Ed Moore is President of Moore Nuclear Energy, LLC, where he provides contract technical services as a Senior Advisory Engineer to the DOE (Department of Energy) and Savannah River National Laboratory in Aiken, SC. Moore has over 44 years of experience in a wide variety of nuclear-chemical processes, where he has served in such a wide variety of assignments (e.g., production supervisor, facility manager, facility design engineer, start-up manager, missions planning manager, materials management manager, and as the technical lead for numerous DOE studies both at SRS and Complex-wide). He is also a published author and patent holder,
Moore Nuclear Energy, Llc
-
PresidentMoore Nuclear Energy, LlcNew Ellenton, Sc, Us
-
Senior Advisory EngineerMoore Nuclear Energy, Llc Jun 2006 - PresentAs President of Moore Nuclear Energy, LLC, I provide technical services as a Senior Advisory Engineer, currently on contract to SRNS/SRNL.
-
PresidentMoore Nuclear Energy, Llc Jun 2006 - PresentAiken, ScMoore has supported WSRC and SRNS as a self-employed contractor leading and performing de-sign reviews and special studies related to plutonium, SNF, and nuclear processes including Pit Disassembly and Conversion Facility, Modern Pit Facility, Mixed-Oxide Fuel Fabrication Facility,Pu-Vitrification, Global Nuclear Energy Partnership, 2012 Back-End Fuel Cycle study, and more recently served was the lead technical author of the 2015 HTGR process description, material balance, off-gas system matrix, and cost estimate basis. His contribution has proven invaluable in key decisions by DOE EM, NE, DP and NNSA. The LLC has been awarded close to a million dollars in contracts since formation.
-
Senior Advisory EngineerActs On Contract To Srns Aug 2002 - Jun 2006Savannah River SiteContractor for WSRC via ACTs (2002 to 2006)After retirement from Washington Savannah River Company (WSRC) in August 2002, he supported the afore-mentioned programs as a contractor through ACTS (Astrid Contract Technical Services).
-
Senior Advisory Engineer (1996 To 2002):Westinghouse Savannah River Site Apr 1996 - Aug 2002Savannah River SiteMoore provided technical direction for a group of senior professionals with matrixed support from other DOE sites to develop site-specific and DOE-complex-wide, material management and disposi-tion plans for all forms of nuclear materials (plutonium, uranium, special isotopes, and fuels). Sup-port for these activities included conceptualizing flowsheets, developing facility-use strategies,and assessing options. Moore’s performance earned the Washington Group Eagle award in 2000.
-
Manager Materials Management Integration (1994-1996): Manager- Mission Planning (1993- 1994): And MaWestinghouse Savannah River Site Mar 1988 - Apr 1996Savannah River SiteMoore managed a group responsible for supporting WSRC and DOE materials managementinitiatives and planning. Products include the SRS Plutonium Vulnerability Assessment (1996), DOE- wide Integrated Facilities Plan (1995), SRS Integrated Nuclear Materials Management andDisposition Plans (1992-4), SRS Implementation Plan for DNFSB 94-1 Response (1994), AnnualSRS Inventory Assessment and Nuclear Materials Management Plans, WSRC Site Development Plan (1993), SRS Canyon Deinventory Plans (1992), and SRS Pyrochemical Facility Basic Data (1991). Moore also supported several DOE-wide reviews including the Complex 21 Technology Assessment Panel and the Environmental Management Nuclear Materials Stabilization Peer Panel.
-
Facility Manager- New Special Recovery (Nsr) Facility (1988-1991): Startup Leader- Replacement PreciDupont Mar 1981 - Mar 1988Savannah River SiteAs the NSR Facility Manager, Moore managed a team (24 professionals and over 40 operators) that developed and implemented a startup plan addressing all issues (e.g., order compliance, safety analysis, conduct of operation, training, checkout) associated with plutonium processing facilities.Moore also lead the successful startup of a fully-automated replacement precipitator system, which ran at capacity its first day of operation. Prior to start-up leadership, Moore served as “lead-process” liaison (including 2-3 years on assignment in Wilmington, DE) in overseeing design for several new SRS plutonium facility projects. During these years, Moore received a DOE Award of Excellence.
-
Area Supervisor (1975-81) / Senior Supervisor (1974-5) / Shift Supervisor (1972-3)Dupont Dec 1972 - Mar 1981Savannah River Site- Fb-LineMoore managed a team of 30 professionals and 80 operators who operated the SRS plutonium finishing operations, which recovered plutonium from legacy materials and which producedplutonium for use in nuclear weapons and in nuclear fuels (e.g., Fast Flux Test Facility fuel). Duringthese years, production goals were met without serious injury to employees. Moore also rotated through special assignments supporting design of SRS high-level waste tanks and startup and decommissioning of special plutonium processes.
Edwin Moore Education Details
-
Chemical Engineering -
Erskine Theological SeminaryMaster Of Divinity (Mdiv) -
Erskine Theological SeminaryMaster Of Theology (Thm)
Frequently Asked Questions about Edwin Moore
What company does Edwin Moore work for?
Edwin Moore works for Moore Nuclear Energy, Llc
What is Edwin Moore's role at the current company?
Edwin Moore's current role is President.
What schools did Edwin Moore attend?
Edwin Moore attended Clemson University, Erskine Theological Seminary, Erskine Theological Seminary.
Not the Edwin Moore you were looking for?
-
-
Edwin Moore
Product Manager - Contact Center Services At Nc Office Of Information Technology ServicesRaleigh, Nc6nc.gov, suddenlink.net, gmail.com, accenture.com, voxai.com, voxai.com -
Edwin Moore
Mundelein, Il -
Edwin Moore
Cleveland, Oh3signaturehealthinc.com, aol.com, signaturehealthinc.com
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial