AeroLeads people directory · profile

David Brockett Email & Phone Number

Senior Project Engineer Npi - Western Range Project at Worleyparsons
Location: Greater Perth Area, Australia 32 work roles 3 schools
LinkedIn matched
✓ Verified August 2026 3 data sources Profile completeness 100%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Senior Project Engineer Npi - Western Range Project
Location
Greater Perth Area, Australia

Who is David Brockett? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

David Brockett is listed as Senior Project Engineer Npi - Western Range Project at Worleyparsons, based in Greater Perth Area, Australia. AeroLeads shows a matched LinkedIn profile for David Brockett.

David Brockett previously worked as Area Manager - NPI and Mine - Balranald Mineral Sands Project at Worley and Senior Project Engineer NPI - Gudai-Darri 2 Project at Worley. David Brockett holds Civil Engineering from University Of Canterbury.

Company email context

Email format at Worleyparsons

This section adds company-level context without repeating David Brockett's masked contact details.

Worleyparsons

Review company-level records connected to David Brockett before choosing the right outreach path.

Profile bio

About David Brockett

Speciality: The too-hard basket.

Listed skills include Leadership, Project Teams, Six Sigma, Building Teams, and 48 others.

Current workplace

David Brockett's current company

Company context helps verify the profile and gives searchers a useful next step.

Worleyparsons
Worleyparsons
Senior Project Engineer Npi - Western Range Project
Perth, WA, AU
Website
AeroLeads page
32 roles

David Brockett work experience

A career timeline built from the work history available for this profile.

Senior Project Engineer Npi - Western Range Project

Perth, Wa, Au

Area Manager - Npi And Mine - Balranald Mineral Sands Project

North Sydney, Nsw, Au

Senior Project Engineer Npi - Gudai-Darri 2 Project

North Sydney, Nsw, Au

Delapidation inspection, report and estimate for Yandicoogina Camp in support of Gudai-Darri 2 (GDI) Pipeline. Authored strategy for inclusion in DES Report.

Jan 2023 - Apr 2023

Senior Project Engineer Npi - Western Range Project

North Sydney, Nsw, Au

Authored scope of work and contract documents and awarded contract for 1600 room construction accommodation camp. Managed 15% Design Review Workshop. Finalised definitive engineering study (DES), cost estimate for same and infrastructure (NPI) facilities for 25mtpa Western Range Project Iron Ore Mine. Coordinated stakeholders for NPI interface with earthworks, piping, telecoms and other design disciples, refresh of village and mine infrastructure concept drawings, owner and end user consultation, vendor liaison, effluent sprayfield site and soil evaluation, fire mitigation provision risk assessment, village operator strategy and market consultation.

Jun 2021 - Mar 2023

Senior Project Engineer Npi - Koodaideri/Gudai-Darri Project

North Sydney, Nsw, Au

Contract management – Package Engineer responsible for Enabling Works (780 bed relocated camp and new borefields) contractor (Pindan) including design and invoice review and approval, authoring formal letters and stakeholder coordination. Small maintenance contract formation.Design review, coordination and technical queries – coordination of design review of EPC contractor by client and Worley discipline engineers; design coordination of bore pad design including multidisciplinary engineering input, drawing development to sign off; and researching and responding to TQs on multi-disciplinary clarifications and dispensations from client specifications. Handover – divided package into systems; established deliverables list, file structure, checklists, trackers and certificates for Care, Custody and Control (CCC) handover to client. With others, sourced and vetted deliverables.Fire Strategy – oversaw client spec risk assessment to determine level of fire controls based on fire scenario impact to production. Guided project on suitable pre-hydrant measures and implementation on bushfire protection zones. Regulatory oversight – coordinated diesel tanks and refuelling facility Dangerous Goods paperwork and BCA advice.Quality oversight - coordinated factory inspections and testing, raised and tracked NCRs, oversaw MDR delivery.

