Monitoring & Instrumentation Coordinator
CurrentROGUN HYDROPOWER DAM PROJECT - 3600MWThe Rogun Dam project consists of the construction of a 335-metre-high clay core rockfill dam, tallest in the world and to have a crest length of 660 metres. Its design also includes the building of six hydroelectric generating units.FIDIC- EPC CONTRACT Main function : Monitoring of the structure - follow up of the instrumentation - Control on site of the instrumentation activities : installation and maintenance- Analysis of the structure, interpretation of discrepancies with the expected behavior and proposal for mitigation measures- Technical review of documentation (drawings, technical specification, method statement, monitoring report, Pre- Installation, Installation Sheet Forms.)-Preparing Design Review Sheet-Preparing Monthly Reports, Monthly Monitoring Report, Monthly Progress Report - Managing the interface between the Contractor and the Client. -Site CoordinatorSupport of the team specialists on the following topic : Hydrology ; Sedimentation ; Geology ; Grouting - Fondation treatment ; Risk analysis : Contractual issues