Eduard Hartog

Eduard Hartog Email and Phone Number

Hubertus Tunnel @ ICT Improve
Eduard Hartog's Location
Capelle aan den IJssel, South Holland, Netherlands, Netherlands
Eduard Hartog's Contact Details

Eduard Hartog work email

Eduard Hartog personal email

About Eduard Hartog

Mijn interesse ligt in het aansturen van teams en hetimplementeren en stroomlijnen van processen in organisaties.Het doel van mijn werk is om samen met anderen een goed product te maken binnen de gestelde eisen (tijd, geld, kwaliteit).

Eduard Hartog's Current Company Details
ICT Improve

Ict Improve

View
Hubertus Tunnel
Eduard Hartog Work Experience Details
  • Ict Improve
    Hubertus Tunnel
    Ict Improve May 2024 - Present
    In the Hubertus Tunnel project I perform a quality scan every 2 months using the Quality Scan (Q-Scan). Based on the results, the team determines (during a joint workshop led by me) which areas for improvement should be addressed in the project.With each subsequent scan, the effect of the improvement points will be examined based on the linked metric and an additional scan.
  • Ict Improve
    Prorail - Workgroup Software Quality Policy
    Ict Improve Dec 2022 - Present
    Activities:To bring the quality level to a more equal and higher level, a working group has been set up within ProRail. This working group consists of people from ProRail together with the IT partners.First, the working group drew up the Software Quality Policy. This policy has been promoted through a roadshow and training (based on TMap). Before the training, I held a workshop on finding and selecting areas for improvementIn addition, I carried out 0 measurements at 5 projects… Show more Activities:To bring the quality level to a more equal and higher level, a working group has been set up within ProRail. This working group consists of people from ProRail together with the IT partners.First, the working group drew up the Software Quality Policy. This policy has been promoted through a roadshow and training (based on TMap). Before the training, I held a workshop on finding and selecting areas for improvementIn addition, I carried out 0 measurements at 5 projects within ProRail with the Quality Scan (Q-Scan). Q-Scan is the tool I developed to measure quality in a broad sense within a project. It is based on 3 levels: organization, process and product. Within each level there are 2 or more aspects, such as QA for process, code quality for product or collaboration for organization. During a workshop - in which the entire team participates - I discuss the results of the scan and, together with the team, identify 2 or 3 points for improvement that will be addressed.Result and performance:- Drafting Software Quality Policy- Organizing and supervising the training- Carrying out 0-measurement incl. workshop on 5 projects Show less
  • Ict Improve
    Rijkswaterstaat Bureau Veiligheidsbeambte
    Ict Improve Mar 2012 - Present
    Commissioned by Bureau Safety Officer of Rijkswaterstaat, I have carried out several assignments to provide advice on the topics Validation & Verification or Transition Management within the tunnel projects in the field of Tunnel Technical Installations (TTI). The Safety Officer (VB) must provide this legal advice at the request of the tunnel manager.The work performed depends on the phase the project is in. The investigations always focus on the following aspects:-determining whether… Show more Commissioned by Bureau Safety Officer of Rijkswaterstaat, I have carried out several assignments to provide advice on the topics Validation & Verification or Transition Management within the tunnel projects in the field of Tunnel Technical Installations (TTI). The Safety Officer (VB) must provide this legal advice at the request of the tunnel manager.The work performed depends on the phase the project is in. The investigations always focus on the following aspects:-determining whether the work is performed according to the plans and guidelines (e.g. J-STD 016, ISO 61508 and project-specific plans);- determining whether the test process has been set up correctly, such as determining the design of the tests per test level;- Obtain an impression of the delivered product quality.The assignments are carried out at 3 moments in the project, namely for the environmental permit, opening permit or in between (interim advice). In all cases I conduct a file investigation on the delivered file, in some cases supplemented with interviews or test witness.In the case of the advice for the environmental permit, the file consists of the documents from the VO (SDR) and part of the DO (PDR). I often also conducted interviews with project staff here to verify or clarify matters.In the interim advice, the file is usually supplemented with documents from the UO. I then draw on this for the file research, possibly supplemented with a few interviews.In the case of advice for the environmental permit, I mainly look at the established test plans, but I am mainly present as an observer during the tests to be performed (test witness).Executed projects:Heinenoord renovationProject Groene Boog – RottemerentunnelProject BlankenburgverbindingGaasperdammertunnelKoning Willem-AlexandertunnelVelsertunnelA4 Delft Schiedam (Ketheltunnel) Show less
  • Ict Improve
    Ministry Of Finance - Dutch Treasury Agency
    Ict Improve May 2023 - May 2024
    At the Dutch Treasury Agency, I introduced and implemented the Requirements Engineering process based on collecting the requirements for the Treasury Management System (TMS). With a team of Business Analysts, we had workshops with every department within the Agency to collect the requirements in the form of User Stories. These User Stories are used in the tender to be formed. Non-functional requirements have also been retrieved. In subsequent phases, the User Stories are detailed through Use… Show more At the Dutch Treasury Agency, I introduced and implemented the Requirements Engineering process based on collecting the requirements for the Treasury Management System (TMS). With a team of Business Analysts, we had workshops with every department within the Agency to collect the requirements in the form of User Stories. These User Stories are used in the tender to be formed. Non-functional requirements have also been retrieved. In subsequent phases, the User Stories are detailed through Use Cases.The Cradle tool has been set up to administer the requirements, after which the requirements have been entered.Results: Requirements Engineering secured and implemented within the AgencyRequirements for the TMS collected and administered Show less
  • Ict Improve
    Bol.Com
    Ict Improve Jul 2020 - Apr 2023
    BFC2 is being built at bol.com, which will be the largest distribution center currently in the Benelux. Ultimately, approximately 1.2 million items can be stored in the (fully automatic) warehouse (shuttle). Installations such as conveyors, workstations and packaging machines are supplied by various suppliers (from different European countries). In this project, I coordinated the tests with a colleague for installing the MHE installations. For this purpose, both functional tests (iSAT) and… Show more BFC2 is being built at bol.com, which will be the largest distribution center currently in the Benelux. Ultimately, approximately 1.2 million items can be stored in the (fully automatic) warehouse (shuttle). Installations such as conveyors, workstations and packaging machines are supplied by various suppliers (from different European countries). In this project, I coordinated the tests with a colleague for installing the MHE installations. For this purpose, both functional tests (iSAT) and performance tests (observing nodal and module tests, supervising PAT, i.e. testing performance KPIs) were carried out.In the BFC3 project I retrieved and structured the top requirements. Based on these top requirements, the detailed requirements have been drawn up on which the Employer's Requirements are based (ER according to FIDIC). I also set up the Jira system for tracking and tracing the requirements.Results: Opening of the BFC2 Distribution CenterDrawing up and structuring requirements BFC3 Show less
  • Ict Improve
    Van Oord
    Ict Improve Dec 2018 - Jun 2021
    Activities: The VOCAM system carries out part of the control of a ship, such as the dredging or cable pulling installation. This system has been built over several years and is now encountering expansion problems. That is why the Scrum working method and the Azure DevOps tool are being introduced in the VOCAM project, starting with the newly built Event Monitoring Service. In this project I created a plan for describing and managing the requirements, where I also coached the intended Product… Show more Activities: The VOCAM system carries out part of the control of a ship, such as the dredging or cable pulling installation. This system has been built over several years and is now encountering expansion problems. That is why the Scrum working method and the Azure DevOps tool are being introduced in the VOCAM project, starting with the newly built Event Monitoring Service. In this project I created a plan for describing and managing the requirements, where I also coached the intended Product Owner. After this, I created a vision for the testing process within the project based on the required test levels and available test environments. This part was subsequently taken over by a colleague, after which I focused on the certification (design appraisal) of the VOCAM system based on the requirements of Bureau Veritas.Result and performance: Setting up Azure DevOps in terms of requirements management and test management. The process is also described for the team members Show less
  • Ict Improve
    Audit Ict Netherlands
    Ict Improve Dec 2020 - Mar 2021
    Activities: In a project accepted by ICT for a large dairy manufacturer, there are management and quality problems. I conducted research on this project focused on 3 pillars: technology, organization and processes. For this purpose I conducted interviews with those involved in ICT and the customer. In addition, I conducted research on the file consisting of documentation, incident administration and the programming code.Result and performance: Based on the research, I wrote a report… Show more Activities: In a project accepted by ICT for a large dairy manufacturer, there are management and quality problems. I conducted research on this project focused on 3 pillars: technology, organization and processes. For this purpose I conducted interviews with those involved in ICT and the customer. In addition, I conducted research on the file consisting of documentation, incident administration and the programming code.Result and performance: Based on the research, I wrote a report with recommendations. This report was presented to the plant management and higher project management of ICT Show less