Mar 2019 - Jun 2021

Civil Project Engineer

Henderson, Wa, Au

Responsible for management, materials, schedule, reporting and subcontractors for installation of underground services, overhead powerlines, NPI buildings and raw-water bore head-works, transfer station and 100km of HDPE pipeline. Concrete pour ordering, scheduling and inspections. Working FIFO 3&1.

Apr 2018 - Feb 2019

Senior Construction Engineer Ii

Assistant Package Manager for design and construction of 2,000 bed, $120m construction camp. Responsible Engineer (RE) for design of Construction Village Expansion camp - overseeing design review team and formal submittal and review of 1,500 documents. Finalised Plant site Permanent Buildings’ 4,500 as-built design documents. Compiled LNG Site requirements for blast overpressure and siting of temporary buildings prior to introduction of hydrocarbons to site. Subsequently developed execution strategy, obtained client approval, instructed and oversaw building relocation. Established register for 850+ temporary buildings using Jovix GPS asset management system. Developed and implemented project strategy for building code (NCC BCA) compliance following major change in state regulatory regime. Project interface for government regulatory agencies (Shire of Ashburton, Landcorp, Building Commission). Established work processes and provided technical and project guidance to project. Oversaw third party verification of project cyclone shelters to Australia/Queensland Design Guidelines for Public Cyclone Shelters. Worked out of Perth Office for four years then relocated to Onslow jobsite on a FIFO 26 & 9 roster.

Nov 2011 - Mar 2017

Senior Project Engineer

Leighton Contractors

Pre-pour inspections and quality paperwork for pre-cast concrete foundations and manholes (produced at Civmec factory) on $800m Gorgon LNG Civils and Underground Services subcontract.

Sep 2011 - Oct 2011

Site Engineer

Les Taylor Contractors

Set-out and as-builts for retaining walls, drainage, roads, stairs, carparks and kerbing using one-man Leica TCRP1205+ robotic EDM total station and Leica CS15 for enabling works of £120m RGU Science and Engineering Block. Liaised with main contractor (Laing O'Rourke), joiners, steel fixers, Design Engineer and Architect.

Jul 2010 - Nov 2010

Site Engineer

Halesowen, West Midlands, England, Gb

Set-out of glass curtain wall façade of new £57m, nine storey, University of Aberdeen Library to within 2mm. Transferred grid lines and datums between floors to within 2mm using Leica TPS850 EDM. Surveyed and as-built drawings of "halfen" locations for Façade Engineer.

May 2010 - Jul 2010

Section Engineer

Overland Park, Ks, Us

Responsible for setout (Leica TPS805 EDM) of structures and pipelines at Water Treatment Works including 30m x 30m Chlorine Contact Tank. Produced detailed as-built surveys and drawings for client & working site sketches for site staff. Ordered concrete and administered QA cubes regime. Ran site Permit to Dig scheme.

Apr 2008 - May 2009

Sub Agent

Morgan Est

Oversaw signage, road marking, lighting & footpath subcontractors for construction of two overpasses and assoc. side roads on dual carriage way (£12m). Authored and followed up Requests for Information. Put men to work. Daily senior site staff meetings. Contractors Representative at final road safety audit.

Jan 2008 - Apr 2008

Site Project Manager

Aberdeen, Scotland, Gb

Responsible for all site activities on £20m redevelopment of transport company HQ and local bus depot. Member of Project Design Team, ran daily site meetings, liaison between contractors, operating staff, consultants and project team; attended weekly progress meetings, reported quality & schedule. Organised office and personnel relocations, end-user consultations.

May 2007 - Oct 2007

Site Engineer

Bromborough, Gb

Set-out site office and yard (cabins, fences, paths). Worked at Gas Terminal under stringent Permit to Work scheme. Oversaw civils subcontractor Les Taylor.

Feb 2007 - Apr 2007

Section Engineer

Morgan Vinci Joint Venture

£120m 1.2km viaduct - the longest launched post-stressed curved box section. Responsible for establishing precast launch area. Maintained progress records; prepared quantity take-offs and Method Statements; checked steel and cover; ordered and scheduled concrete. Liaison between site staff, subcontractors and management. Used Leica DNA digital level to set bridge skidding beams ± 0.1mm.

Sep 2006 - Dec 2006

Measurements While Drilling (Mwd) Specialist

Houston, Texas, Us

Delivery of real-time downhole measurements to client on North Sea oil rigs, incl prep of tools, rig-up, rig-down, prepare logs, invoices and end-of-well reports. Ran night tours solo. 3 & 1 roster. Worked out of SLB Drilling & Measurements yard in Dyce, Aberdeen. Completed Measurements Specialist 1 nine week school in Sugarland, Houston, TX.

Nov 2005 - Jun 2006

Assistant Designers Site Representative

Responsible for final reconciliation of all Change Requests and Non-conformances into site maintenance manuals. Included arranging survey of all design changes, notifying CAD technician to update project model and recording in manual. £43m project.

Oct 2005 - Nov 2005

Site Engineer

Fletcher Engineering

Assisted with setting out, survey and as-builts of formwork and abutment works for pitched cantilever concrete box-girder bridge at Greenhithe, Auckland. Assisted with stressing tendons, QA of steel and concrete.

Feb 2005 - Apr 2005

Project Manager

Works Infrastructure

Panguru road rehabilitation - Project Manager – responsible for 15 men on $1.5m road rehabilitation: subsoil drains, post and panel walls, rock walls, gabion baskets, new culverts, new base and lime stabilisation. Put men to work, organised plant and materials, scheduling, remote accommodation and domestic staff.Whangarei asphalt crew - three months with a paving crew sealing carparks, tennis courts and roads. Also, painted asphalt plant, devised spreadsheet for operator to calculate stockpile volumes and worked with chip seal crew.Alexandra irrigation dam – Relief Project Manager – $1m earth dam with “Bentofix” aquatard.Gisborne road maintenance – Student Engineer – field and desk study for rural bridge replacement; cross sectional survey for road corner realignment; estimating, tender assessment; prep of various QA plans. Napier road construction – Student Engineer – site and desk survey of street reconstruction for extras claim, QA on highway corner pavement reconstruction, gabion basket construction.

Oct 2001 - Sep 2004

Storeman And Forklift Operator

Part time - sole charge loading and unloading air and sea freight containers, receiving, weighing and measuring freight and preparing produce imports for MAF inspection. Forklifts used extensively.

Mar 1998 - Nov 2001

Batch Plant Operator

Csr Readymix

Summer job - Mixed cement and water at surface-level plant and provided to underground operator on demand to backfill stope. Coordinated supply of cement and diesel. Lived in mine camp, on a 4 and 1 DIDO roster, on sole charge on night shift.

Nov 2000 - Feb 2001

In-Term Casual Work

Wellington, Wellington, Nz

Casual part time work undertaken as a student:- Fence construction - 1.8m high wooden front and side fence- Painting - interior and external house, fence, gate painting.- Gardening - mowing, tree trimming, weeding, concreting.- Building site - clean up, kanga hammer, roof truss erection, demolition.- Excavations - retaining walls, under house.- Labouring - moving large boulders.- Babysitting.

Feb 1995 - Aug 2000

Drainage Inspection Officer

Australian Water Technologies (Awt)/Infritrol

Summer job (x2) - inspection of town sections to identify stormwater illegally entering the sewerage system. Undertook letterdrop, met with occupier, inspected, identified any breaches, sketched situation then dispatched documents to head office. Liaised with public.

Nov 1998 - Feb 2000

Christmas Tree Salesman And Forester

Santa'S Forest

Summer job - matched customers to a tree, tagged for later or cut and loaded immediately on their vehicle.

