Dennis Mcclung Email and Phone Number
Dennis Mcclung work email
- Valid
Dennis Mcclung personal email
Develop training curriculum and performance tasks for Equatorial Guinea students. Classroom instruction and workshop performance. Conduct weekly Safety Meetings.
Confidential
View-
Instrument, Electrical, Process Control ConsultantConfidential Sep 2022 - Present -
I&E Technical TrainerWood Sep 2021 - Sep 2022Aberdeen, Gb -
Instrument, Electrical, Process Control ConsultantConfidential Mar 2020 - Sep 2021
-
I&E Technical InstructorWood Dec 2012 - Dec 2017Aberdeen, Gb -
Sr. I&E Reliability SpecialistAscend Performance Materials Jan 2008 - Dec 2012Houston, Texas, UsLead and participate in Reliability Centered Maintenance (RCM), Root Cause Failure Analysis (RCFA), Mean Time Between Failures (MTBF), and Failure Modes Effects Analysis (FMEA). Responsible for all UPS systems in the plant. Oversee I&E project work from design to commissioning. Provide support for I&E Technicians. Review and develop Maintenance Work Practices. Revamp I&E Training system from the old to task based. -
I&E Project Construction ManagerThe Turnaround Management Company Jun 2006 - Jan 2008• Job duties include set up and participate in walk-through of all ABF I&E design packages. Coordinate last minute design changes with the field from S&B designers. Maintain master mark-up set of drawings on all I&E packages for as-built purposes. Make decisions and give approvals to field to deviate from Issued for Construction design packages. (Track RFI's or JCO's) Assist in tracking down lost tagged instrument items for field installation. Track construction progress to date on all ABF I/E Job Notes. (Report on a percentage complete basis)
-
Consultant For Instrument & Electrical PlanningCommonwealth Engineering & Construction Sep 2005 - Jan 2006Job duties include planning and scheduling for a major turnaround scheduled to start the first quarter of 2006. The project scope was to prepare the refinery for a five year run with no shutdowns. Responsibilities included coordinating and scheduling the retrofitting or replacement and installation of approximately 250 control valves. Coordinated the procurement and scheduling of all flow orifices and restrictor orifices to be replaced. Coordinated the procurement and scheduling of all transmitters to be upgraded, relocated, and repaired. I assisted with three major capital projects along with numerous smaller capital projects going on during the 31-day turnaround window. Estimated time and material for each activity then purchase all required material. After the planning and scheduling phase assumed the construction/coordinator role for the turnaround
-
Group LeaderSaudi Aramco Jun 1998 - Sep 2003Responsibilities included leading a group of operators and maintenance men in developing tests for re-certification of Aramco employees. Was responsible for development and delivery of all tests. Developed Honeywell graphics for the new Computer based tests. Was responsible for setting up and maintaining ten test facilities. Converted the old paper based tests to a computer-based format. Selected employee of the year 2000.
-
I&E SpecialistCelanese Jul 1990 - May 1998May 1996 - May 1998Jul. 1990 - May 1998HOECHST CELANESE Bishop, TX Instrument Specialist Two pharmaceutical units at the Bishop, TX plantMay 1995 - May 1996Kunming, China Instrument, Electrical, and Analyzer SpecialistTemporary assignment to Kunming, ChinaResponsible for all Electrical, Instrument, and Analyzer calibration, installation, inspection, commissioning, and start-up.Aug. 1994 - May 1995Bishop, TX Instrument and Electrical Specialist Was responsible for all I&E work in two pharmaceutical units at the Bishop plant.Jun. 1993 - Aug. 1994Jubail, Saudi Arabia Instrument and Electrical Commissioning Technician Hoechst Celanese joint venture MTBE Unit in Jubail, Saudi Arabia• Was responsible for the installation of all control room equipment, the safety shutdown system, and keeping up with all red line drawings. Calibration, commissioning, and start-up.Jul. 1990 - Jun. 1993Bishop, TX Instrument and Electrical Specialist Pharmaceutical Division at the Hoechst Celanese Bishop Plant• Coordinated all of the major shutdowns in both units and assisted I&E engineers. Developed and documented calibration procedures for all instruments in both the Acetaminophen and Ibuprofen units. Developed and documented Preventative Maintenance Programs and set up the instrument loop folders. Developed spreadsheets for tracking the calibration of NIST certified test equipment.
-
I&E TechnicianVarious Companies Jan 1977 - Jun 1990Greenwich, Ct, UsCheck-outs and start-ups with increasing responsibilities.
Frequently Asked Questions about Dennis Mcclung
What company does Dennis Mcclung work for?
Dennis Mcclung works for Confidential
What is Dennis Mcclung's role at the current company?
Dennis Mcclung's current role is Instrument, Electrical, Process Control, Technical Instructor, Consultant, Performance Evaluations.
What is Dennis Mcclung's email address?
Dennis Mcclung's email address is de****@****eng.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial