AeroLeads people directory · profile

David Ogle Email & Phone Number

Director of Facilities at T1 Energy Inc.
Location: United States, United States, United States 20 work roles 2 schools
1 work email found @renttherunway.com 3 phones found area 978 LinkedIn matched
✓ Verified Jun 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email · 3 phones

Work email d****@renttherunway.com
Direct phone (978) ***-****
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Director of Facilities
Location
United States, United States, United States
Company size

Who is David Ogle? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

David Ogle is listed as Director of Facilities at T1 Energy Inc., a company with 134 employees, based in United States, United States, United States. AeroLeads shows a work email signal at renttherunway.com, phone signal with area code 978, and a matched LinkedIn profile for David Ogle.

David Ogle previously worked as Facilities Manager - Head of Facilities Wilmer, TX Plant at Trina Solar and Director of Reliability Engineering and Maintenance at Rent The Runway. David Ogle holds Bs, Bsit from University Of Phoenix.

Company email context

Email format at T1 Energy Inc.

This section adds company-level context without repeating David Ogle's masked contact details.

{first_initial}{last}@renttherunway.com
86% confidence

AeroLeads found 1 current-domain work email signal for David Ogle. Compare company email patterns before reaching out.

Profile bio

About David Ogle

I’m a passionate leader with 31 Years of experience in facilities engineering and management. My broad range of experience spans from the Nuclear, Semiconductor and Solar Industries to the Retail Distribution business. I have played critical management roles and participated in projects ranging from 190 Million to 2 Billion dollars including retrofit of existing plants, submarines, construction of 3 new semiconductor plants and startup of 3 distribution centers. I am an experienced manager with hands on real world expertise. My work with ISO standards, lean manufacturing techniques as well as extensive regulatory knowledge has helped me to have a very successful career.Specialties: * 18 years of plant supervision and management experience.* 6 years’ experience in nuclear power plant operations.* Constructed and started a solar panel manufacturing plant and 4 Semi-Conductor Fabs high purity chemical distribution equipment* Enthusiastic, practical team player who takes the initiative.* Strive for superior performance in all aspects of work. * Project Manager over development of ERP Software system *Experienced in implementation of Lean Manufacturing techniques.*Multiple Amazon Patents Pending

Listed skills include Continuous Improvement, Manufacturing, Lean Manufacturing, Process Improvement, and 43 others.

Current workplace

David Ogle's current company

Company context helps verify the profile and gives searchers a useful next step.

T1 Energy Inc.
T1 Energy Inc.
Director of Facilities
United States
Employees
134
AeroLeads page
20 roles

David Ogle work experience

A career timeline built from the work history available for this profile.

Facilities Manager - Head Of Facilities Wilmer, Tx Plant

Current

Jiangsu, Changzhou, CN

Apr 2024 - Present

Director Of Reliability Engineering And Maintenance

Brooklyn, New York, US

Responsible for the Reliability Engineering and Maintenance teams at Rent the Runway. Ensuring a safe working environment for RTR team members.Fostering a Reliability-centered maintenance culture to optimize the facilities and production equipment performance, uptime and quality output.

Apr 2022 - Jan 2024

Dc Network Facilities Manager

Michaels Store
  • Responsible for Facilities, Engineering and Capital Development of Michaels Distribution Centers.
  • Creating Facilities Maintenance Organizational structure, defining roles and setting objectives.
  • Developed Facilities Organization KPI Metrics
  • Implementation of a Preventative maintenance program.
  • Improving reliability of distribution center equipment reliability by implementing a lifecycle replacement program and rejuvenation of fixed assets.
  • Identifying and implementing solutions to improve distribution center throughput and storage capacity.
May 2017 - Dec 2019

Owner/Developer/Project Manager

David Ogle Consulting

Provided Reliability Analysis and assisted with implementation at the ST Micro Electronics in their Catania Italy facility.Supported the MRP system I developed for Ashland Chemical's Semiconductor Parts Cleaning Business

