Davidson Sacramento, Pmp

Davidson Sacramento, Pmp Email and Phone Number

Master mechanical project engineer | AMG Brasil @ AMG Brasil
Davidson Sacramento, Pmp's Location
Belo Horizonte, Minas Gerais, Brazil, Brazil
Davidson Sacramento, Pmp's Contact Details

Davidson Sacramento, Pmp work email

Davidson Sacramento, Pmp personal email

About Davidson Sacramento, Pmp

I am a mechanical engineer with sixteen years of background, working as a project engineer, coordinator and team leader. I have post-graduation in project management and PMP certification. My career has been developed in great mining companies (beneficiation plants and pipeline systems for ore, tailing and water) and railways, including visits in several factories in Brazil as well as international experience in Canada, Europe (Holland, Spain and Italy), Mexico and Australia. I am native in Portuguese, fluent in English (C1 level) and intermediate in Spanish (B1 level) in progress.

Davidson Sacramento, Pmp's Current Company Details
AMG Brasil

Amg Brasil

View
Master mechanical project engineer | AMG Brasil
Website:
amg-br.com
Employees:
64
Davidson Sacramento, Pmp Work Experience Details
  • Amg Brasil
    Engineering Coordinator
    Amg Brasil Jun 2022 - Present
    Belo Horizonte, Minas Gerais, Brasil
  • Amg Brasil
    Master Mechanical Engineer
    Amg Brasil Jun 2021 - Jun 2022
  • Blossom Consult
    Engineering Coordinator
    Blossom Consult Mar 2020 - Jun 2021
    Belo Horizonte E Região
    Multidisciplinary coordinator for basic and detailing projects for Usiminas’ blast furnace 3 refurbish. Coordination of technical issues to guarantee the progress as well as the conformity between disciplines. Furthermore, reporting projects progress, solutions, improvements and leading the technical meetings with clients.
  • Ausenco
    Mechanical Engineer Leader
    Ausenco Apr 2019 - Mar 2020
    Belo Horizonte E Região, Brasil
    Mechanical and piping leader, composed by a team of designers, engineers and trainees. Responsible to coordinate technically and guarantee that all information is appropriated for purchase and construction regarding mechanical equipment and piping installations for conceptual, basic and detailing projects.Experience working in head office in Australia (Brisbane), to bring the best practices as well as learn to develop mechanical cost effective arrangements (lay outs) for beneficiation plants, including bulk material handling, adding value to projects in Belo Horizonte - Brazil and also responsible to develop team based on all above.
  • Brass Do Brasil Projetos E Consultoria Técnica Ltda
    Mechanical, Piping And Utilities Engineer Leader.
    Brass Do Brasil Projetos E Consultoria Técnica Ltda Mar 2017 - Mar 2019
    Belo Horizonte E Região, Brasil
    BRASS Engineering, Team leader. Since March/2017. Business: Mining – Pipeline pumping systems for ore, tailing and water. (Link)Mechanical and piping leader, moved by a team of designers, engineers and trainees (twelve professionals). I am responsible to guarantee that all information is clear and right for acquisition and construction of mechanical equipment and piping installations for conceptual, basic and detailed projects. Pipeline projects demand preparation of technical documentation regarding equipment lists, technical specifications, data sheets, quantities spreadsheets, technical analysis with issue of reports, electromechanical documentation package for contracting and construction as well as mechanical and piping arrangement, isometric drawings, material lists, piping supports and spools. Management of the sector, planning, monitoring and controlling the development of the project as well as distributing and controlling the tasks to the engineering staff.- Meetings with clients to understand their needs and ensure them into the projects.- Frequent reports about the portfolio of projects, presenting the efficiency of resources, needs, tendencies and estimated conclusion.
  • Progen
    Mechanical Engineer - Project Equipment Leader
    Progen Apr 2016 - Mar 2017
    Belo Horizonte, Minas Gerais
    PROGEN, working at VLI - (Railway Logistics Company part of the group Vale, Mitsui and Brookfield). Senior Mechanical Engineer. Abril/2016 to March/2017. Business: Railways.I worked as a member of VLI´s engineering staff and I was responsible for equipment (new and for reformation) with a budget about 150 million USD, to be installed on greenfield and brownfield projects in several workshops all over Brazil for locomotives and wagons, for maintenance of their rolling stocks fleet. All activities to comply the needs for equipment like cranes, wheelset presses, hauling vehicles, drop tables, lapping machines, boring machines, lathes, brake systems, etc. Also visits in Europe (Italy).- Elaborating the technical documentation package as well as analysing technical proposals from manufacturers to provide the best recommendation. Additionally, checking suppling documentation, following the fabrication, monitoring the installation at the workshop and making the final verification for technical acceptance of delivered equipment and services.- Supporting conceptual and basic engineering, including the lay out of workshop and project checking.- Interfacing with operations and maintenance teams to understand their technical requirements.- Management of contracts regarding equipment and services.- Technical visits in other workshops for site surveys, premises definitions and operational needs to provide improvement of productivity and process.- Research of new suppliers for technical and commercial alternatives for VLI, including reports issues.- Leading meetings for following up queries and technical discussions into the engineering staff.