  • Groenlinks
    Burgerraadslid Groenlinks Capelle A/D Ijssel
    Groenlinks Mar 2022 - Present
    Gemeente Capelle Aan Den Ijssel, South Holland, Netherlands
  • Ict Improve
    Tennet - Scada Dolwin 3
    Ict Improve Aug 2019 - Mar 2020
    In the Dolwin 3 project, the offshore wind farm is connected to the land station for monitoring and control. This project runs from Hannover, while the project management is in Arnhem. The testing and coordination of the signal lists was difficult because it was the supplier's first offshore project. Moreover, those involved came from different countries (particularly Germany, France, the Netherlands), which also caused communication problems. The coordination was on two levels. Firstly, the… Show more In the Dolwin 3 project, the offshore wind farm is connected to the land station for monitoring and control. This project runs from Hannover, while the project management is in Arnhem. The testing and coordination of the signal lists was difficult because it was the supplier's first offshore project. Moreover, those involved came from different countries (particularly Germany, France, the Netherlands), which also caused communication problems. The coordination was on two levels. Firstly, the coordination of the signal lists between TenneT and GE and secondly, the coordination of the offshore and onshore Scada tests.The result was that the signal lists were synchronized and changed in a structured manner. These signal lists were used as a basis for the tests Show less
  • Ict Improve
    Ict Netherlands - Tender Rws
    Ict Improve Oct 2019 - Dec 2019
    Activities: The Testcentre (Rijkswaterstaat CIVVV) brought out a tender to fulfill the testing activities. My role in the tender for RWS CIVVV (Testcentre)was to support the tender team (in corporation with Sogeti) bry bringing in knowledge about Rijkswaterstaat and CIVVV and to review documents.Result: The tender was delivered in time and of good quality
  • Ict Improve
    Den Haag - Training Koningstunnel
    Ict Improve Feb 2019 - Jul 2019
    Activities: We have been asked to set up an OTO-training (OTO = education, training, practice) for the operation and control for the Koningstunnel (The Hague). In this case, 24 operators have been trained to use the controls of the Koningstunnel. This involved one day of transferring theory and one and a half day of letting the operators practice using assignments and scenarios. I was the project leader of the team of 4 people.The training is ultimately given 7 times by 3 different… Show more Activities: We have been asked to set up an OTO-training (OTO = education, training, practice) for the operation and control for the Koningstunnel (The Hague). In this case, 24 operators have been trained to use the controls of the Koningstunnel. This involved one day of transferring theory and one and a half day of letting the operators practice using assignments and scenarios. I was the project leader of the team of 4 people.The training is ultimately given 7 times by 3 different trainers. In addition, a test was administered 7 times in which we performed the examiner and observer role. My role was to direct and coordinate the project. I also gave the training 4 times and was an examiner for the tests.Result: Trained 24 operators. The lion's share of operators successfully completed the theory and practical test Show less
  • Ict Improve
    Rotterdam - Hoekse Lijn
    Ict Improve Mar 2017 - Sep 2018
    Activities: Within the Hoekse Lijn project, a metro line is being built by the Municipality of Rotterdam in collaboration with RET and ProRail for the Schiedam Center - Hoek van Holland route (approximately 40 km). In this project I am responsible for mapping and monitoring the status and progress of testing, testing and inspection within the contract of the municipality of Rotterdam. The contract from the municipality of Rotterdam includes the station installations as well as the civil and… Show more Activities: Within the Hoekse Lijn project, a metro line is being built by the Municipality of Rotterdam in collaboration with RET and ProRail for the Schiedam Center - Hoek van Holland route (approximately 40 km). In this project I am responsible for mapping and monitoring the status and progress of testing, testing and inspection within the contract of the municipality of Rotterdam. The contract from the municipality of Rotterdam includes the station installations as well as the civil and mechanical work on the stations, bridges, track and overhead lines.Initially, I made agreements about the process and method of providing information between the various project components, both within the contract of the municipality of Rotterdam and outside this contract, such as the Project Bureau Hoekse Lijn and the RET. After streamlining these information flows, I was able to immediately inform managers about the status and progress of testing and the quality of the parts.The coordination mainly consists of collecting information and data from those involved within and outside the contract of the Municipality of Rotterdam.Result and performance: On a weekly basis I provided an overview of the (test) status and planning of the components of the project. I informed the managers about possible bottlenecks and blockages that I observed within the project in the field of quality and testing within the contract. Show less
  • Ict Improve
    Rijkswaterstaat - Wantijbrug
    Ict Improve Nov 2017 - May 2018
    Activities: In the Wantij Bridge project, a generic bridge control system is being developed so that it can be applied to other Rijkswaterstaat's bridges. In this project I provided advice in the field of Verification & Validation. I was particularly involved during the PDR and SDR. I also advised on quality processes within the project.Result: Reports with findings and possible improvements in the field of requirements management and test management. In addition, conducted reviews of… Show more Activities: In the Wantij Bridge project, a generic bridge control system is being developed so that it can be applied to other Rijkswaterstaat's bridges. In this project I provided advice in the field of Verification & Validation. I was particularly involved during the PDR and SDR. I also advised on quality processes within the project.Result: Reports with findings and possible improvements in the field of requirements management and test management. In addition, conducted reviews of testing and development related documents Show less
  • Ict Improve
    Expert Training Development
    Ict Improve Sep 2012 - Jun 2017
    Activities: ISTQB has released 2 syllabi at Expert level: Improving the Testing Process and Test Management. As a training developer, I set up and developed both training courses. I have written a reader as accompanying material for the Test Management training.Result: In 2013, both Assessor and Test Manager modules of Expert level ITTP were accredited. In 2017, the 3 modules (Strategic Management, Operational Management and Test Team Management) of Expert level TM were… Show more Activities: ISTQB has released 2 syllabi at Expert level: Improving the Testing Process and Test Management. As a training developer, I set up and developed both training courses. I have written a reader as accompanying material for the Test Management training.Result: In 2013, both Assessor and Test Manager modules of Expert level ITTP were accredited. In 2017, the 3 modules (Strategic Management, Operational Management and Test Team Management) of Expert level TM were accredited.In July 2013, a Testnet Summer School workshop was held for approximately 20 attendees on the ISTQB Expert ITTP training.In July 2016, a Testnet Summer School workshop was held on the ISTQB Expert Test Management training Show less
  • Ict Improve
    Rijkswaterstaat - Vc Nwn
    Ict Improve Jan 2015 - Jun 2015
    Activities: Drawing up a process for transition in the VC NWN Traffic Center.Result: A process diagram including description has been drawn up for the transition process within the Traffic Center. This is based on the National Tunnel Standard (LTS-WWAT). In addition, it has been elaborated how assessment and testing activities should be carried out in the event of changes in the systems that are managed and controlled
  • Ict Improve
    A-Lanes - Botlekbrug
    Ict Improve Mar 2014 - Jun 2015
    Activities: Within the New Botlek Bridge project, control and monitoring software is created with S7 PLC and Scada technology. The software controls the bridge technical installations such as traffic lights and passage signals.Within the project I was responsible for test management. To this end, I drew up a Master Test Plan in which I described the general verification and validation strategy for the project. Every 4-week sprint a release is FAT together with the client. During the… Show more Activities: Within the New Botlek Bridge project, control and monitoring software is created with S7 PLC and Scada technology. The software controls the bridge technical installations such as traffic lights and passage signals.Within the project I was responsible for test management. To this end, I drew up a Master Test Plan in which I described the general verification and validation strategy for the project. Every 4-week sprint a release is FAT together with the client. During the sprint, the backlog items are tested separately during internal test runs. All results of the test runs are recorded in a test report per sprint.During the internal test runs and also the FAT, formal test scripts are used that are based on test design techniques. The client attached extra value to this, so that they can gain and maintain better insight into the coverage of the tests. In addition, it must also be possible to trace the requirements back to the test cases and findings by maintaining a traceability matrix.The tests are carried out by the project's test team. The tests are carried out in a test setup with duplicate regular and safety PLCs that are linked to a Win CC OA server. With reference to a Simbabox and WinMod, the PLC IO of the bridge technical installation is simulated.Site Acceptance Tests were carried out on the bridge by the test team based on: the SAT test plan I prepared.Result: For each sprint I wrote a sprint test plan to describe the testing approach. Together with a colleague, I then drew up the test scripts. I drew up a test report for each test run, so that the state of affairs was clear at all times. With the last release, an extensive FAT was performed in which all functionality was checked again.The next step is to carry out tests on the bridge in which the software is gradually linked to the sub-installations. Show less
