President
CurrentHigh-Altitude Electromagnetic Pulse (HEMP/HAEMP) Design, shielding and assessment:• Power Grid/Substation Hardening• Military Command and Control Facilities• Critical Infrastructure/Civil Infrastructure Hardening• Industrial Infrastructure Hardening• HEMP hardened Electrical and Backup Power Generation• HEMP-hardened Generator/Battery/Inverter Systems• HEMP-hardened Mechanical/Filtration Systems• HEMP-hardened underground bunker facilities• Shield Effectiveness TestingHospital and Medical Research EMI/EMF Engineering, Shielding, and Assessment Services Davidson is and has been the EMI Engineer-of-Record for dozens of projects in this domainEMI/RFI for Nanotechnology/Semiconductor/Research Facilities:The Next-Generation of Nanotechnology, Semiconductor/Research facilities require new electromagnetic field abatement approaches and mitigation standards to ensure the full-capability of Next-Gen tools is assured. Radio-Frequency Assessment and Safety Services (RFI/EMI):Davidson brings vast experience working on this issue, and has been the engineer of record for RFI/EMI for high-profile projects (GSA Rooftop RF Safety Assessments, World Trade Center). Davidson has developed Assessment tools and 3-D modeling to provide state-of-the-art in compliance and RF engineering and RF exposure Technical Project ManagementDavidson is also an experienced project manager. A successful PM knows that project management goes beyond a detailed Gantt Chart – rather it requires a fully-resourced, costed, and accountable process that is constantly updated. With highly technical elements of projects that involve electromagnetic or other abstract physical elements, it is easy for architects and facility designers and planners to lose control over key parts of a project. Davidson can assist in these situations and bring PM plans back into control.