Dave Cromeenes Ii

Dave Cromeenes Ii Email and Phone Number

Production Manager at Priority Plastics Inc. @ Priority Plastics Inc.
portland, indiana, united states
Dave Cromeenes Ii's Location
Portland, Indiana, United States, United States
Dave Cromeenes Ii's Contact Details
About Dave Cromeenes Ii

Blow Molding Process Specialist with 25+ years of technical and operations experience. Specialties: Uniloy Extrusion (& Accumulator Head) Blow Molding, PWDS System, Automatic Liquid Packaging, Aseptic Processing, Form/Fill/Seal technology.

Dave Cromeenes Ii's Current Company Details
Priority Plastics Inc.

Priority Plastics Inc.

View
Production Manager at Priority Plastics Inc.
portland, indiana, united states
Employees:
96
Dave Cromeenes Ii Work Experience Details
  • Priority Plastics Inc.
    Plant Manager
    Priority Plastics Inc. Jul 2024 - Present
    Portland, Indiana, United States
  • Priority Plastics Inc.
    Production Manager
    Priority Plastics Inc. Oct 2020 - Jul 2024
    Portland, Indiana, United States
  • Priority Plastics, Inc.
    Supervisor
    Priority Plastics, Inc. Aug 2013 - Oct 2020
    Portland, Indiana
  • Haemonetics
    Molding Technician
    Haemonetics Apr 2010 - Aug 2013
    • Integration, installation, validation, and conditioning of ISTECH designed level III automation providing ultrasonic weld and print apply labeling in line with blow molding equipment.• Installed a modern 10-cavity Uniloy UMS24.D extrusion blow molding machine manufacturing 1000 ml collection bottles.• Validated extrusion machine, ultrasonic welding equipment, and assembly processes for plasma pooling bottle devices.• Implemented preventative maintenance tasks for 3 manufacturing areas consisting of: 5 molding processes, 2 ATS super-track assembly cells, and other ancillary equipment using MAXIMO software.• Performed routine equipment maintenance, mechanical work and implemented process changes.• Made appropriate repair recommendations for malfunctioning equipment and performed work based on agreed upon action.• Handled preventive and corrective maintenance to maintain proper equipment safety and functionality.• Evaluated procedures and results for accuracy and determine appropriate next steps. Followed safety rules and procedures.• Developed attendance tracking & safety observations databases for manufacturing facility using Microsoft Access 2007.• Facility start up - execution of installation, engineering studies, operational, and performance qualifications documentation packages for primary operating machines as well as ancillary equipment. • Preparation of manufacturing and equipment operating instructions and product history record documentation packages.• Technical training provided for existing employees at sister facility.
  • Kimberly-Clark
    Maintenance Technician Iv
    Kimberly-Clark Jan 2001 - Jan 2009
    Responsible for manufacturing safety, quality and efficiencies of two Aseptic manufacturing operations and equipment with an asset value of over $4 million dollars. Directly involved with the transfer and relocation of assets from US to Mexico including the procuring of new assets and supporting equipment. Administer departmental budgets and spending in excess of $1.3 million dollars annually. Responsible for training, developing, and motivating 7 new employees prior to company-wide layoff.• Sustained production efficiency of 107.8% production performance compliance between 2007 and 2008 through continuous improvement initiatives.• Attained all-time monthly net production record over 4 million units, besting normal production by 8% leading to a step change for annual production to 45.5 million units.• Identified and performed factory and site acceptance testing of new operations equipment. • Setup new and existing transferred equipment to new location.• Wrote validation protocols and performed testing of startup location.• Trained maintenance and operations employees at startup location to develop understanding of process equipment.• Improved online inspection of product defect by implementing new inspection device lead to decreased inspection time and increased product quality.• Facilitate refurbishment of existing and procurement of new mold to alleviate product deficiencies and improve product quality resulting in annual capacity increase of 1.5 million units or $250,000 additional sales volume. • Modified Blow-Fill-Seal equipment to obtain a class 100 particulate environment within the critical fill zone. This project resulted in anticipated savings of $2MM appropriated to purchase replacement equipment.• Improved machine efficiencies through cycle time reductions for Blow-Fill-Seal process resulting in annual capacity increase of 3.5 million vials or $600,000 additional sales volume. Annual production in excess of 39.5 million vials.
  • Kimberly-Clark
    Lead Manufacturing Process Technician
    Kimberly-Clark 1996 - 2001
    Responsible for product assembly and maintaining product quality through visual inspection quality checks. Responsible for manufacturing safety, quality and efficiencies of Aseptic operations. Achievements included: • Introduced a down time/reject tracking program• Increased productivity in the ALP department by 30 percent. • Annual output went from 28 million vials to 36 million vials resulting in an additional $1,360,000 sales volume.

Dave Cromeenes Ii Skills

Lean Manufacturing Automation Fda Process Improvement Engineering Iso Preventive Maintenance Microsoft Excel Gmp V&v Medical Devices Microsoft Office Manufacturing Operations Clean Rooms Quality Control Start Ups Ultrasonic Welding Aseptic Processing Iso 13485 Process Simulation Quality Assurance Software Documentation Process Validation Equipment Installation Knowledge Transfer Continuous Improvement Manufacturing Planned Preventative Maintenance Excel Process Development Compliance Quality Maintenance Planning

Dave Cromeenes Ii Education Details

  • Western International University A Division Of University Of Phoenix
    Western International University A Division Of University Of Phoenix
    Business (Aab)
  • Murray High School
    Murray High School

Frequently Asked Questions about Dave Cromeenes Ii

What company does Dave Cromeenes Ii work for?

Dave Cromeenes Ii works for Priority Plastics Inc.

What is Dave Cromeenes Ii's role at the current company?

Dave Cromeenes Ii's current role is Production Manager at Priority Plastics Inc..

What is Dave Cromeenes Ii's email address?

Dave Cromeenes Ii's email address is dc****@****msn.com

What is Dave Cromeenes Ii's direct phone number?

Dave Cromeenes Ii's direct phone number is +180188*****

What schools did Dave Cromeenes Ii attend?

Dave Cromeenes Ii attended Western International University A Division Of University Of Phoenix, Murray High School.

What skills is Dave Cromeenes Ii known for?

Dave Cromeenes Ii has skills like Lean Manufacturing, Automation, Fda, Process Improvement, Engineering, Iso, Preventive Maintenance, Microsoft Excel, Gmp, V&v, Medical Devices, Microsoft Office.

Who are Dave Cromeenes Ii's colleagues?

Dave Cromeenes Ii's colleagues are Jennifer Garringer, Ronald Rutherford, Robert Mcdonough, Cherrelle Vigil, Orlando Cage, Justin Shaneyfelt, Andrew Srenco.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.