inch): Completed "facility installation" construction Q4 2014. Continue reclamation activities through Q4 2016. Spread 3 (20-inch): Completed construction Q1 2016. Continue reclamation activities through Q4 2016. Spread 4 (20-inch): Continue reclamation activities through Q3 2016. Spread 5 (20-inch): Completed construction Q3 2015. Continue reclamation activities through Q3 2016. Spread 6 (20-inch): Completed construction Q4 2016. Spread 7 (20-inch): Completed construction Q4 2016. Spread 8 (20-inch and 28km of NPS 36-inch): Completed construction Q4 2016..

Jul 2015 - Jun 2017

Project Manager: Energy East (Quebec) Critical Crossings. (St Lawrence River Tunnel Crossing & Hdd'S

Transcanada Pipelines Limited

Calgary, Canada Area

The Energy East project is a 4,500 km pipeline that will transport, safely, about 1.1 million barrels of oil per day from Alberta and Saskatchewan to the refineries of Eastern Canada and a marine terminal in New Brunswick. Completed detailed engineering, feasibility studies and geotechnical assessments regarding three critical crossing locations within the province of Quebec. Crossings included -St. Lawrence Tunnel Crossing. Alignment, cross section, portal locations and anticipated geotechnical mitigation at the portals and along the tunnel alignment. Tunnel stability and support requirements along with key constructability issues and risks and associated mitigation measures. The project area is located approximately 22 km south west of Quebec City, QB. The battery limits for the work scope include the surface piping and river crossing that extended between Highway 132 on the south shore and Highway 138 on the north shore. The total pipeline length within this battery limit is 6750 m with the tunnel component encompassingapproximately 4400 m of the length.Second and third crossing areas of responsibility included the Geotechnical assessment, feasibility and design of the two critical NPS 42" - HDD crossings over the St. Maurice River and St. Sebastian River. (Approx. length of each HDD at 1.4 km

Jun 2014 - Jul 2015

Project Manager Keystone Om&A Canada

Calgary, Canada Area

Currently working as a Project Manager for Keyston OM&A Canada, responsible for the construction of 267 km of NPS 36 pipe from the southeast side of the South Saskatchewan River to the Canada/US Border (Grassy Creek Section); Install valve assemblies and associated piping, complete with high pressure piping, electrical, instrumentation and controls, associated foundations, and Final Cleanup.

Mar 2013 - Jun 2014

Keystone Xl Sr. Contract Analyst (Secondment)

Responsible for the negotiation and development of the Keystone XL; Steele City; Canada - Pipeline Construction Contracts. (570 km of NPS 36 Pipe) divided between two spreads (North and South), and associated Delay and Cancellation Schedules.

Aug 2012 - Mar 2013

Project Manager Pipline Maintenance Projects

Oct 2005 - Aug 2012
Team & coworkers

Colleagues at TC Energy

Other employees you can reach at cpg.com. View company contacts for 218 employees →

2 education records

David Eremita education

FAQ

Frequently asked questions about David Eremita

Quick answers generated from the profile data available on this page.

What company does David Eremita work for?

David Eremita works for TC Energy.

What is David Eremita's role at TC Energy?

David Eremita is listed as Manager: Canada Gas Pipeline Projects at TC Energy.

What is David Eremita's email address?

AeroLeads has found 1 work email signal at @tcenergy.com for David Eremita at TC Energy.

Where is David Eremita based?

David Eremita is based in Calgary, Alberta, Canada while working with TC Energy.

What companies has David Eremita worked for?

David Eremita has worked for Tc Energy, Transcanada Pipelines Limited, and Transcanada.

Who are David Eremita's colleagues at TC Energy?

David Eremita's colleagues at TC Energy include Clint Martin, Robert Jenkins, Lisa Carrier, Diana Roberts, and Joey Boone Boone.

How can I contact David Eremita?

You can use AeroLeads to view verified contact signals for David Eremita at TC Energy, including work email, phone, and LinkedIn data when available.

What schools did David Eremita attend?

David Eremita holds Bachelor Of Science (Bsc), Environmental Studies from The University Of Calgary.

What skills is David Eremita known for?

David Eremita is listed with skills including Project Management, Project Planning, Regulatory Submissions, Environmental Compliance, Aboriginal Relations, Emergency Management, Quality Management, and Contract Negotiation.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the David Eremita you were looking for.

View similar profiles