Field Material Manager/Coordinator
Marathon Refinery Canton Ohio
MSAT Project (Mobil Source Air Toxics) Unit During the Pre Project Phase I procured materials from vendors using the company's purchasing system (PacketPro). Received the material, labeled it for identification and sorted it by project schedule. Developed and inventory spreadsheet for the received in and sign out process. Attended weekly project meetings with the project team lead by Project Engineer and reported all activities of the materials as far as receiving schedule and any possible discrepancies that could cause any issues with the scheduled completion of the project.During Project Phase I issued the materials to the sub-contractor (10 in all) using a sign out tracking method to track all materials used by each sub-contractor and when it was used. I would allocate the materials on the company's purchasing system (PacketPro) so the financial process was completed for the materials. Materials included over 900 engineered pipe spools as small as 3/4" to 30", 20 truck loads of engineered structural steel, 4-40,000 lbs. cooling fin fan units, over 1200 various valves ranging from 1/2" to 30" in size and for several different applications from water to acid, pipe insulation, gaskets and many more.