Interim Project Manager
Current- Preparing site operations for SAP implementation, developed process for barcode scanning and tracking through conversion operations to despatch Reconfigured product storage to achieve a 17% space saving eliminating the.
- Preparing site operations for SAP implementation, developed process for barcode scanning and tracking through conversion operations to despatch Reconfigured product storage to achieve a 17% space saving eliminating the.
- Transfer of the component stores operation from companies NDC to their manufacturing site. Achieved the transfer on time, on budget with 25% (5 head) labour saving.
- Following problems at factory, managed unplanned transferred of inbound, outbound and product conversion activities to an alternative site. Achieved transfer within 2 weeks with full conversion capacity within 1 month..