Deepak Gupta work email
- Valid
Deepak Gupta personal email
Over 40 years experience in O&M, Detailed design, Construction, Installation, Testing and Commissioning, and Quality and Safety audit of electrfied railway systems, both in India and abroad.
Aasha Infinite Foundation
View- Website:
- aashainfinite.org
- Employees:
- 68
-
Student MentorAasha Infinite FoundationMumbai, Mh, In -
Railway Electrification ConsultantSelf Employed Jul 2016 - PresentMumbaiPart time engagement with PMC consultants (M/S Systra-Mott MacDonald JV) for Design and Construction of OHE and TPS for New Bhaupur-Mughalsarai section of the Eastern Dedicated Freight Corridor
-
Semi RetiredEx Railway Apr 2021 - Sep 2021India MalaysiaAt last settled down peacefully
-
Railway Electrification ExpertMott Macdonald (Formerly Hlsp) May 2015 - Dec 2020New Delhi, Delhi, IndiaQuality and Safety Audit Consulting for DFCCIL Eastern Freight Corridor, New Khurja-New Bhaupur project
-
Adviser/Systems Manager, Electrification WorksMmc Gamuda Jv, Malaysia Jul 2010 - Dec 2012MalaysiaGovt. of Malaysia is building a new 329 km long electrified double line north of Kuala Lumpur. I was leading the Design Review Team for Railway Electrification Work. Key responsibilities included technical reviews of the designs for Traction Power Supply, OCS, Control and Protection, and Power SCADA submitted by the Sub-contractor (Balfour Beatty Ansaldo STS JV). Close monitoring and follow up of progress, approvals, construction at site, post commissioning defects liability was also a part of my responsibility. -
Specialist Consultant, Electrification WorksKlia Consultancy Services, Malaysia Jun 2008 - Jun 2010Kuala Lumpur, MalaysiaKey responsibilities included Project Management, Design Reviews of submissions, Material approval, Quality Assurance, Testing and Commissioning for a new 100 km long Railway Electrification Project in Malaysia
-
General ManagerIndian Railways Apr 2003 - Oct 2005West Central Railway, Jabalpur, Mp, IndiaAs the first full-time General Manager of a new Railway Zone, I had to create systems from scratch where none existed. Responsibilities included setting up new Railway HQ, initiating monitoring and Control functions, developing terminal facilities, enhancing through-put and reducing wagon turn round time, smoothening operations in the Iron Ore, Cement and Coal belt of Central India, massive up gradation of Rail infrastructure including building a new 58 KM long electrified double line diversion of New Delhi-Mumbai Trunk Route. -
Chief Electrical EngineerWestern Railway, Ir Jul 2001 - Apr 2003Mumbai Area, IndiaMy primary task was to ensure that suburban services as well as long-distance trains on electrified portions of Western Railway ran smoothly. I planned and executed the change-over from 1500 V dc to 25 kV ac on the Vasai-Virar section (main-line trains). One of the key challenges was the retro-fitment of DC EMUs into Dual-Voltage EMUs capable of operating under dc and ac traction.
-
Divisional Railway Manager, Chennai DivisionSouthern Railway, Ir Feb 1995 - Feb 1997Chennai Area, IndiaI Initiated steps to improve operational efficiency of Railway services. The Division received the GM's Efficiency shield for best overall performance in both years of my tenure
-
Director, Traction InstallationResearch, Design And Standards Organisation, Ir Feb 1994 - Jan 1995Lucknow Area, IndiaI initiated development of OHE designs for High Speed, computer-based SCADA systems for Traction Power Supply monitoring and control, cost-effective Railway Electrification, Dynamic Simulation studies of Pantograph-OHE interaction for assessment of current collection at high speeds etc.
-
Chief Electrical Engineer (Construction)Northern Railway, Ir Feb 1993 - Jan 1994New Delhi Area, IndiaI completed electrical construction projects worth USD 6 m relating to electrification of Main Lines on 25 kV ac. in Northern Railway.
-
Additional Divisional Railway ManagerNorthern Railway, Ir Aug 1989 - Jan 1993Allahabad Area, IndiaMy job involved guiding discipline managers in train operation and asset maintenance in fully electrified Division.
