Manager Strategic Infrastructure And Operational Planning
Brisbane, Australia
Responsible for developing efficient infrastructure and rail operations solutions across the network for future passenger and freight traffic, requiring detailed understanding of railway operations to ensure that capacity can be met in the most reliable and cost-effective manner. Activities that David had a significant involvement include:• Inner-city network capacity expansion, primarily the multi-billion dollar Cross River Rail project, where David's involvement has included future operation and sectorisation planning, rollingstock requirement definition, stabling requirements, new station layouts, operational modelling, connection to the existing network including operations during construction activity, and the EIS process.• Concept planning for new spur lines including the Moreton Bay Rail Link, Salisbury to Beaudesert line, and the Ripley Valley line. For each of these spur lines David developed operating plans showing the infrastructure requirements, stabling requirements, connections to the existing network ensuring that the new junctions are compatible with service plans over the next 40+ years, and station and termini layouts. David was also involved in visioning and risk workshops, and development of construction staging options.• Developing of a new stabling facility prioritisation programme, including identifying the financial and operational benefit gained by each of a suite of potential stabling locations, their indicative capacity, and the priority order in which they should be constructed. This is linked to the new rollingstock procurement program, in which I was involved in identifying the fleet size of the procurement lifecycle, taking into account the rate of delivery, the timetable requirements, and the rate at which old rollingstock can be retired. This work also included reviewing the project deed for the procurement, including the legal obligations that are imposed on the constituent parties.