Daniel Bianchi Email & Phone Number
@verallia.com
LinkedIn matched
Who is Daniel Bianchi? Overview
A concise factual answer block for searchers comparing this professional profile.
Daniel Bianchi is listed as Operational Excellence Coordinator at Verallia Brasil, a with 2028 employees, based in Mogi Guaçu, São Paulo, Brazil. AeroLeads shows a work email signal at verallia.com and a matched LinkedIn profile for Daniel Bianchi.
Daniel Bianchi previously worked as Operational excellence Coordinator at Verallia and SR Process Improvement Engineer at Toyota Do Brasil. Daniel Bianchi holds Bachelor Of Engineering - Be, Mechanical Engineering from Universidade Estadual Paulista Júlio De Mesquita Filho.
Email format at Verallia Brasil
This section adds company-level context without repeating Daniel Bianchi's masked contact details.
AeroLeads found 1 current-domain work email signal for Daniel Bianchi. Compare company email patterns before reaching out.
About Daniel Bianchi
Experienced in project management for heavy equipment planning, installation and commissioning, stamping dies manufacturing and implementation plan, plus budget definition, control and budget reduction activities. Experienced with Toyota Production System and Lean Six Sigma. Focused in activities with safety, within schedule plan and minimum investment. Native Portuguese speaker, fluent in English and Spanish.
Daniel Bianchi's current company
Company context helps verify the profile and gives searchers a useful next step.
Daniel Bianchi work experience
A career timeline built from the work history available for this profile.
Operational Excellence Coordinator
Current- Responsible for Operational Excellence Program (VIM - Verallia Industrial Management) at Jacutinga Plant.Responsible for Cost reduction and Capacity Increase portfolio management - Approximately 2,5% of cash cost reduction per year and 1% of glass yield increase per year.Coaching on project management for new leaders and projects including Energy consumption reduction (Both melting and non-melting energy), Raw materials optimization, Improvement of equipment efficiency (Compressor and Ventilators), Optimization on direct and indirect materials consumption (Packing, PPE, Lubricants, glass treatment etc.), improvement on waste destination and labor projects (WPO, Overtime reduction etc.). Using cost deployment tools, Lean manufacturing, TPS and Six Sigma tools to find losses to increase cost reduction plan.Responsible on implementation of 5S program/committee for sixteen areas including training, formation, and coaching of 5S leaders and auditors.Coaching on problem solving (RCA) of teams regarding issues related to Safety, Environment, Maintenance, Logistics, Production and Administrative.Responsible for monthly evaluation of plant results and report directly to Plant Manager.
Sr Process Improvement Engineer
OMDD - Operations Management Development DivisionSupport to process improvement, cost reduction, stock volume reduction, man power balance and reduction, office process improvement at the following areas:- Tier 1 - Plastic parts supplier (Injection, Painting, Assembly and Logistics)- Internal logistics process (Welding and Assembly shop)- Installation activities (Project engineering)- Project engineering work balance and efficiency improvement
Sr Production Engineer
PJT 740B (NEW SUV 2021) @Kanjiko do Brasil - Salto (Tier 1)PJT LEADER - New Stamping Dies introduction at Tier 1 Supplier - only local dies (10 sets)- Responsible for Technical specification, Budget planning and control (~BRL 27 MM), Team members allocation, quality assurance, die maker follow up, die maker try-out, home try-out, next process evaluation (SOR welding Shop; SOR Assemlby Shop and QC)PJT 360B (New Corolla 2020) @ SBCPJT LEADER - New stamping dies introduction, for body and suspension parts (total 50 sets)Responsible for die specification (in case of local manufacturing dies - 10 sets), BID preparation and follow up, manufacturing follow up and maker try-outs. In charge of project management, schedule follow up, Team member allocation, production preparation, quality assurance and next process follow up. In charge of technical modifications in order to achieve best result to next process (SBC welding shop - Suspension parts / IDT welding Shop - body parts / IDT assembly shop). Responsible for budget planning and control (~BRL 160,00MM)PJT LEADER: 4th Servo Press Installation 2016-17 @SOR Press Shop - Responsible for complete plan of temporary shutdown in order to install new Servo Press on current working Press Line @ SOR.Responsible for die transference plan and Team members transference plan between SOR and IDT plant; Buffer production/consumption at SOR and IDT plant; Responsible for Die transference between IDT plant and Suppliers, Responsible for logistic plan between plants/suppliersResponsible for installation specification, equipment definition and installation supplier definition.Responsible for full PJT management, schedule follow up, budget planning and control (~ BRL 25 MM), Installation follow up, comissioning and die transference back to original plants- Responsible for Maker try-out of imported dies - Panel Side Member RH/LH - Sedan Maker (ST - Japan); Panel Fender RH/LH (TMMIN - Indonesia)
Pl Production Engineer
Project 230B (New Yaris 2017)PROJECT LEADER: 4th Servo Press Installation @SOR Press Shop - Responsible for complete plan of temporary shutdown in order to install new Servo Press on current working Press Line @ SOR.Responsible for die transference plan and Team members transference plan between SOR and IDT plant; Buffer production/consumption at SOR and IDT plant; Responsible for Die transference between IDT plant and Suppliers, Responsible for logistic plan between plants/suppliersResponsible for installation specification, equipment definition and installation supplier definition.Responsible for full Project management, schedule follow up, budget follow up, Installation follow up, comissioning and die transference back to original plantsProject: 640A (New Hilux 2016) Inter Company Tranferee (ICT) - Toyota Argentina - Responsible for New Press Shop (2013 - 2014)Project: NR 12 Compliance (2013-2014) - Press Machines - @IDT plant; @ SOR Plant; @ SBC Plant- Project leader - Press Machine Safety devices evaluation (NR12) - Evaluation of current condition regarding safety condition on equipments, specification of necessary correction, schedule management with Legal Affairs and Production departments
Jr Production Engineer
Project: 860L (Etios Introduction) New Stamping Plant - @Toyota Sorocaba (2012-2013)- Responsible for Press Installation Management - Sorocaba Plant New Servo Press Line and equipments- Responsible for technical specification, construction follow-up and commissioning of peripherical equipments such as Scrap conveyor, Overhead crane, Die transference trailerProject: 108k @ Toyota Sorocaba (2013)PROJECT LEADER: Die Spot Installation- Responsible for technical specification, construction follow-up and commissioning of Die maintenance Press;- Responsible for Press Installation - Includes Equipment approval at Supplier (AMINO Japan), Importation, Logistics, Installation and Commissioning;Project 369A (New Corolla 2014) @ Indaiatuba Plant- Responsible for Injection Machine Installation Management - Heavy installation and Electrical installation- Responsible for Die Importation, including Tax exemption process
Project Engineer - Inter Company Transferee (Ict)
Project: 640A New Hilux 2016: New Servo Press Line Introduction and current Line Modification- Management of New Servo Press line equipment manufacturing, importation (Including management of tax exemption process w/ Legal Affairs and Argentinian Customs), Installation and Commissioning- Responsible of Equipment modification and compliance to local rules- Responsible for Dies implementation at New Servo Press Line (Hood inner and Outer, rear doors and tailgate inner and outer panels)- Responsible for Press Shop project budget control, and cost reduction activities
Trainee
Trainee Lean Six Sigma - Continuous Improvement Department/Industrial Engineering Department- Industrial Engineering Trainee: Responsible on the interface with production department regarding maintenance planning; Development of lean six sigma projects for milling machines maintenance and milling machines retrofit.- Continuous improment trainee: Responsible for green belt project on Machining process, mentoring of yellow belt and green belt projects (machining, HR, Payroll, Acccounting and control, Internal Security); Participant on other matters of Continuous Improvement Dept, as Kaizen events, LSS projects presentations.
Intern
Internship:- Responsible for lifting devices project update and corrections. Responsible for new lifting devices projects for new products/new lines- Responsible for new stock implementation, using lean manufacturing concepts- Responsible for layout definition and studies (Machining area)- Responsible for machinig process description creation, maintenance and updates- Responsible for time analysis for machining process and cost reduction activities- Organization of Safety week (SIPAT) for 450 employees
Colleagues at Verallia Brasil
Other employees you can reach at verallia.com. View company contacts for 2028 employees →
Jessica Streete
Colleague at Verallia BrasilMadrid, Community Of Madrid, Spain
View →
AL
Alessia Lavorini
Colleague at Verallia BrasilPescia, Tuscany, Italy
View →
FT
Fernando Tome Alonso
Colleague at Verallia BrasilGreater León, Spain Area, Spain
View →
AM
Alexandre Mumberger
Colleague at Verallia BrasilCampo Bom, Rio Grande Do Sul, Brazil
View →
SM
Salif Mané
Colleague at Verallia BrasilCourbevoie, Île-De-France, France
View →
DG
Delton Galhardo
Colleague at Verallia BrasilCampo Bom, Rio Grande Do Sul, Brazil
View →
GG
Giuseppe Gargiulo
Colleague at Verallia BrasilApulia, Italy
View →
JM
Juan Muriano
Colleague at Verallia BrasilSpain
View →
GR
Giacomo Ramorino
Colleague at Verallia BrasilGenoa, Liguria, Italy
View →
LG
Loic Gekiere
Colleague at Verallia BrasilCognac, Nouvelle-Aquitaine, France
View →
Daniel Bianchi education
Bachelor Of Engineering - Be, Mechanical Engineering
Bachelor'S Degree, Industrial Engineering
Frequently asked questions about Daniel Bianchi
Quick answers generated from the profile data available on this page.
What company does Daniel Bianchi work for?
Daniel Bianchi works for Verallia Brasil.
What is Daniel Bianchi's role at Verallia Brasil?
Daniel Bianchi is listed as Operational Excellence Coordinator at Verallia Brasil.
What is Daniel Bianchi's email address?
AeroLeads has found 1 work email signal at @verallia.com for Daniel Bianchi at Verallia Brasil.
Where is Daniel Bianchi based?
Daniel Bianchi is based in Mogi Guaçu, São Paulo, Brazil while working with Verallia Brasil.
What companies has Daniel Bianchi worked for?
Daniel Bianchi has worked for Verallia Brasil, Verallia, Toyota Do Brasil, Toyota Argentina, and Indústrias Romi Sa.
Who are Daniel Bianchi's colleagues at Verallia Brasil?
Daniel Bianchi's colleagues at Verallia Brasil include Jessica Streete, Alessia Lavorini, Fernando Tome Alonso, Alexandre Mumberger, and Salif Mané.
How can I contact Daniel Bianchi?
You can use AeroLeads to view verified contact signals for Daniel Bianchi at Verallia Brasil, including work email, phone, and LinkedIn data when available.
What schools did Daniel Bianchi attend?
Daniel Bianchi holds Bachelor Of Engineering - Be, Mechanical Engineering from Universidade Estadual Paulista Júlio De Mesquita Filho.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trialCheck these profiles if this is not the Daniel Bianchi you were looking for.
View similar profiles