Structural Geologist - Engineering Geology Dpt
O.T.M. S.A.
Athens, Greece
Engineering Geology DepartmentMain Projects in Greece:• Motorway Rockfall Protection Measures Designs for existing slopes of the New Road Elefsina - Korinthos - Patra - Pyrgos - Tsakona, Section: Kiato to Psathopyrgos, 2016-2017, Design & Construction J/V: Apion Kleos• Site Investigation Geologist for the Supplementary Geotechnical Investigation (SGI) of Thessaloniki Metro – Kalamaria Extension / Project: CON002/13: Design, construction and commissioning of the extension of Thessaloniki metro to Kalamaria (2013, AKTOR S.A. for ATTIKO METRO S.A., Greece).• Geological Evaluations for Cut Retaining Structures of the New Road Elefsina – Korinthos – Patra – Pyrgos – Tsakona (EKPPT Project) - Section: Foinikas - Psathopyrgos.(2013, Design and Construction Joint Venture: APION KLEOS, Greece).• Geological Design for the “Filiatra – Pylos – Kalamata” Road (SW Peloponnesus) – Road Improvements. Sections: Pylos – Rizomylos and Pylos – Methoni.(2011, Ministry of Infrastructure, Transport and Networks, Greece)• Geological Design for the Mornos Aquaduct Failure. Section: Helikon B Tunnel – New Taxiarches Tunnel.(2011, EYDAP - Athens Water Supply & Sewerage Company, Greece)• Geological Design for the failures in Municipality of Metsovo, Ioannina Prefecture.(2011, Egnatia Odos S.A., Greece)• Geological Designs for the New Road Elefsina – Korinthos – Patra – Pyrgos – Tsakona (EKPPT Project) – Geological Designs for Tunnels and Retaining Structures: Xylokastro, Derveni, Mavra Litharia, Akrata, Platanos. (2008 to 2009, Design and Construction Joint Venture: APION KLEOS – HOCHTIEF, VINCI, AKTOR S.A., J&P AVAX, Greece)• Geological Designs for the New Highway Korinthos – Tripoli – Kalamata and Lefktro – Sparti. Road about 200km in length including large scale structures – bridges, tunnels, cuts and embankments.(2007 to 2010, Design and Construction Joint Venture: ”MOREAS” -AKTOR S.A., INTRAKAT, J&P AVAX) – Independent Engineer: AECOM Ltd, Greece)