  • Ict Improve
    Tunnel Combination
    Ict Improve Oct 2013 - Jan 2014
    Activities: In a tender process for a tunnel (based on LTS 1.2), I wrote the V&V plan in which the test strategy and the PRA are described. The Master test plan is an elaboration of the described test strategy. The author of the Master test plan was coached by me so that the 2 plans would fit together well.Result: The document was used in discussions with Rijkswaterstaat about the intended working method and approach within the project
  • Ict Improve
    Rijkswaterstaat - Testcentre
    Ict Improve Dec 2007 - Aug 2012
    Activities: DVM systems are validated and verified within the Rijkswaterstaat Test Center. DVM stands for Dynamic Traffic Management, such as matrix signs, rush hour lanes and route information panels. As quality manager, I redesigned the manual in terms of structure and content regarding testing, management and QA procedures. In addition, I carried out quality checks and reported to the RWS contract owner. An important point of attention was coordinating the activities of the plots and… Show more Activities: DVM systems are validated and verified within the Rijkswaterstaat Test Center. DVM stands for Dynamic Traffic Management, such as matrix signs, rush hour lanes and route information panels. As quality manager, I redesigned the manual in terms of structure and content regarding testing, management and QA procedures. In addition, I carried out quality checks and reported to the RWS contract owner. An important point of attention was coordinating the activities of the plots and guiding/coaching the employees to increase quality and assurance.In addition, as Test Manager I managed the various plots; together approximately 20 people. I have set up a Test Center-wide planning that is used by all plots for the approximately 50 projects carried out simultaneously. In some cases I determined the test strategy together with the tester and adjusted the test plan.Result:-Set up a test policy for the Test Center that describes the principles for the test projects, including general working methods and entry and exit criteria.-Newly developed manual that clearly describes how to work per plot, including: general procedures, templates and checklists.-Setting up Test Center-wide planning.-Services catalog for Test Center customers.-Monitoring and, if necessary, correcting testers.-Product assessments i.e. reviews and witnessing.-QA reports or dashboards for the RWS contract owner.-QA procedures for the work of QA Show less
  • Ict Group
    Prorail - Ebs+
    Ict Group Apr 2006 - Dec 2007
    Activities: ProRail is responsible for the management and maintenance of the rail network in the Netherlands. Within this, the Train Protection Systems department is responsible for the safe running of trains. This concerns safety and availability in terms of functionality, robustness and regulations.The EBS+ project aims to develop a generic security system in collaboration with Siemens AG. The EBS+ project ensures generic release and a pilot. After this, old relay systems will be… Show more Activities: ProRail is responsible for the management and maintenance of the rail network in the Netherlands. Within this, the Train Protection Systems department is responsible for the safe running of trains. This concerns safety and availability in terms of functionality, robustness and regulations.The EBS+ project aims to develop a generic security system in collaboration with Siemens AG. The EBS+ project ensures generic release and a pilot. After this, old relay systems will be replaced for 10 years as part of the Mistral program.The development of the system is carried out by Siemens AG. The testing, approval and release of the system is carried out at ProRail. Approximately 45 people work on the entire project.Within the project I am responsible for setting up and implementing processes regarding Risk Management, version and release management, archiving development documents and regulations/regulations and integral planning.Result and performance: Documentation set approved by the safety coordinator for the release of the EBS+ system Show less
  • Ict Group
    Siemens Mobile
    Ict Group Sep 2004 - Apr 2006
    Activities: As the Integration Manager for the mobile phone software, I coordinated the integration of the software during the development and maintenance phase (i.e. after Delivery Start). During the development phase, the 15 local Continuous databases were integrated into 1 integration database. To achieve the Delivery Start, the local databases were merged into 1 integration database on which all developers continued to work. After this, commercial software releases were made every week for… Show more Activities: As the Integration Manager for the mobile phone software, I coordinated the integration of the software during the development and maintenance phase (i.e. after Delivery Start). During the development phase, the 15 local Continuous databases were integrated into 1 integration database. To achieve the Delivery Start, the local databases were merged into 1 integration database on which all developers continued to work. After this, commercial software releases were made every week for operators around the world.Each release was first tested by the Smoke testing team in India who tested key functionality. If there were no major problems in the release, the version was forwarded to the testing department Show less
