Construction Engineer
Chicago, Il, Us
Construction Walkthrough Manager - IL Tollway General Engineering Consultant (2017 - Present)-Schedule, assign staff and perform Pre-Final and Final Construction Walkthroughs.-Schedule, assign staff and perform inspections, report defects, coordinate contractor notification, negotiate required corrective action, coordinate CM staff to inspect corrective work, and verify correction for work covered by the one-year guarantee against defective workmanship and various individual warranties on the IL Tollway System.-Review maintenance of traffic and constructability for preliminary, prefinal, and final plans. -Perform annual reviews and updates to Construction Manager's Manual, Roadway Traffic Control and Communications Manual, Quality Standard for Traffic Control Devices, and Standard Drawings for Maintenance of Traffic. -Present updates at the annual ACEC / Illinois Tollway Design and Construction Practices Workshop. Assistant Resident EngineerI-90 Widening and Reconstruction; IL 25 to Higgins Rd. for the ILTollway (2015 - 2017)Construction Value: $107.2 millionResident EngineerI-90 Retaining Walls, Noise Walls, and Drainage Improvements; Barrington Rd. to Roselle Rd. for the IL Tollway (2014-2015)Construction Value: $22.4 millionResident EngineerWilmington-Peotone Rd. and Old Chicago Rd. over Jordan Creek for the Will County Division of Transportation (2012 - 2013)Construction Value: $4.4 millionAssistant Resident EngineerI-55 / Arsenal Road Interchange Reconstruction for the Illinois Department of Transportation (IDOT) (2011)Assistant Resident EngineerI-55 Noise Abatement Walls: US 30 to Weber Road for IDOT (2009 to 2011)Construction Value: $8.9 millionDocumentation EngineerI-55 Widening, Resurfacing and Bridge Improvements; US 30 to Weber Road for IDOT (2007 to 2009)Construction Value: $53 millionConstruction EngineerI-94/IL 394 from 159th Street to Thornton-Lansing Road for IDOT (2006)