Eduard Hartog
AeroLeads people directory · profile

Eduard Hartog Email & Phone Number

Hubertus Tunnel at ICT Improve
Location: Capelle Aan Den Ijssel, South Holland, Netherlands 27 work roles 2 schools
1 work email found @improveqs.nl LinkedIn matched
✓ Verified August 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email e****@improveqs.nl
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Hubertus Tunnel
Location
Capelle Aan Den Ijssel, South Holland, Netherlands

Who is Eduard Hartog? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Eduard Hartog is listed as Hubertus Tunnel at ICT Improve, based in Capelle Aan Den Ijssel, South Holland, Netherlands. AeroLeads shows a work email signal at improveqs.nl and a matched LinkedIn profile for Eduard Hartog.

Eduard Hartog previously worked as ProRail - Workgroup Software Quality Policy at Ict Improve and Rijkswaterstaat Bureau Veiligheidsbeambte at Ict Improve. Eduard Hartog holds Propedeuse, Computer Science from Technische Universiteit Delft.

Company email context

Email format at ICT Improve

This section adds company-level context without repeating Eduard Hartog's masked contact details.

{first}.{last}@improveqs.nl
86% confidence

AeroLeads found 1 current-domain work email signal for Eduard Hartog. Compare company email patterns before reaching out.

Profile bio

About Eduard Hartog

Mijn interesse ligt in het aansturen van teams en hetimplementeren en stroomlijnen van processen in organisaties.Het doel van mijn werk is om samen met anderen een goed product te maken binnen de gestelde eisen (tijd, geld, kwaliteit).

Listed skills include Testing, Test Management, Software Project Management, Scrum, and 12 others.

Current workplace

Eduard Hartog's current company

Company context helps verify the profile and gives searchers a useful next step.

ICT Improve
Ict Improve
Hubertus Tunnel
AeroLeads page
27 roles

Eduard Hartog work experience

A career timeline built from the work history available for this profile.

Hubertus Tunnel

Current

In the Hubertus Tunnel project I perform a quality scan every 2 months using the Quality Scan (Q-Scan). Based on the results, the team determines (during a joint workshop led by me) which areas for improvement should be addressed in the project.With each subsequent scan, the effect of the improvement points will be examined based on the linked metric and an additional scan.

May 2024 - Present

Prorail - Workgroup Software Quality Policy

Current

Activities:To bring the quality level to a more equal and higher level, a working group has been set up within ProRail. This working group consists of people from ProRail together with the IT partners.First, the working group drew up the Software Quality Policy. This policy has been promoted through a roadshow and training (based on TMap). Before the training, I held a workshop on finding and selecting areas for improvementIn addition, I carried out 0 measurements at 5 projects… Show more Activities:To bring the quality level to a more equal and higher level, a working group has been set up within ProRail. This working group consists of people from ProRail together with the IT partners.First, the working group drew up the Software Quality Policy. This policy has been promoted through a roadshow and training (based on TMap). Before the training, I held a workshop on finding and selecting areas for improvementIn addition, I carried out 0 measurements at 5 projects within ProRail with the Quality Scan (Q-Scan). Q-Scan is the tool I developed to measure quality in a broad sense within a project. It is based on 3 levels: organization, process and product. Within each level there are 2 or more aspects, such as QA for process, code quality for product or collaboration for organization. During a workshop - in which the entire team participates - I discuss the results of the scan and, together with the team, identify 2 or 3 points for improvement that will be addressed.Result and performance:- Drafting Software Quality Policy- Organizing and supervising the training- Carrying out 0-measurement incl. workshop on 5 projects Show less