  • Ict Group
    Large Chip Manufacturer - Edge Testcases
    Ict Group Feb 2002 - Oct 2004
    Activities: As project leader, I managed a team of 15 developers to build EDGE test cases. The test cases can be used to test mobile phones with an EDGE protocol stack using specialized Rohde & Schwarz test equipment
  • Ict Group
    Ict Embedded - Osgi
    Ict Group Feb 2002 - Feb 2004
    Activities: As project leader, I managed a team of 3 experienced developers to conduct research into the application of OSGi in the automotive industry. In addition, I maintained contacts with senior and account management, planning and tracking & tracing. Furthermore, I conducted market research via the Internet into the current and future use of OSGi in the automotive industry. This has resulted in a business case in which the technical and commercial possibilities are discussed and… Show more Activities: As project leader, I managed a team of 3 experienced developers to conduct research into the application of OSGi in the automotive industry. In addition, I maintained contacts with senior and account management, planning and tracking & tracing. Furthermore, I conducted market research via the Internet into the current and future use of OSGi in the automotive industry. This has resulted in a business case in which the technical and commercial possibilities are discussed and weighed.Within another project I managed a team of 3 experienced developers. I maintained contacts with senior and account management, took care of planning and tracking & tracing. I also drew up a business case in which the commercial possibilities for ICT were detailed. The project has produced a showcase with which multimedia services via Digital TV (built into the car) are shown at the IFA 2003 Show less
  • Ict Group
    Scm Microsystems
    Ict Group Feb 2001 - Feb 2002
    Activities: I have been responsible for improving project implementation and providing certifications. For this I wrote some requirements and test documents. I have added various templates and work instructions to the quality manual.Result and performance: I have successfully certified 5 smart card readers (CE, FCC, UL, EMV, WHQL, USB)
  • Ict Group
    Kpn Telecom
    Ict Group Apr 1998 - May 2001
    As project manager I was responsible for the specification, construction and implementation of the Customer Control Internet service within the KPN organization. The construction of the application has been outsourced to another department. The rollout of the service was done by a team of 4 people under my direct supervision. Furthermore, I have initiated a security audit, with the result that several security measures have been taken.As the team leader of the development team (later… Show more As project manager I was responsible for the specification, construction and implementation of the Customer Control Internet service within the KPN organization. The construction of the application has been outsourced to another department. The rollout of the service was done by a team of 4 people under my direct supervision. Furthermore, I have initiated a security audit, with the result that several security measures have been taken.As the team leader of the development team (later project leader of the entire team), we developed a charging and payment application for use with the Chipper. The team consisted of approximately 12 developers and 4 testers.In the project I was responsible for managing the team and planning. In the project I applied effective leadership techniques, which resulted in a self-managing team. Furthermore, I applied structured testing using TMAP.Results:- Rollout of Customer Control Internet- Pilot of charging and payment application with telephone for Chipper Show less
  • And Identification
    Senior Designer
    And Identification Jan 1996 - Sep 1997
    Rotterdam Area, Netherlands
    Development and maintenance of EWD: Electronic Weekdocument for Asylum seekers.
  • Topsystems (Montevideo, Uruguay)
    Senior Designer
    Topsystems (Montevideo, Uruguay) Jan 1994 - Dec 1995
    Development of transfer program for banking (C++ with threading)Development of banking programming suite for Windows
  • Tno
    Software Developer
    Tno Aug 1988 - Dec 1993
    Development of expert systems (knowledge based systems)

Eduard Hartog Skills

Testing Test Management Software Project Management Scrum Istqb Requirements Analysis Software Engineering Prince2 Cmmi Agile Methodologies Programming Uml Integration C++ Windows Software Development

Eduard Hartog Education Details

Frequently Asked Questions about Eduard Hartog

What company does Eduard Hartog work for?

Eduard Hartog works for Ict Improve

What is Eduard Hartog's role at the current company?

Eduard Hartog's current role is Hubertus Tunnel.

What is Eduard Hartog's email address?

Eduard Hartog's email address is ed****@****veqs.nl

What schools did Eduard Hartog attend?

Eduard Hartog attended Technische Universiteit Delft, De Haagse Hogeschool / The Hague University Of Applied Sciences.

What skills is Eduard Hartog known for?

Eduard Hartog has skills like Testing, Test Management, Software Project Management, Scrum, Istqb, Requirements Analysis, Software Engineering, Prince2, Cmmi, Agile Methodologies, Programming, Uml.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.