Jun 2009 - May 2017

Global Facilities And Maintenance Manager/ Texas Site Manager

Quantum Global Technologies
  • Responsible to build a Global Facilities organization for Quantum’s 19 plants around the world.
  • Identify key performance indicators for the Facilities Department.
  • Establish best practices and processes to consistently operate and maintain Quantum’s Global Assets.
  • Implement and Maintain CMMS system
  • Implement SCADA systems throughout Quantum
  • Maintain and manage landlord relationships and lease terms
Oct 2015 - Sep 2016

Dfw7 Facilities Manager

Seattle, WA, US

  • Started up the first Amazon Sortable Kiva building with over 4500 Kiva Drive Units and 18 miles of automated conveyor and over 2.7 million square feet of production floor making it.Amazon's largest and most costly.
  • Hired and trained a team of 78 technicians and 8 managers.
  • Had the most successful and fastest startup ramp beating my previous ramp and output record at BNA3.
  • Submitted 12 patents with 5 pending approval Rotating Tamp Head Design - 2 patents Linear induction motor sorter/ divert mechanism Soft Drop - Divice that minimizes impact forces on items going into a gaylord Kiva.
  • Leading a team to standardize building inspections and regulatory tests/inspections
  • Leading a team to implement a Reliability Centered Maintenance program across the company
May 2013 - May 2015

Bna3 Facilities Manager

Seattle, WA, US

  • Started up BNA3 a 2.2 million sqft fulfillment center and helped the building achieve a world record of the fasted ramp to 400K units shipped in one day in history.
  • Through my leadership and planning BNA3 had one of most successful facilities Peak experiences in the Amazon network with minimal interrupts to production due to facilities equipment issues.
  • Hired 5 Facilities Area Managers
  • Hired trained a team of 38 technicians for both BNA3 and BNA2
  • Managed and developed a team of 3 FAMs that were all new to Amazon
  • BNA3 was one of the front runners in the implementation of EAM, leaping ahead of most buildings that began implementation 1.5 years before us.
Jul 2012 - May 2013

Phx6 Facilities Manager

Seattle, WA, US

Started and commissioned Amazon's largest fulfillment center in the world with over 2 million sqft of storage space and in excess of 10 miles of conveyance systems. Hired and trained a team of over 40 facilities technicians and 4 facilities area managers. Established numerous start up and facilities operations best practices. Managed all outside contracted.

Jun 2010 - Jul 2012

Facilities Manager

Washington, DC, US

  • Developed the staffing plan, budget and operational requirements for the facilities department at Evergreen Solar's new 450K sqft plant in Devens, MA
  • Determined which services would be outsourced such as landscaping, security, janitorial and food services through a make vs. buy analysis
  • Played an instrumental role in developing the safety and training programs for the plant.
  • Interfaced with the local officials for permitting issues
  • Led the facilities department and a commissioning agent to start up and commission the new plant
  • Worked with the construction contractor to identify and solve engineering and operational problems to ensure the plant would be reliable and safe
Jan 2008 - Jun 2009

Facilities Engineering Manager

Geneva, Switzerland, CH

  • Improved chemical and gas infrastructure through use of tools such as FMEA, SPC analysis and implementation of Lean Manufacturing Techniques
  • Completed construction of Bulk He system, 40 gas delivery systems and N2 generation plant
  • Completed construction of $13MM chiller plant
  • Participated in cross site team to improve facilities performance
  • Developed SOX compliance tools for US based plants inventory management using SAP data
  • Implemented new SCADA system including web interface for chemical and gas delivery systems
Feb 2006 - Jan 2008

Apci Tgcm Site Manager

Santa Clara, California, US

  • Responsible for a $4MM a year P&L as a vendor to Intel. In less than 3 years turned the business around from 3K profit to 700K while reducing the staff from 40 to 30 through the use of lean manufacturing techniques
  • Bid, negotiated and managed over $2 million in billable project work while project manager at Intel
  • Managed a team of 30 employees to operate and maintain Intel’s Chemical and Gas infrastructure at their Plant located in Hudson, MA
  • Improved chemical and gas system uptime, reduced injuries and improved profitably while also meeting the customer’s needs to reduce costs by 20%
May 1999 - Jun 2006