Nov 1999 - Dec 1999

Student Engineer

Perth Airport, Western Australia, Au

Summer job - open-cast goldmine. Set up Mainpac maintenance scheduling software, authored manual and trained staff. Recorded daily plant production, plant and staff hours, survey chainman, drill and blast crew, drove Caterpillar 777C dump trucks.

Dec 1998 - Feb 1999

Electrical Trade Assistant

Talbot Electrical

Summer job - assisted Electricians wiring lights, running cables and trenching. Domestic and industrial installations including renovations at Hawke's Bay Hospital.

Nov 1997 - Feb 1998

Heritage Architecture Researcher

Wellington City, Wellington, Nz

Part time - updating WCC inventory of heritage buildings. Involved data processing, data entry and research skills.

Jul 1997 - Sep 1997

Precast Concrete Factory Worker

Unicast Concrete

Summer job - assisted in the manufacture of pre-cast and pre-stressed concrete panels, spun columns and beams for commercial buildings.

Nov 1996 - Feb 1997

Telephone Interviewer

Wellington , Nz

Part-time - evening polling of voters for their preferences for upcoming 1996 general election.

Jul 1996 - Oct 1996

Checkout Operator

Bella Vista, Nsw, Au

Part-time - included scanning, bagging, cashing up, stocktake and trolley collection

Jul 1993 - Feb 1995

Farmhand And Tradesman'S Assistant

Prairelands

After school and holiday work:- Boysenberry picking, worker supervision, fertilising, tying up and taking down cane, fruit packing.- Asparagus picking, packing, fertilising, disking, mowing, irrigating and weeding.- Raspberry, strawberry, black current, peaches, apples, pumpkins and gherkin picking.- Mechanical maintenance and repairs - overhauled cars, tractors, implements and light trucks.- House construction - set out, concreting, foundations, frame, lining, services, insulation, painting.- Tree feeling - Husqvarna 162 chainsaw use and axe woodcutting of pine and gum.- Landscaping and gardening - levelling 1,000m2 of lawn, mowing, planting and weeding.- Digging - trenches and well for wastewater drainage, moving aggregate.- Tractor operator - with trailer and implements.- Stockwork - herding and processing.- Orchard and vineyard work - plucking and tucking, thinning, spraying and post ramming.- Fishing - commercial eel fishing.- Hay carting.

Apr 1982 - Feb 1995
Team & coworkers

Colleagues at Worleyparsons

Other employees you can reach at worley.com. View company contacts →

3 education records

David Brockett education

Civil Engineering

University Of Canterbury

Architecture And Design

Victoria University Of Wellington

University Entrance Bursary

St John'S College, Hastings
FAQ

Frequently asked questions about David Brockett

Quick answers generated from the profile data available on this page.

What company does David Brockett work for?

David Brockett works for Worleyparsons.

What is David Brockett's role at Worleyparsons?

David Brockett is listed as Senior Project Engineer Npi - Western Range Project at Worleyparsons.

Where is David Brockett based?

David Brockett is based in Greater Perth Area, Australia while working with Worleyparsons.

What companies has David Brockett worked for?

David Brockett has worked for Worleyparsons, Worley, Civmec Construction & Engineering, Bechtel Oil, Gas, & Chemicals, and Leighton Contractors.

Who are David Brockett's colleagues at Worleyparsons?

David Brockett's colleagues at Worleyparsons include Vladimir Huaylla, Araceli Cepeda, Ryno Overbeek, Felipe D., and 周章勇.

How can I contact David Brockett?

You can use AeroLeads to view verified contact signals for David Brockett at Worleyparsons, including work email, phone, and LinkedIn data when available.

What schools did David Brockett attend?

David Brockett holds Civil Engineering from University Of Canterbury.

What skills is David Brockett known for?

David Brockett is listed with skills including Leadership, Project Teams, Six Sigma, Building Teams, Project Estimation, Epc, Technology, and Stakeholder Management.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.