Principal Resident Engineer
Mott Macdonald Group
Abu Dhabi, United Arab Emirates
- Resident Engineer for project enabling works at Dubai Aluminium (DUBAL). Works comprised re-routing of 33 kV cables and installation of 11 kV/LV package substations for construction supplies.- Project Manager for the installation/upgrade of fifteen 11kV Diesel Generation/Switching Stations for Presidential Palaces and Hospitals within the Emirate of Abu Dhabi, site capacities ranging from 4.5 MVA to 15 MVA. New equipment installed included 11 kV switchgear, Transformers, 11 kV Cable, Diesel Generators, SCADA and civil works.- Technical assessment against fire insurance of damaged 11 kV switchgear at Jordan Phosphate Mining Company works. The assessment was carried out on behalf of Gab Robins Middle East, Chartered Loss Adjusters.- Project Manager for the installation of 36 Nos 33 kV/11 kV package substations, 10 Nos additonal transformers at existing primary substations, 80 km 33 kV underground cables and 14 Nos 11kV, 5MVAr capacitor banks. The complete works were installed on a fast track, 12-month programme, ready for peak loads in year 2000/2001 at Al Ain, UAE.- Project Co-ordination of site surveys, design studies and preparation of supply/installation specifications for equipment required to meet urgent Summer 2000/2001 loads in Al Ain area, UAE.- Project Manager for W17/3 132/11 kV substation and the refurbishment of 11 kV switchgear at W2 substation, Abu Dhabi, UAE.