AeroLeads people directory · profile

Denis Lenoir Email & Phone Number

PROJECT MANAGER, TECHNICAL MANAGER at Gassim
Location: Republic of the Congo, Congo 6 work roles 1 school
1 work email found @socotec.com LinkedIn matched
✓ Verified August 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email d****@socotec.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
PROJECT MANAGER, TECHNICAL MANAGER
Location
Republic of the Congo, Congo
Company size

Who is Denis Lenoir? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Denis Lenoir is listed as PROJECT MANAGER, TECHNICAL MANAGER at Gassim, a with 8 employees, based in Republic of the Congo, Congo. AeroLeads shows a work email signal at socotec.com and a matched LinkedIn profile for Denis Lenoir.

Denis Lenoir previously worked as Directeur délégué at Gassim and Directeur projet at Gassim. Denis Lenoir holds Construction Ingineer, Construction Management, Diplome Obtenu from Afpa ( Vocational Training).

Company email context

Email format at Gassim

This section adds company-level context without repeating Denis Lenoir's masked contact details.

{first}.{last}@socotec.com
86% confidence

AeroLeads found 1 current-domain work email signal for Denis Lenoir. Compare company email patterns before reaching out.

Profile bio

About Denis Lenoir

Self-taught, I give a new dynamic impulse to my career in 2007 with a diploma of civil work engineer obtained in vocational training center in order to reach the managariale functions after a rewarding experience in building supplies. Recruited as site supervisor after my training, I contribuated to the success of the project by my involvement in the site requirements. After this first successful experience in production and management of manpower (400 people), I was recuited as site superintendant in 2010 by GEMO. Under the responsibility of the project manager, this experience has allowed me to get a very know-how in the site documents procedures, compliance with technical clauses and safety. Recruited as project manager by Socotec in 2012 to manage a project of Congolese construction ministry, i had to face with the complexity of a public market, I succeeded through my capacity to dialogue and negotiate to delivery my project on time and without budget overspending. At the end of my contract (June 2016), I was called by FM SERVICES, Brazzaville, Congo to take up the post of technical manager. Present at the creation of the company, this job is a new challenge for me. Through my professional skills and the wealth of my career, I provide guarantees on the credibility of the company , increase customers loyality and new markets over a short period of time. In 10 years, by my personnal commitment in the success of the projects to wich I participated, I reached my personal aim to get technical / construction management position but I stay ready for new challenges.

Listed skills include Project Estimation, Contract Management, Construction Management, Mep, and 16 others.

Current workplace

Denis Lenoir's current company

Company context helps verify the profile and gives searchers a useful next step.

Gassim
Gassim
PROJECT MANAGER, TECHNICAL MANAGER
france, aquitaine, france
Website
Employees
8
AeroLeads page
6 roles

Denis Lenoir work experience

A career timeline built from the work history available for this profile.

Directeur Délégué

Current

Bénin

Phase préparatoire projet : faisabilité , pré esquisses , calcul enveloppe budgétaire, rédaction des termes de référence et consultations pour constituer l'équipe projet ,analyse des offres.Coordination des études archi/BET/consultants spécialisés/BCT, suivi des études et des validations,Supervision des chefs de projet en phase travaux et réception

Jan 2022 - Present

Directeur Projet

Cotonou, Littoral, Bénin

Mar 2019 - Dec 2021

Technical Manager

Fm Services

Congo

FM Service offers extensive facility management services including consulting and technical support. I am in charge of: Technical management for 47 residential and commercial buildings including specialized subcontractors for air conditioning, generators, elevators, fire department. Various projects as consultant / expert building for contracting owner and project management within the framework of the services provided in the contracts. Project management for “Nantaise des eaux “(French company specialist of wastewater treatment plant precast) for its projects in Congo.

Jul 2016 - Dec 2018

Project Manager

Brazzaville (Congo)

The Congolese Ministry of Construction in joint venture (GIE) with Chinese company (WIETC) had a project of 300 high-quality housing units spread over 18 buildings 5 floors, average surface area of ​​180 m2 per apartment (estimated cost of The operation 300 million USD). Socotec was designed in 2012 as consultant. I was recruited to be project manager to set up organization and reach the objectives. I have : Coordinated studies and production of architectural and work drawings in order that the production is never stopped by lack of drawings. Made the work schedule according to the tasks and the delays of supplies by air and sea freight. Advised and assisted the client in his technical choices in order to anticipate and optimize maintenance of the buildings . Tracking of production and run all wekly meetings. Supervised testing-commissionning and all the related contractual documents. My management of client, contracting authority, delegated contracting authority, architect and main contractor hallowed the first delivery in May 2015 (7 buildings) , the second (4 buildings) in November 2015 and The last in June 2016.

