Chairman & Managing Director
CurrentWe are now venturing into manufacturing with an initial line up of 300 MWh battery manufacturing plant by the end of this year FY 2023-24 of which the 30 MWh capacity shall be operational from October 2023. The scaleup of 300MWh to 5GWh is scheduled in FY 2024-25 and in the same year setting up of lab scale cell manufacturing and commissioning of recycling unit as per 300 MWh capacity shall take place. Broad level classification of the Octarange IP is as followsCell Chemistry: CAM Material formulations, process based novelties for CAM manufacturing, process based novelties for CAM recycling, process novelties in manufacturing of ED copper foils current collectors (*CAM-cathode active material)(**ED- Electrolytic deposition)Battery Manufacturing: Novelties in the fireproofing batteries, liquid based thermal management systems for all season operations, battery state and parameter estimation algorithms, modular mechanical design structure for rapid manufacturing and ultrafast charging of battery packs Octarange have been developing battery technologies for leading EV OEMs (in Electric 2 wheeler, 3 wheeler, truck, tractors), EV startups and stationary storage providers. Currently our technology stack is undergoing pre compliance testing/homologations with our third party labs and ARAI.The offerings from Octarange is as followsCustomised Battery Technology Development+ManufacturingCustomised Thermal Management System Development+ManufacturingBattery Research and Development ActivitiesElectric Vehicle Simulators and SAAS based simulation platformsBattery Pack Simulation, Testing and Validation Services as per AIS Standards.