Senior Track Geometric Engineer
CurrentSite Engineer on OMC 4 Project. Role includes design and construction interface.Design EoR for LIM Rail on OMC 4 Project. Role includes drawing design and production for each submission phase of the project to IFT. Design Report for LIM Rail, including structural calculations as well as preparation of the Constructability Report for the project.Utilities coordination for Pattullo Bridge Replacement Project. Duties include identifying and coding all existing utilities and create an existing utilities matrix. Planned relocation of Fortis BC Gas lines within the project area and produced sketches for these relocations and other utility conflict areas as required. Revised utility and Basemap CAD external reference files with survey information received.