Site Manager

Allentown, Pennsylvania, US

Jul 2003 - Jan 2006

Process Engineer/Project Manager

Wilmington, Delaware, US

  • Hired and supervised a team of 14 technicians to oversee the installation of 54 chemical and slurry chemical blending and delivery systems at Intel
  • Participated in Intel’s Joint Engineering Team
  • Developed MRP application to run APCI’s new Parts Clean Division. This entailed managing 4 full time developers and a technical writer. The application supported three plants two in Phoenix and one in Dallas. I.
  • Administered MRP application in production environment:o Managing User Permissions to application moduleso Perform maintenance on master database and tableso Update business logic as neededo Develop requirements.
Feb 2001 - Jul 2003

Operations Supervisor At Intel

Wilmington, Delaware, US

  • Supervised 12 technicians to operate and maintain Intel’s chemical blending and delivery systems
  • Established operations and maintenance procedures and achieved ISO 9001 certification
  • Developed labor model for staffing needs based on activity levels
  • Made significant improvements to customer relationship and improved key performance indicators
May 1999 - Feb 2001

Ashalnd Equipment Engineering Technician

Samsung Semiconductor
  • Represented Samsung America’s interests regarding the chemical systems during construction phase of their new 200MM DRAM manufacturing plant in Austin, TX.
  • Started up and commissioned 20 chemical and slurry blending and distribution systems.
  • Established new maintenance and operations procedures
  • Standardized procedures for Lock-out Tag-out, Training, Inventory, communication and record keeping
May 1997 - May 1999

Air Liquide Chemical And Gas Technician

St. Peters, MO, US

  • Responsible for start up and commissioning of chemical, gas and slurry systems for MEMC Southwest’s new silicon foundry.
  • Shipping and receiving of chemicals and gases
  • Created procedures required for maintenance and routine operations
  • Performed preventive and corrective maintenance on chemical and gas equipment
May 1996 - May 1997

Nuclear Machinist Mate

Washington, DC, US

  • Machinist Mate Second Class.
  • Qualified Engine Room Supervisor on 626 and 637 class submarines
  • Operated and maintained nuclear power plant and steam plant
  • Emergency machinist
  • Maintenance Supervisor for Mechanical systems
Nov 1990 - May 1996
Team & coworkers

Colleagues at T1 Energy Inc.

Other employees you can reach at freyrbattery.com. View company contacts for 134 employees →

2 education records

David Ogle education

Bs, Bsit

University Of Phoenix

Certificaiton To Operate A Nuclear Power Plant, Nuclear Engineering Technology

Naval Nuclear Pipeline
FAQ

Frequently asked questions about David Ogle

Quick answers generated from the profile data available on this page.

What company does David Ogle work for?

David Ogle works for T1 Energy Inc..

What is David Ogle's role at T1 Energy Inc.?

David Ogle is listed as Director of Facilities at T1 Energy Inc..

What is David Ogle's email address?

AeroLeads has found 1 work email signal at @renttherunway.com for David Ogle at T1 Energy Inc..

What is David Ogle's phone number?

AeroLeads has found 3 phone signal(s) with area code 978 for David Ogle at T1 Energy Inc..

Where is David Ogle based?

David Ogle is based in United States, United States, United States while working with T1 Energy Inc..

What companies has David Ogle worked for?

David Ogle has worked for T1 Energy Inc., Trina Solar, Rent The Runway, The Michaels Companies, Inc., and Michaels Store.

Who are David Ogle's colleagues at T1 Energy Inc.?

David Ogle's colleagues at T1 Energy Inc. include Caroline M. Krohn, Didrick Kruse, Saksham Rohatgi, Hilde Rønningsen, and Mike Stephenson.

How can I contact David Ogle?

You can use AeroLeads to view verified contact signals for David Ogle at T1 Energy Inc., including work email, phone, and LinkedIn data when available.

What schools did David Ogle attend?

David Ogle holds Bs, Bsit from University Of Phoenix.

What skills is David Ogle known for?

David Ogle is listed with skills including Continuous Improvement, Manufacturing, Lean Manufacturing, Process Improvement, Engineering, Operations Management, Cross Functional Team Leadership, and Preventive Maintenance.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.