AeroLeads people directory · profile

David G. González B. Email & Phone Number

Location: Ecuador 16 work roles 3 schools
LinkedIn matched
✓ Verified Jul 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
Gerente de Control de Proyecto
Location
Ecuador
Company size

Who is David G. González B.? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

David G. González B. is listed as Gerente de Control de Proyecto at Servicios de Proyectos (minería, petróleo, industrial), a with 6 employees, based in Ecuador. AeroLeads shows a matched LinkedIn profile for David G. González B..

David G. González B. previously worked as PMP - Consultant (Project Services) at Bedrock-Service and PMP - Planning and Project Control Superintendent at Ausenco. David G. González B. holds Master In Project Management, Project Management, 92 from Universidad Particular De Especialidades 'Espíritu Santo.

Company email context

Email format at Servicios de Proyectos (minería, petróleo, industrial)

This section adds company-level context without repeating David G. González B.'s masked contact details.

Servicios de Proyectos (minería, petróleo, industrial)

Review company-level records connected to David G. González B. before choosing the right outreach path.

Profile bio

About David G. González B.

I’m a bilingual mechanical engineer with technical and administrative experience in Project Management, Project Control and Project Planning for mining, oil, gas, refinery, and cement industries. For more than eighteen years I´ve been part of medium and large size capital projects within and abroad the country, working as owner, owner’s representative, and main contractor. These experiences mainly have consisted in Project Management, engineering coordination, construction, and commissioning of greenfield and brownfield industrial projects. I’m interested in taking bigger challenges, assuming roles such as Project Control Manager, Project Manager to effectively delivery projects to the owner.

Current workplace

David G. González B.'s current company

Company context helps verify the profile and gives searchers a useful next step.

Servicios de Proyectos (minería, petróleo, industrial)
Servicios De Proyectos (Minería, Petróleo, Industrial)
Gerente de Control de Proyecto
Ecuador
Employees
6
AeroLeads page
16 roles

David G. González B. work experience

A career timeline built from the work history available for this profile.

Gerente De Control De Proyecto

Servicios De Proyectos (Minería, Petróleo, Industrial)

Ecuador

Pmp - Consultant (Project Services)

Current

Ecuador

Subject of Matter Expert, Consultant, in Project Controls and Project Management related matters for IPR and Peers Review studies, for mining and infrastructure projects, collaborating with the owner in authorization stage, moving from Feasability to Execution phase. In charge of Project Controls Department (planning, costs, reporting, document control and contract administration) for a greenfield cooper, gold and other metals open pit mine, production plant and off-site and in-site facilities and infrastructure. Working on behalf of the owner in an integrated team, to manage EPCM, EPC and General contractors and consultants. The project is transitioning stage from FS to Execution phase with a CAPEX of 300 musd during a 30 months timeline to start production.

May 2024 - Present

Pmp - Planning And Project Control Superintendent

Toamasina, Atsinanana, Madagascar

Conceptual planning up to project authorization, including preliminary construction works for an EPCM contract with Ambatovy Minerals to implement “Ore Slurry Pipeline Replacement” brownfield project to replace 75 km x 24” pipeline in an existing major industrial operation of nickel and cobalt, during a multi-year replacement campaign. CAPEX 350 musd Scope: earthworks, roads access upgrade, valve station upgrade and pipeline replacement in critical sections. Including temporary camps and facilities to allocate own and contractor personnel, equipment and material required for the execution phase of the project.- Prepare and collaborative review SoW for main packages.- Planning and Cost Control Procedures development.- Prepare and follow up Project Master Schedule (PMS) according with owner operational yearly shut down needs and strategy.- Prepare multi-level schedules for different project stages and shareholders’ approval.- Prepare and follow up subsidiary schedules and project performance KPIs.- Review and validate contractor monthly progress and invoices.- Contract management support.

Nov 2022 - Oct 2023

Pmp - Project Manager

Quito

Project Cayambe: greenfield project to implement a dry process plant to produce ultra-fine calcium carbonate, with 120.000 TMPY capacity and CAPEX investment of 12 MUSD. Scope: earthworks, roads, platforms, primary crushing, milling and coating, storage silos, packaging, administrative, process and warehouse buildings, workshops, medium voltage substation, mechanical, electrical, automation erection and process plant commissioning. - Local responsible for permits, design, procurement, execution and commissioning of the new plant, allowing a smooth transition from existing operation to the new plant.- Develop SoW packages for bidding and contractual processes.- Detailed engineering coordinator, contract management and on-site supervision.- Responsible legal permits required by the project construction.- Project control, schedule follow up, cost and reporting to the project board. MM3 Project: EPCM to implement a new line of calcium carbonate production for fines and treated products. 1.8 MUSD investment.- Detail engineering coordinator, work packages specification development and site supervision overseeing construction and erection contractors for the new lines.Solar plants: technical specification and pre-contractual documents development to implement solar facilities of Omya group in LaTam

Jul 2018 - Oct 2022

Pmp - Senior Planning Engineer

Riobamba, Ecuador

Planning and follow-up of Chimborazo Project: EPCM to implementation of a new clinker plant. - Project planning in Primavera P6, MS Project and WBS chart Pro- Follow-up meetings with Last Planner and 3 weeks look ahead methodologies- Audit and field follow-up of contractors- Daily, weekly and monthly contractor’s reports review- Project and Contracts Analysis using Earn Value Management methology

Jan 2017 - Jun 2018

Pmp - Epcm Planning & Project Control Manager

Oilserv Sa

Guayaquil, Ecuador

Engineering, Procurement, Construction Management contracts in La Libertad and Esmeraldas Refineries with EP Petroecuador y main contractors- Planning and analysis of projects and contracts - Provide projects and contract's alerts to accomplish requirements given by the client- Contract Administration Support Engineer- Project Control procedures development and implementation- Implementation of control and management tools: Primavera, Last Planner System, and others

May 2016 - Nov 2016

Pmp - Project Control Coordinator

Ecuadorian Jungle

Contract with Petroamazonas EP, Block 43 – ITT: 24”, 18” and 10” pipelines construction, 63 km length; river crossing by horizontal direction drilling, power cable and fiber optics cables installation, between Block 43 and Block 31. Contract amount: USD $90.000.000,00- Planning, tracking and reporting of daily, weekly and monthly project’s development - Resources assignment and control to develop construction activities- Provide project’s alerts to accomplish requirements in schedule, performance and cost- Works Certification and Billing responsible- Contract Administration Support Engineer

Aug 2015 - Apr 2016

Pmp - Senior Planning And Project Control Analyst

Ecuadorian Jungle

Contract with Kamana Consortium, Block 12. Service amount: USD $10.000.000,00- Analysis of EPC Projects for optimization and increasing oil production- Planning and tracking of facility projects: platforms, civil works, electromechanical assembly, commissioning and start up- Project reporting of Engineering, Production and Costs

Jan 2015 - Jul 2015

Pmp - Project Control Chief

Ductos Del Pacifico

Antofagasta, Chile

Contract with Minera Escondida Limitada – BHP Billiton: 10 inches, 164 km length concentrate pipeline, with internal HDPE liner; fiber optic, launch, monitoring and valve stations. Contract amount: USD $ 150.000.000,00- Head of project control, cost control, programming and planning areas for Escondida Concentrate Transport Project (ECT)- Contract Administration support: analysis and development of technical claims- Monitoring and performance analysis of projects with tools like Last Planner System, Primavera P6, Balance Score Card, Highlight report and tendencies report

Sep 2013 - Jul 2014

Project Coordinator

Sertecpet S.A.

Quito - Ecuador

Contracts with Pardaliservices Consortium and Petroamazonas EP, Blocks 56, 57 and 58- Construction planning and scheduling of projects for oil production increasing and new facilities construction- Resources management, personnel selection, materials approval for the construction of pipelines; electromechanical assembly; civil, control and instrumentation works- Scope, time, cost, quality, human resources and procurement management- Reports to the Board: cash flow, costs and profit of the projects.

Mar 2013 - Aug 2013

Planning, Project And Cost Control Coordinator

Ecuadorian Jungle

Contracts with Petroamazonas EP, Block 15 and Pañacocha field- Shipping pumps electromechanical mounting and connection into lact unit- Civil, mechanical and electrical works for 5 oil wells in Palmeras Norte- Civil, mechanical and electrical works for 5 oil wells in Yamanunka- Road enlargement, platform construction and oil facilities in Yuca 9- Construction of fire protection system and gas blanketing system in Paka Sur- Civil work for 4 shipping pumps in Jivino B- Electrical and mechanical assembly for 2 oil wells in Jivino C- Civil, mechanical and electrical enlargement works for 5 oil wells in Yanaquincha Este- Civil and electromechanical assembly for 5 wells in Pañacocha C and 3 in Pañacocha AContract with Petroamazonas EP, Block 7- Road construction and platform for 5 wells in Oso G- Civil works and electromechanical assembly for 6 wells in Oso B- Early production facilities in Oso B- Civil, mechanical, electrical and instrumentation works for 10 wells in Oso A

Sep 2011 - Nov 2012

Construction Superintendent

Ecuadorian Jungle

Contract with Petroamazonas EP, Block 12, Pañacocha field- Civil works, mechanical, electrical and control assembly for 3 wells in Pañacocha A- Civil works, mechanical, electrical an control assembly for 4 oil wells in Pañacocha B- Mechanical and electrical completion for 3 oil wells in Pañacocha C

Mar 2011 - Aug 2011

Project Control Engineer

Ecuadorian Jungle

Contract with Petroamazonas EP, Block 15, CPF- Operations support and construction services in Block 15Contract with Petroamazonas EP, Pañacocha field- 16”, 32 km length pipeline, power cable, optic fiber from Pañacocha to EPFContract with Agip Oil Ecuador B.V., Block 10, Villano A- Biphasic Separator assembly and 5000 bls water production tank construction. Contract with Petroamazonas EP, Block 15, Edén Yuturi and Indillana- Facilities enlargement works for 8 additional wells in WID- Access road, civil and underground works, platform and facilities for 8 wells in WIK- Civil, mechanical, electrical and instrumentation works for 2 wells in WIC- 12” pipeline, access road, platform and facilities for 8 wells in Aguajal- Road, access bridge, exploration platform and rig operation facilities in Tuntiak- Platform, mud pit, civil works, electromechanical assembly for 6 wells in Yamanunka- 8” water pipeline, civil works, electromechanical assembly for 2 wells in Jivino A- Facilities construction and platform enlargement for 3 wells in Pañayacu- Early production facilities construction in Palmar Oeste- Civil works, mechanical, electrical and instrumentation works for 3 wells in Paka Sur

Jul 2008 - Feb 2011

Construction And Support Services Supervisor

Ecuadorian Jungle

Contract with Petroamazonas EP, Block 15, Edén‐Yuturi- Planning, coordination and execution of miscellaneous construction work- Oil wells completion and start up.- Road and platforms maintenance - Supervision of support personnel, crews and equipment- Work daily reports

Dec 2006 - Jun 2008

Plant Supervisor Engineer

Productos Paraíso

Quito

- Production, maintenance and workers’ Supervisor at the polyethylene recycling plant- Developed preventive maintenance plans for the building and the machinery

Jul 2006 - Nov 2006

Lab Assistant

Laboratorio De Ensayos No Destructivos, Escuela Politécnica Nacional

Quito

- Led non-destructive lab practices with alumni- Preparation and grading of exams and lab reports- Develop of external industry request in NDT analysis and welding qualification

Apr 2005 - Mar 2006
Team & coworkers

Colleagues at Servicios de Proyectos (minería, petróleo, industrial)

Other employees you can reach at bedrock-service.com. View company contacts for 6 employees →

3 education records

David G. González B. education

Mechanical Engineer, Mechanical Engineering, 8.0

Ecuador's registry N°: 1001‐06‐681972 Chile´s registry N°: N°615/2014

Bachillerato, 9.0/10

Colegio Gonzaga
FAQ

Frequently asked questions about David G. González B.

Quick answers generated from the profile data available on this page.

What company does David G. González B. work for?

David G. González B. works for Servicios de Proyectos (minería, petróleo, industrial).

What is David G. González B.'s role at Servicios de Proyectos (minería, petróleo, industrial)?

David G. González B. is listed as Gerente de Control de Proyecto at Servicios de Proyectos (minería, petróleo, industrial).

Where is David G. González B. based?

David G. González B. is based in Ecuador while working with Servicios de Proyectos (minería, petróleo, industrial).

What companies has David G. González B. worked for?

David G. González B. has worked for Servicios De Proyectos (Minería, Petróleo, Industrial), Bedrock-Service, Ausenco, Planta Industrial Lacec Cia Ltda (Jv Omya), and Ucem - Unión Cementera Nacional.

Who are David G. González B.'s colleagues at Servicios de Proyectos (minería, petróleo, industrial)?

David G. González B.'s colleagues at Servicios de Proyectos (minería, petróleo, industrial) include Juan Gómez Antonio, Greg Howell, Jonas N. N., Jennifer Freeman, and Terry Morrison.

How can I contact David G. González B.?

You can use AeroLeads to view verified contact signals for David G. González B. at Servicios de Proyectos (minería, petróleo, industrial), including work email, phone, and LinkedIn data when available.

What schools did David G. González B. attend?

David G. González B. holds Master In Project Management, Project Management, 92 from Universidad Particular De Especialidades 'Espíritu Santo.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.