Construction Inspector
CurrentWashington Metropolitan Area Transit Authority (WMATA) – Greenbelt Test Track Project, Greenbelt, MD: $65M design-build project which includes the construction of new facilities which enable WMATA to accomplish acceptance testing and commissioning of the new 7000-series rail cars. The construction consists of the installation of approximately 10,000 linear feet of test track within the existing WMATA Green Line right-of-way (ROW) between the Greenbelt and College Park Metro Stations; a 2-story, 65,000 square foot commissioning facility and a 3-story parking facility located at the existing Greenbelt Rail Yard. Responsibilities include daily reporting of work activity, observation and inspection of all construction activities including earthwork, structural steel, cast-in-place concrete, pre-cast concrete, automatic train control, traction power, track work, systems integration, and site work.