-
Dy. Gm/GmRites Ltd (Consulting Arm Of Indian Railway) Aug 1984 - Jul 1989New Delhi Area, IndiaThird Party Inspection, Quality Assurance, Type and Routine Tests on Traction Equipment on behalf of Indian Railways. I visited the Works of Reputed OEMs across the Globe and interacted with their Team of Designers, QA/QC engineers, Technical managers -
Sr, Dee TrdIndian Railways Jul 1983 - Jul 1984Bhusawal Division, Central Railway, IrKey responsibilities included Operation and Maintenance of OHE, TPS, SCADA etc; regular dialogue was maintained with the SEB Engineers for power availability and reliability; Developed “COMFORT”, a system for concentrated maintenance of OHE. This system required pooling of resources of adjacent OHE Depots so that effective output per block went up. Track machines could also be deployed if required -
Jt. Director Standards ElectricalIndian Railways Dec 1978 - Jun 1983Rdso, Lucknow, Ministry Of Railways.I had the onerous responsibility of development of robust designs for Traction Motors and other rotating machines. I visited the works of Bombardier, Canada in connection with engineering designs for the Electrics of new Diesel-Electric Locomotives. I also visited the Works of Fuji Electric, Suzuka, Japan for detailed discussions on engineering designs of Traction Motors ordered by IR for EMUs operating in Mumbai Suburban. -
Deputy Director ElectricalIndian Railways Apr 1976 - Dec 1978Lucknow/Bhopal, IndiaKey responsibilities included:1. “Third-party” inspection at BHEL, Bhopal on behalf of IR2. Type Tests, Routine Tests on Traction Motors, Transformers and other traction machines 3. Introduced changes in manufacturing practices, composition of varnish, SQC, acceptance sampling techniques -
Senior Electrical Engineer, Metropolitan Transport ProjectIndian Railways Apr 1974 - Mar 1976New Delhi Area, IndiaIn the conceptual phase of Delhi Metro, I was entrusted with the work of conducting studies relating to general power supply requirements, air-conditioning and ventilation of underground sections. These two years helped me gain insight into the power supply and HVAC systems adopted by Metro Railways in the World as also Calcutta Metro. -
VariousIndian Railways Dec 1968 - Apr 1974VariousIn my formative years on IR, I was exposed to all facets of electric traction including O&M of assets (Electric Locomotives, OHE, PSI, SCADA,), Design Engineering, Project Management, Construction supervision, Fault Analysis, Root Cause analysis, FMEA etc. Postings in the initial years:1. Probation period, Electrical Department, IR: 2 years2. AEE (RS), Electric Loco-shed, SE Railway, Tatanagar: 2 years3. SEE (Traction Motors), SER HQ, Calcutta: 6 months4. DEE (M), Chakradharpur Division, SE Railway: 10 months
Deepak Gupta Skills
Deepak Gupta Education Details
-
University Of RoorkeeElectrical Engineering -
Agra UniversityPhysics, Chemistry, Maths
Frequently Asked Questions about Deepak Gupta
What company does Deepak Gupta work for?
Deepak Gupta works for Aasha Infinite Foundation
What is Deepak Gupta's role at the current company?
Deepak Gupta's current role is Student Mentor.
What is Deepak Gupta's email address?
Deepak Gupta's email address is gu****@****o.co.in
What schools did Deepak Gupta attend?
Deepak Gupta attended University Of Roorkee, Agra University.
What are some of Deepak Gupta's interests?
Deepak Gupta has interest in Voracious Reader Of Fiction, Yoga, Watching Natgeo, Soft Music, Non Fiction, Management Books, Extreme Engineering, History.
What skills is Deepak Gupta known for?
Deepak Gupta has skills like Rcm, Fault Tree Analysis, Engineering Management, Metro, Specifications, Contract Management, Project Engineering, Systems Engineering, Scada, Infrastructure, Root Cause Analysis, Commissioning.
Not the Deepak Gupta you were looking for?
-
Deepak Gupta
Pune -
Deepak Gupta
Gurgaon -
Deepak Gupta
Thane -
-
Deepak Gupta
Gurgaon
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial