David E. Mcaninch, Pe Email and Phone Number
David E. Mcaninch, Pe work email
- Valid
- Valid
David E. Mcaninch, Pe personal email
- Valid
Professional ProfileSenior Project Engineer with proven analytical and project experience in all types of power cycles including hydro, fossil, nuclear and renewable energy based power systems. Extensive experience in power plant theory and design with an emphasis in performance improvement. Strong team player that is skilled in a variety of engineering environments and capacities from design evaluation of power systems/components to project management of plant improvement projects using proven project management methods and procedures. Expertise in:Power Plant EngineeringProject ManagementProject DevelopmentEngineering EvaluationsConstruction ManagementRenewable EnergySpecialties: Technical & Specialized SkillsPower Piping Code (B31.1)Computer Heat Balance Modeling (GateCycle)ASME Code (Sect. I,III,VIII)Fire Protection/Suppression Systems Environmental Compliance ReviewsCritical Area Precision Cooling Systems (Liebert)
-
Senior Process EngineerFusion Integrated Solutions, Llc May 2015 - PresentMilwaukee, Wisconsin, UsProvide engineering support and project development for utility, pulp & paper and process industries specializing in all types of power and energy conversion cycles including renewable energy. -
Process Engineer VJacobs Engineering Group, Inc. Mar 2014 - May 2015Dallas, Tx, UsProvide engineering consulting and project engineering for clients in the paper and utility industry -
Senior Project EngineerClark Dietz, Inc. - Engineers Apr 2010 - Apr 2013Champaign, Illinois, UsProvided project development, engineering support and client marketing for various types of projects for a multidiscipline consulting engineering firm.- Participated in the development of a multimillion dollar bio-chemical process facility that produces base chemicals from renewable resources (wood chips) instead of from petroleum based fuels. Project was successfully bought out by a Canadian technology firm at an increased share value before the pilot plant stage.- Expanded client work base into utility project market through existing industry contacts. Resulted in contracting approximately $900,000 of new consulting work through a multi-year contract. -
Senior Project EngineerWisconsin Public Service Corp Jan 1999 - Jan 2010Provide engineering expertise, engineering support and project management for power and energy related projects. - Determined technical feasibility and recommended further development for a potential cogeneration project to supply steam for absorption cooling to a proposed data center using a complex heat balance model. - Found the single equipment noise source at a coal-fired power plant complex that was causing nearby complaints from a residential area and made cost effective recommendations to reduce or eliminate the noise. Extensive field testing and data analysis was required to determine and isolate the root noise source. - Eliminated a premature wear problem on coal railcar couplers by recommending a harder material for a pin support plated based upon the data analysis from field stress measurements. Project required extensive field design changes to adapt the test equipment to survive the field conditions while gathering and recording credible data.- Performed a 14 day emergency started up on standby power plant to re-stabilize the local power grid and increased plant power output by 58%. A normal plant start up would take 6-8 weeks.
-
Mechanical Design EngineerWisconsin Public Service Corp Jan 1985 - Jan 1999Provide mechanical engineering and technical support of design projects at new and existing nuclear, fossil and hydro electric generating facilities. - Developed technical details for conceptual design of various types of cogeneration plants using GateCycle computer modeling software. - Upgraded the precision cooling system and sealed up the computer room for the technical support area and the simulator building at the Kewaunee Nuclear Power Plant.- Determined the root cause and recommended a make-up air solution that eliminated the cold weather chimney effect in a 10 story power plant facility which was having a negative impact on personnel and daily plant operations.- Designed, installed and started up numerous black start back-up diesel engine electric generating facilities including cogeneration applications using engine coolant as a back-up heat source.
-
Plant EngineerCedar Falls Utilities Jul 1979 - Jan 1985- Provide technical support for the maintenance and operation of a 4 unit coal-fired power plant.- Analyzed technical data and made recommendations to optimize individual unit performance.- Supervised power dispatching with other utilities including short and long term power transactions through transmission system interconnections.- Started up and maintained a system control and data acquisition (SCADA) computer system.
-
Engineer IiWisconsin Electric Power Co Mar 1977 - Jul 1979- Performed design engineering for plant betterment retrofit projects at multiple coal-fired power plants.- Performed results engineering at 2 large coal-fired power plants (400 Mw & 1600 Mw) to solve operating and maintenance problems.
David E. Mcaninch, Pe Skills
David E. Mcaninch, Pe Education Details
-
Iowa State UniversityMechanical Engineering -
Right Management
Frequently Asked Questions about David E. Mcaninch, Pe
What company does David E. Mcaninch, Pe work for?
David E. Mcaninch, Pe works for Fusion Integrated Solutions, Llc
What is David E. Mcaninch, Pe's role at the current company?
David E. Mcaninch, Pe's current role is Senior Process Engineer at Fusion Integrated Solutions, LLC.
What is David E. Mcaninch, Pe's email address?
David E. Mcaninch, Pe's email address is de****@****ail.com
What schools did David E. Mcaninch, Pe attend?
David E. Mcaninch, Pe attended Iowa State University, Right Management.
What skills is David E. Mcaninch, Pe known for?
David E. Mcaninch, Pe has skills like Engineering, Power Plants, Energy, Mechanical Engineering, Project Management, Power Generation, Project Engineering, Nuclear, Factory, Piping, Autocad, Renewable Energy.
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial