Railway Safety Consultant
Current2017Consulting on train acceptance techniques and processes.2014 - 2018Analysis and reporting track shunting compatibility on lines where new rolling stock is put into service.2012 - 2017Specialist in the contribution of compiling compatibility demands for rolling stock, related to track side signalling systems.2013Developing, installing, maintaining and analysing of train detection systems in orde to analyse the track shunting capabilities on Light Rail tracks during the Autumn. A monitoring system was installed on 24 Track circuits (on 4 locations). The train detection systems are 75Hz track circuits (single and double rail)