Jan 2013 - Jun 2016

Site Supervisor

Gemo

Angola

GEMO was consultant for TTA2 tower, main office of TOTAL (gas and oïl company) in Angola.Project cost US$200,000,000; Build up area 37, 000 m2, 17 levels with two ancillary buildings. The first with 10 levels includes an auditorium and parking (500 spaces), restaurant (can accommodate 1000 people/day). The second comprises the machinery rooms and technical premises. Under the responsabily of the project manager I managed:- Compliance with the specifications, submittals, French standards and European fire norms- Coordination between client, developer, architect, main contractor and technical controller for the conformity with French regulations for high building and public building- In charge of the planning, I followed the progress, doing needed corrective schedule and organizing a daily (coordination and safety) meeting with the general contractor and the sub-contractors- Control of monthly progress report shown by the main contractor, I checked also the claims, made no conformity record (NCR) and followed the corrective actions - Testing-commissioning; supervision of MEP tests (HVAC, fire protection, plumbing, elec) , punch lists, furniture’s installation planning, final cleaning , building delivery I contributed towards to the handing over at the right time with quality conform to European regulations and norms

Jan 2010 - Aug 2012

Site Superintendant

United Arab Emirates

Oger was main contractor for UAE University Development Projects – Al Ain U.E.A. Project cost US$400,000,000, Build up area of 245,200m2 with 10 - 7 level Residence Building,1 Kitchen & Dining Building, 3 Sports Facilities Building, 5 Engineering & Science Bldg., 6 Laboratory Building, 1 Library, Great Hall & Office. I was in charge of accommodation building (420 rooms), handing over 2009, November- I supervised and coordinated all works from concrete up to the finishes- I optimized the masonry (30000 m2 for my building ) doubling the daily production- I proposed variations to the consultant in order to simplify some tasks- New organization with the general foreman to increase the production with better repartition of the manpower(400 people) - I managed the safety on my area (PPI, company safety rules)- In collaboration with QAQC department , I guaranteed the quality of the work done I decreased cost and delay and improved the quality of masonry/finishes

Aug 2007 - Dec 2009
Team & coworkers

Colleagues at Gassim

Other employees you can reach at gassim.eu. View company contacts for 8 employees →

1 education record

Denis Lenoir education

  • Afpa ( Vocational Training)
    Afpa ( Vocational Training)
    Diplome Obtenu
FAQ

Frequently asked questions about Denis Lenoir

Quick answers generated from the profile data available on this page.

What company does Denis Lenoir work for?

Denis Lenoir works for Gassim.

What is Denis Lenoir's role at Gassim?

Denis Lenoir is listed as PROJECT MANAGER, TECHNICAL MANAGER at Gassim.

What is Denis Lenoir's email address?

AeroLeads has found 1 work email signal at @socotec.com for Denis Lenoir at Gassim.

Where is Denis Lenoir based?

Denis Lenoir is based in Republic of the Congo, Congo while working with Gassim.

What companies has Denis Lenoir worked for?

Denis Lenoir has worked for Gassim, Fm Services, Socotec, Gemo, and Oger Emirates Llc.

Who are Denis Lenoir's colleagues at Gassim?

Denis Lenoir's colleagues at Gassim include Jerry Fiifi Donkor, John Idakwo, Jean-Francois Louis, and Wofai Ewa - Fnse, Prince 2.

How can I contact Denis Lenoir?

You can use AeroLeads to view verified contact signals for Denis Lenoir at Gassim, including work email, phone, and LinkedIn data when available.

What schools did Denis Lenoir attend?

Denis Lenoir holds Construction Ingineer, Construction Management, Diplome Obtenu from Afpa ( Vocational Training).

What skills is Denis Lenoir known for?

Denis Lenoir is listed with skills including Project Estimation, Contract Management, Construction Management, Mep, High Rise, Project Control, Quantity Surveying, and Primavera P6.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Denis Lenoir you were looking for.

View similar profiles