Dec 2022 - Present

Rijkswaterstaat Bureau Veiligheidsbeambte

Current

Commissioned by Bureau Safety Officer of Rijkswaterstaat, I have carried out several assignments to provide advice on the topics Validation & Verification or Transition Management within the tunnel projects in the field of Tunnel Technical Installations (TTI). The Safety Officer (VB) must provide this legal advice at the request of the tunnel manager.The work performed depends on the phase the project is in. The investigations always focus on the following aspects:-determining whether… Show more Commissioned by Bureau Safety Officer of Rijkswaterstaat, I have carried out several assignments to provide advice on the topics Validation & Verification or Transition Management within the tunnel projects in the field of Tunnel Technical Installations (TTI). The Safety Officer (VB) must provide this legal advice at the request of the tunnel manager.The work performed depends on the phase the project is in. The investigations always focus on the following aspects:-determining whether the work is performed according to the plans and guidelines (e.g. J-STD 016, ISO 61508 and project-specific plans);- determining whether the test process has been set up correctly, such as determining the design of the tests per test level;- Obtain an impression of the delivered product quality.The assignments are carried out at 3 moments in the project, namely for the environmental permit, opening permit or in between (interim advice). In all cases I conduct a file investigation on the delivered file, in some cases supplemented with interviews or test witness.In the case of the advice for the environmental permit, the file consists of the documents from the VO (SDR) and part of the DO (PDR). I often also conducted interviews with project staff here to verify or clarify matters.In the interim advice, the file is usually supplemented with documents from the UO. I then draw on this for the file research, possibly supplemented with a few interviews.In the case of advice for the environmental permit, I mainly look at the established test plans, but I am mainly present as an observer during the tests to be performed (test witness).Executed projects:Heinenoord renovationProject Groene Boog – RottemerentunnelProject BlankenburgverbindingGaasperdammertunnelKoning Willem-AlexandertunnelVelsertunnelA4 Delft Schiedam (Ketheltunnel) Show less

Mar 2012 - Present

Ministry Of Finance - Dutch Treasury Agency

At the Dutch Treasury Agency, I introduced and implemented the Requirements Engineering process based on collecting the requirements for the Treasury Management System (TMS). With a team of Business Analysts, we had workshops with every department within the Agency to collect the requirements in the form of User Stories. These User Stories are used in the tender to be formed. Non-functional requirements have also been retrieved. In subsequent phases, the User Stories are detailed through Use… Show more At the Dutch Treasury Agency, I introduced and implemented the Requirements Engineering process based on collecting the requirements for the Treasury Management System (TMS). With a team of Business Analysts, we had workshops with every department within the Agency to collect the requirements in the form of User Stories. These User Stories are used in the tender to be formed. Non-functional requirements have also been retrieved. In subsequent phases, the User Stories are detailed through Use Cases.The Cradle tool has been set up to administer the requirements, after which the requirements have been entered.Results: Requirements Engineering secured and implemented within the AgencyRequirements for the TMS collected and administered Show less

May 2023 - May 2024

Bol.Com

BFC2 is being built at bol.com, which will be the largest distribution center currently in the Benelux. Ultimately, approximately 1.2 million items can be stored in the (fully automatic) warehouse (shuttle). Installations such as conveyors, workstations and packaging machines are supplied by various suppliers (from different European countries). In this project, I coordinated the tests with a colleague for installing the MHE installations. For this purpose, both functional tests (iSAT) and… Show more BFC2 is being built at bol.com, which will be the largest distribution center currently in the Benelux. Ultimately, approximately 1.2 million items can be stored in the (fully automatic) warehouse (shuttle). Installations such as conveyors, workstations and packaging machines are supplied by various suppliers (from different European countries). In this project, I coordinated the tests with a colleague for installing the MHE installations. For this purpose, both functional tests (iSAT) and performance tests (observing nodal and module tests, supervising PAT, i.e. testing performance KPIs) were carried out.In the BFC3 project I retrieved and structured the top requirements. Based on these top requirements, the detailed requirements have been drawn up on which the Employer's Requirements are based (ER according to FIDIC). I also set up the Jira system for tracking and tracing the requirements.Results: Opening of the BFC2 Distribution CenterDrawing up and structuring requirements BFC3 Show less

Jul 2020 - Apr 2023

Van Oord

Activities: The VOCAM system carries out part of the control of a ship, such as the dredging or cable pulling installation. This system has been built over several years and is now encountering expansion problems. That is why the Scrum working method and the Azure DevOps tool are being introduced in the VOCAM project, starting with the newly built Event Monitoring Service. In this project I created a plan for describing and managing the requirements, where I also coached the intended Product… Show more Activities: The VOCAM system carries out part of the control of a ship, such as the dredging or cable pulling installation. This system has been built over several years and is now encountering expansion problems. That is why the Scrum working method and the Azure DevOps tool are being introduced in the VOCAM project, starting with the newly built Event Monitoring Service. In this project I created a plan for describing and managing the requirements, where I also coached the intended Product Owner. After this, I created a vision for the testing process within the project based on the required test levels and available test environments. This part was subsequently taken over by a colleague, after which I focused on the certification (design appraisal) of the VOCAM system based on the requirements of Bureau Veritas.Result and performance: Setting up Azure DevOps in terms of requirements management and test management. The process is also described for the team members Show less

