Testing And Commissioning Engineer
Current1. Petro Rabigh• T & C of RMUs at Community includes the REJ603 ABB relay, transformer, and LV side.• T & C of HVAC SystemCO2 Recovery Plant Client Gulf-Cryo• T & C of 13.8KV Switchgear make Arabian Point Eight• T & C of Incoming GIS 13.8KV Switchgear Make Japan AE Power • T & C of GE 850 and GE 350 Relay• T & C of 400V Panels Qty. 18 Make Arabian Point Eight• T & C of GE P14N Relays• Red Markup Drawings Preparation• T & C of MCC (NEMA5 Bucket) and GE MMII relay.• SAT of Transformers of different ratings (100KVA-40MVA) including SFRA, C & DF, IR, WR, DFRA, TR.• Management of all the records including Test Reports, Equipment, etc• Inventory Management for the Shutdown2. SWCC ShoaibaSegregation of the Power Supply System for Mina and Quiza Pump Station at Shoaiba Client Hitachi Energy • Scheme and loop verification of the Transformer’s Switchgear, Protection Panel, and upstream 380KV LCC Panel• Testing of GIS 380KV Circuit Breaker, Disconnector, and Earth Switches • Erection, Installation, and Testing of ABB Transformer 380KV/13.8KV• Mechanical Protection verification, Oil bath sensor calibration, Fans check, OTI and WTI calibration• Protection and Metering CT’s testing and secondary Loop verification• Differential protection testing of the Transformer• Testing & Configuration of ABB Relays REF620, RET620 and REM620, RET670• Site Management and supervision of all activities• Commissioning of MV Motor Feeders rated 10.3MW at 13.8KV• Commissioning of Low Voltage panels• Preparation of RED markup drawings3. TRANSFORMER SERVICE & SOLUTION DIVISION (TSSD)• 110/15/6.6 kV transformer testing at Hadda substation, national grid, Makkah• 110/15/6.6 kV transformer testing at Umluj North substation, national grid• Transformers bushing testing make abb turkey at swcc-3, Yanbu• 110/15/6.6 kV transformer testing at Osailah substation, national grid, Makkah • Mechanical Protection verification, Fans Check, Sensor calibration, LCP Control verification