Sr Project Evaporator Manufacturing Engineer
Delphi Corporation, Thermal Systems
Existing Process & Continuous Improvement (2005 - 2009)Lead engineer for production support of existing evaporator manufacturing process for flame braze pipe attachment, leak test tooling, pipe end point gaging. Conducted Measurement System Analysis studies for major process measurements. Prepared for and supported ISO-9000 audits.Reduced noise generated machines from 85 dba to less than 80 dba through alterations. Led efforts to have 17 electric torque guns meet customer specifications for assembly.Led implementation of error-proofing to handle rejected parts in a separate process stream.Showed statistical conformance to specification supported by reduction of variation and re-targeting tooling process means for 11 evaporator models for CMM pipe end point capability. Led conversion of tooling for a model being reduced to a model increasing in volumes, saving $25,000 and 2 months time. Coordinated design, parts build, and conversion of in-production test fittings to reduce false test rejects by 53% over a 1 year period saving $27,000.Led the manufacturing plan for 10-41 year old service models to be built in the existing processes.Validated an automatic measurement system using MSA methodology to measure heat exchanger size, while conducting an automatic leak test process; saved $36,000 per year.Led process improvement to detect heat exchangers missing an internal part from being passed on to the customer, resulting in zero defects passed on from 18 defects in a 1 year period.