  • - Freelancer
    Consulting Project Manager
    - Freelancer May 2015 - Mar 2016
    Belo Horizonte, Minas Gerais
  • Lhoist
    Engineering Coordinator
    Lhoist Oct 2013 - May 2015
    Arcos - Minas Gerais, Brazil
    Belocal, Lhoist Group: Project Coordinator. October / 2013 to May / 2015. Business: Mining of lime and production of limestone in Limeira unity, Arcos city, Minas Gerais state. (Link)At this role I was in charge for projects to expand, improve or restore installations into the plant in operation, establishing premises, specifying equipment, providing technical and commercial analysis, composing and managing budgets, contracts, civil construction, electromechanical assembly and commissioning. Also, I had to execute the planning, decide equipment purchases, labour contracting for erection and assembly, mobilization of own team, control the costs and the project schedule. Technically, I had to provide arrangement studies, estimate multidisciplinary budgets, elaborate of proposals about installation of receiving, storage and production of milk of lime in customers’ factories (sugar and alcohol, Anglo American, Usiminas, Dow, Fibria, etc.). In operation on site, I was key member to promote meetings with the production and maintenance departments to identify needs and for improvement possibilities. My multidisciplinary team was formed by ten professionals (engineers and technicians).
  • Mmx
    Engineering Coordinator
    Mmx Nov 2010 - Sep 2013
    Belo Horizonte E Região, Brasil
    November/2010 (senior mechanical engineer) to September/2013 (engineering coordinator) Business: Mining of iron ore.Initially as senior engineer I analysed all technical documentation from the contracted companies and supervised the development of the mechanical sector in projects for installations already in operation as well as evaluating more suppliers to be included in the “vendor list” as option for the company. After my promotion to coordinator I was the engineer leader to conduct the new projects on large scale for extraction and beneficiation plants of iron ore with a staff composed by fifteen professionals (engineers and technicians) involving all areas. Following is the breakdown of the main portfolio (Serra Azul project, budget of five billion USD):1. Beneficiation plant to produce 29 million tons per year of pellet feed, with big capacity equipment as crushers, mills, screens, flotation and columns cells, GEHO pumps, thickeners, belt conveyors, compressors, pumps.2. Concentrate pipeline to pump iron ore from the beneficiation plant to the filtering plant.3. Filtering plant where concentrated slurry iron ore is processed by the ceramic disc filters.4. Terminal railway: where filtered iron ore is handled by stackers and reclaimers, after it is expedited to the wagon loading system that is mainly composed by a modern and complex package of equipment monitoring and controlling the level of product being filled and polymer application at the end to avoid loss of material. There was a complex interface with the existing railway installation to increase productivity and prevent accidents. 5. Tailing pipeline to pump from the beneficiation plant up to the dam.6. Water capitation to bring water to the beneficiation plant.7. Common to all projects:- Preparation of technical documents to compose de Environment Impacts Study.- Visits in Canada and Europe (Holland and Spain) to follow up projects and manufacturing.
  • Sei Consultoria E Projetos
    Project Engineer - Trainee To Senior
    Sei Consultoria E Projetos Jan 2004 - Nov 2010
    Belo Horizonte Area, Brazil
    Business: Engineering and consultant for mining projects.I was responsible to elaborate all mechanical technical documentation about beneficiation plants, also coordinating internally the development in projects to bauxite, gold, copper, iron ore, potassium chloride and zinc (companies like Vale, Alunorte, Votorantim, Yamana Gold). Furthermore, I analysed technical proposal from suppliers including reports with best recommendation. I also was in charge to carry out visits in supplier’s factories to follow-up, inspect and report issues. I led a team composed by eight professionals (engineers and designers) who helped me to develop beneficiation plant layouts, elaborate steel plate works drawings and ensuring multidisciplinary interfaces. To finish, I was a team member during the implementation of the project Usina Hidrometalúrgica de Carajás (Canaã dos Carajás, estado do Pará), following up the construction for one year and helping eith solutions at the site.
  • Quater Engenharia Ltda
    Trainee
    Quater Engenharia Ltda Jul 2002 - Sep 2003
    Belo Horizonte Area, Brazil
    QUATER Engineering: Trainee from 2002 to 2003 Business: Hydroelectric plants.Preparing and controlling mechanical technical documentation about hydroelectric plants for Aimorés and Queimado projects (basic and detailed projects to CEMIG customer).