Dec 2018 - Jun 2021

Audit Ict Netherlands

Activities: In a project accepted by ICT for a large dairy manufacturer, there are management and quality problems. I conducted research on this project focused on 3 pillars: technology, organization and processes. For this purpose I conducted interviews with those involved in ICT and the customer. In addition, I conducted research on the file consisting of documentation, incident administration and the programming code.Result and performance: Based on the research, I wrote a report… Show more Activities: In a project accepted by ICT for a large dairy manufacturer, there are management and quality problems. I conducted research on this project focused on 3 pillars: technology, organization and processes. For this purpose I conducted interviews with those involved in ICT and the customer. In addition, I conducted research on the file consisting of documentation, incident administration and the programming code.Result and performance: Based on the research, I wrote a report with recommendations. This report was presented to the plant management and higher project management of ICT Show less

Dec 2020 - Mar 2021

Burgerraadslid Groenlinks Capelle A/D Ijssel

Current

Gemeente Capelle Aan Den Ijssel, South Holland, Netherlands

Mar 2022 - Present

Tennet - Scada Dolwin 3

In the Dolwin 3 project, the offshore wind farm is connected to the land station for monitoring and control. This project runs from Hannover, while the project management is in Arnhem. The testing and coordination of the signal lists was difficult because it was the supplier's first offshore project. Moreover, those involved came from different countries (particularly Germany, France, the Netherlands), which also caused communication problems. The coordination was on two levels. Firstly, the… Show more In the Dolwin 3 project, the offshore wind farm is connected to the land station for monitoring and control. This project runs from Hannover, while the project management is in Arnhem. The testing and coordination of the signal lists was difficult because it was the supplier's first offshore project. Moreover, those involved came from different countries (particularly Germany, France, the Netherlands), which also caused communication problems. The coordination was on two levels. Firstly, the coordination of the signal lists between TenneT and GE and secondly, the coordination of the offshore and onshore Scada tests.The result was that the signal lists were synchronized and changed in a structured manner. These signal lists were used as a basis for the tests Show less

Aug 2019 - Mar 2020

Ict Netherlands - Tender Rws

Activities: The Testcentre (Rijkswaterstaat CIVVV) brought out a tender to fulfill the testing activities. My role in the tender for RWS CIVVV (Testcentre)was to support the tender team (in corporation with Sogeti) bry bringing in knowledge about Rijkswaterstaat and CIVVV and to review documents.Result: The tender was delivered in time and of good quality

Oct 2019 - Dec 2019

Den Haag - Training Koningstunnel

Activities: We have been asked to set up an OTO-training (OTO = education, training, practice) for the operation and control for the Koningstunnel (The Hague). In this case, 24 operators have been trained to use the controls of the Koningstunnel. This involved one day of transferring theory and one and a half day of letting the operators practice using assignments and scenarios. I was the project leader of the team of 4 people.The training is ultimately given 7 times by 3 different… Show more Activities: We have been asked to set up an OTO-training (OTO = education, training, practice) for the operation and control for the Koningstunnel (The Hague). In this case, 24 operators have been trained to use the controls of the Koningstunnel. This involved one day of transferring theory and one and a half day of letting the operators practice using assignments and scenarios. I was the project leader of the team of 4 people.The training is ultimately given 7 times by 3 different trainers. In addition, a test was administered 7 times in which we performed the examiner and observer role. My role was to direct and coordinate the project. I also gave the training 4 times and was an examiner for the tests.Result: Trained 24 operators. The lion's share of operators successfully completed the theory and practical test Show less

Feb 2019 - Jul 2019

Rotterdam - Hoekse Lijn

Activities: Within the Hoekse Lijn project, a metro line is being built by the Municipality of Rotterdam in collaboration with RET and ProRail for the Schiedam Center - Hoek van Holland route (approximately 40 km). In this project I am responsible for mapping and monitoring the status and progress of testing, testing and inspection within the contract of the municipality of Rotterdam. The contract from the municipality of Rotterdam includes the station installations as well as the civil and… Show more Activities: Within the Hoekse Lijn project, a metro line is being built by the Municipality of Rotterdam in collaboration with RET and ProRail for the Schiedam Center - Hoek van Holland route (approximately 40 km). In this project I am responsible for mapping and monitoring the status and progress of testing, testing and inspection within the contract of the municipality of Rotterdam. The contract from the municipality of Rotterdam includes the station installations as well as the civil and mechanical work on the stations, bridges, track and overhead lines.Initially, I made agreements about the process and method of providing information between the various project components, both within the contract of the municipality of Rotterdam and outside this contract, such as the Project Bureau Hoekse Lijn and the RET. After streamlining these information flows, I was able to immediately inform managers about the status and progress of testing and the quality of the parts.The coordination mainly consists of collecting information and data from those involved within and outside the contract of the Municipality of Rotterdam.Result and performance: On a weekly basis I provided an overview of the (test) status and planning of the components of the project. I informed the managers about possible bottlenecks and blockages that I observed within the project in the field of quality and testing within the contract. Show less

Mar 2017 - Sep 2018

Rijkswaterstaat - Wantijbrug

Activities: In the Wantij Bridge project, a generic bridge control system is being developed so that it can be applied to other Rijkswaterstaat's bridges. In this project I provided advice in the field of Verification & Validation. I was particularly involved during the PDR and SDR. I also advised on quality processes within the project.Result: Reports with findings and possible improvements in the field of requirements management and test management. In addition, conducted reviews of… Show more Activities: In the Wantij Bridge project, a generic bridge control system is being developed so that it can be applied to other Rijkswaterstaat's bridges. In this project I provided advice in the field of Verification & Validation. I was particularly involved during the PDR and SDR. I also advised on quality processes within the project.Result: Reports with findings and possible improvements in the field of requirements management and test management. In addition, conducted reviews of testing and development related documents Show less

Nov 2017 - May 2018

Expert Training Development

Activities: ISTQB has released 2 syllabi at Expert level: Improving the Testing Process and Test Management. As a training developer, I set up and developed both training courses. I have written a reader as accompanying material for the Test Management training.Result: In 2013, both Assessor and Test Manager modules of Expert level ITTP were accredited. In 2017, the 3 modules (Strategic Management, Operational Management and Test Team Management) of Expert level TM were… Show more Activities: ISTQB has released 2 syllabi at Expert level: Improving the Testing Process and Test Management. As a training developer, I set up and developed both training courses. I have written a reader as accompanying material for the Test Management training.Result: In 2013, both Assessor and Test Manager modules of Expert level ITTP were accredited. In 2017, the 3 modules (Strategic Management, Operational Management and Test Team Management) of Expert level TM were accredited.In July 2013, a Testnet Summer School workshop was held for approximately 20 attendees on the ISTQB Expert ITTP training.In July 2016, a Testnet Summer School workshop was held on the ISTQB Expert Test Management training Show less

Sep 2012 - Jun 2017

Rijkswaterstaat - Vc Nwn

Activities: Drawing up a process for transition in the VC NWN Traffic Center.Result: A process diagram including description has been drawn up for the transition process within the Traffic Center. This is based on the National Tunnel Standard (LTS-WWAT). In addition, it has been elaborated how assessment and testing activities should be carried out in the event of changes in the systems that are managed and controlled

Jan 2015 - Jun 2015

A-Lanes - Botlekbrug

Activities: Within the New Botlek Bridge project, control and monitoring software is created with S7 PLC and Scada technology. The software controls the bridge technical installations such as traffic lights and passage signals.Within the project I was responsible for test management. To this end, I drew up a Master Test Plan in which I described the general verification and validation strategy for the project. Every 4-week sprint a release is FAT together with the client. During the… Show more Activities: Within the New Botlek Bridge project, control and monitoring software is created with S7 PLC and Scada technology. The software controls the bridge technical installations such as traffic lights and passage signals.Within the project I was responsible for test management. To this end, I drew up a Master Test Plan in which I described the general verification and validation strategy for the project. Every 4-week sprint a release is FAT together with the client. During the sprint, the backlog items are tested separately during internal test runs. All results of the test runs are recorded in a test report per sprint.During the internal test runs and also the FAT, formal test scripts are used that are based on test design techniques. The client attached extra value to this, so that they can gain and maintain better insight into the coverage of the tests. In addition, it must also be possible to trace the requirements back to the test cases and findings by maintaining a traceability matrix.The tests are carried out by the project's test team. The tests are carried out in a test setup with duplicate regular and safety PLCs that are linked to a Win CC OA server. With reference to a Simbabox and WinMod, the PLC IO of the bridge technical installation is simulated.Site Acceptance Tests were carried out on the bridge by the test team based on: the SAT test plan I prepared.Result: For each sprint I wrote a sprint test plan to describe the testing approach. Together with a colleague, I then drew up the test scripts. I drew up a test report for each test run, so that the state of affairs was clear at all times. With the last release, an extensive FAT was performed in which all functionality was checked again.The next step is to carry out tests on the bridge in which the software is gradually linked to the sub-installations. Show less

Mar 2014 - Jun 2015

Tunnel Combination

Activities: In a tender process for a tunnel (based on LTS 1.2), I wrote the V&V plan in which the test strategy and the PRA are described. The Master test plan is an elaboration of the described test strategy. The author of the Master test plan was coached by me so that the 2 plans would fit together well.Result: The document was used in discussions with Rijkswaterstaat about the intended working method and approach within the project

Oct 2013 - Jan 2014

Rijkswaterstaat - Testcentre

Activities: DVM systems are validated and verified within the Rijkswaterstaat Test Center. DVM stands for Dynamic Traffic Management, such as matrix signs, rush hour lanes and route information panels. As quality manager, I redesigned the manual in terms of structure and content regarding testing, management and QA procedures. In addition, I carried out quality checks and reported to the RWS contract owner. An important point of attention was coordinating the activities of the plots and… Show more Activities: DVM systems are validated and verified within the Rijkswaterstaat Test Center. DVM stands for Dynamic Traffic Management, such as matrix signs, rush hour lanes and route information panels. As quality manager, I redesigned the manual in terms of structure and content regarding testing, management and QA procedures. In addition, I carried out quality checks and reported to the RWS contract owner. An important point of attention was coordinating the activities of the plots and guiding/coaching the employees to increase quality and assurance.In addition, as Test Manager I managed the various plots; together approximately 20 people. I have set up a Test Center-wide planning that is used by all plots for the approximately 50 projects carried out simultaneously. In some cases I determined the test strategy together with the tester and adjusted the test plan.Result:-Set up a test policy for the Test Center that describes the principles for the test projects, including general working methods and entry and exit criteria.-Newly developed manual that clearly describes how to work per plot, including: general procedures, templates and checklists.-Setting up Test Center-wide planning.-Services catalog for Test Center customers.-Monitoring and, if necessary, correcting testers.-Product assessments i.e. reviews and witnessing.-QA reports or dashboards for the RWS contract owner.-QA procedures for the work of QA Show less

Dec 2007 - Aug 2012

Prorail - Ebs+

Activities: ProRail is responsible for the management and maintenance of the rail network in the Netherlands. Within this, the Train Protection Systems department is responsible for the safe running of trains. This concerns safety and availability in terms of functionality, robustness and regulations.The EBS+ project aims to develop a generic security system in collaboration with Siemens AG. The EBS+ project ensures generic release and a pilot. After this, old relay systems will be… Show more Activities: ProRail is responsible for the management and maintenance of the rail network in the Netherlands. Within this, the Train Protection Systems department is responsible for the safe running of trains. This concerns safety and availability in terms of functionality, robustness and regulations.The EBS+ project aims to develop a generic security system in collaboration with Siemens AG. The EBS+ project ensures generic release and a pilot. After this, old relay systems will be replaced for 10 years as part of the Mistral program.The development of the system is carried out by Siemens AG. The testing, approval and release of the system is carried out at ProRail. Approximately 45 people work on the entire project.Within the project I am responsible for setting up and implementing processes regarding Risk Management, version and release management, archiving development documents and regulations/regulations and integral planning.Result and performance: Documentation set approved by the safety coordinator for the release of the EBS+ system Show less

Apr 2006 - Dec 2007

Siemens Mobile

Activities: As the Integration Manager for the mobile phone software, I coordinated the integration of the software during the development and maintenance phase (i.e. after Delivery Start). During the development phase, the 15 local Continuous databases were integrated into 1 integration database. To achieve the Delivery Start, the local databases were merged into 1 integration database on which all developers continued to work. After this, commercial software releases were made every week for… Show more Activities: As the Integration Manager for the mobile phone software, I coordinated the integration of the software during the development and maintenance phase (i.e. after Delivery Start). During the development phase, the 15 local Continuous databases were integrated into 1 integration database. To achieve the Delivery Start, the local databases were merged into 1 integration database on which all developers continued to work. After this, commercial software releases were made every week for operators around the world.Each release was first tested by the Smoke testing team in India who tested key functionality. If there were no major problems in the release, the version was forwarded to the testing department Show less

Sep 2004 - Apr 2006

Large Chip Manufacturer - Edge Testcases

Activities: As project leader, I managed a team of 15 developers to build EDGE test cases. The test cases can be used to test mobile phones with an EDGE protocol stack using specialized Rohde & Schwarz test equipment

Feb 2002 - Oct 2004

Ict Embedded - Osgi

Activities: As project leader, I managed a team of 3 experienced developers to conduct research into the application of OSGi in the automotive industry. In addition, I maintained contacts with senior and account management, planning and tracking & tracing. Furthermore, I conducted market research via the Internet into the current and future use of OSGi in the automotive industry. This has resulted in a business case in which the technical and commercial possibilities are discussed and… Show more Activities: As project leader, I managed a team of 3 experienced developers to conduct research into the application of OSGi in the automotive industry. In addition, I maintained contacts with senior and account management, planning and tracking & tracing. Furthermore, I conducted market research via the Internet into the current and future use of OSGi in the automotive industry. This has resulted in a business case in which the technical and commercial possibilities are discussed and weighed.Within another project I managed a team of 3 experienced developers. I maintained contacts with senior and account management, took care of planning and tracking & tracing. I also drew up a business case in which the commercial possibilities for ICT were detailed. The project has produced a showcase with which multimedia services via Digital TV (built into the car) are shown at the IFA 2003 Show less

Feb 2002 - Feb 2004

Scm Microsystems

Activities: I have been responsible for improving project implementation and providing certifications. For this I wrote some requirements and test documents. I have added various templates and work instructions to the quality manual.Result and performance: I have successfully certified 5 smart card readers (CE, FCC, UL, EMV, WHQL, USB)

Feb 2001 - Feb 2002

Kpn Telecom

As project manager I was responsible for the specification, construction and implementation of the Customer Control Internet service within the KPN organization. The construction of the application has been outsourced to another department. The rollout of the service was done by a team of 4 people under my direct supervision. Furthermore, I have initiated a security audit, with the result that several security measures have been taken.As the team leader of the development team (later… Show more As project manager I was responsible for the specification, construction and implementation of the Customer Control Internet service within the KPN organization. The construction of the application has been outsourced to another department. The rollout of the service was done by a team of 4 people under my direct supervision. Furthermore, I have initiated a security audit, with the result that several security measures have been taken.As the team leader of the development team (later project leader of the entire team), we developed a charging and payment application for use with the Chipper. The team consisted of approximately 12 developers and 4 testers.In the project I was responsible for managing the team and planning. In the project I applied effective leadership techniques, which resulted in a self-managing team. Furthermore, I applied structured testing using TMAP.Results:- Rollout of Customer Control Internet- Pilot of charging and payment application with telephone for Chipper Show less

Apr 1998 - May 2001

Senior Designer

And Identification

Rotterdam Area, Netherlands

Development and maintenance of EWD: Electronic Weekdocument for Asylum seekers.

Jan 1996 - Sep 1997

Senior Designer

Topsystems (Montevideo, Uruguay)

Development of transfer program for banking (C++ with threading)Development of banking programming suite for Windows

Jan 1994 - Dec 1995

Software Developer

Tno

Development of expert systems (knowledge based systems)

Aug 1988 - Dec 1993
2 education records

Eduard Hartog education

FAQ

Frequently asked questions about Eduard Hartog

Quick answers generated from the profile data available on this page.

What company does Eduard Hartog work for?

Eduard Hartog works for ICT Improve.

What is Eduard Hartog's role at ICT Improve?

Eduard Hartog is listed as Hubertus Tunnel at ICT Improve.

What is Eduard Hartog's email address?

AeroLeads has found 1 work email signal at @improveqs.nl for Eduard Hartog at ICT Improve.

Where is Eduard Hartog based?

Eduard Hartog is based in Capelle Aan Den Ijssel, South Holland, Netherlands while working with ICT Improve.

What companies has Eduard Hartog worked for?

Eduard Hartog has worked for Ict Improve, Groenlinks, Ict Group, And Identification, and Topsystems (Montevideo, Uruguay).

How can I contact Eduard Hartog?

You can use AeroLeads to view verified contact signals for Eduard Hartog at ICT Improve, including work email, phone, and LinkedIn data when available.

What schools did Eduard Hartog attend?

Eduard Hartog holds Propedeuse, Computer Science from Technische Universiteit Delft.

What skills is Eduard Hartog known for?

Eduard Hartog is listed with skills including Testing, Test Management, Software Project Management, Scrum, Istqb, Requirements Analysis, Software Engineering, and Prince2.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.