Davidson Sacramento, Pmp Skills

Engenharia Engenharia De Projetos Engineering Microsoft Project Planejamento De Projetos Processamento Mineral Autocad 5s Project Planning Project Engineering Project Management Pmi Comissionamento Continuous Improvement Mining Aprovisionamento Factory Manufacturing Microsoft Office Steel Solidworks Planejamento Bachelor Cad Microsoft Word Microsoft Powerpoint Microsoft Access Pmp Microsoft Excel

Davidson Sacramento, Pmp Education Details

  • Instituto De Educação Tecnológica (Ietec)
    Instituto De Educação Tecnológica (Ietec)
    Project Management
  • Puc Minas
    Mechanical Engineering

Frequently Asked Questions about Davidson Sacramento, Pmp

What company does Davidson Sacramento, Pmp work for?

Davidson Sacramento, Pmp works for Amg Brasil

What is Davidson Sacramento, Pmp's role at the current company?

Davidson Sacramento, Pmp's current role is Master mechanical project engineer | AMG Brasil.

What is Davidson Sacramento, Pmp's email address?

Davidson Sacramento, Pmp's email address is da****@****.com.br

What schools did Davidson Sacramento, Pmp attend?

Davidson Sacramento, Pmp attended Instituto De Educação Tecnológica (Ietec), Puc Minas.

What are some of Davidson Sacramento, Pmp's interests?

Davidson Sacramento, Pmp has interest in Mineral Projects, Project Managment, Coordination, Coacher, Mechanical Engineering.

What skills is Davidson Sacramento, Pmp known for?

Davidson Sacramento, Pmp has skills like Engenharia, Engenharia De Projetos, Engineering, Microsoft Project, Planejamento De Projetos, Processamento Mineral, Autocad, 5s, Project Planning, Project Engineering, Project Management, Pmi.

Who are Davidson Sacramento, Pmp's colleagues?

Davidson Sacramento, Pmp's colleagues are Keila De Cássia Rodrigues Dequech, Gabriela Nogueira, Isabela Zampieri, Jefferson Ferreira, Flávia De Carvalho Oliveira Silva, Frederico Roque, Marcos Vinícius.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.