Emad Abdelshafi Elsayed
AeroLeads people directory · profile

Emad Abdelshafi Elsayed Email & Phone Number

Infrastructure Lead Engineer | Wet Utility at Shaker Consultancy Group
Location: Badr City, Cairo, Egypt 6 work roles 1 school
LinkedIn matched
✓ Verified July 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Infrastructure Lead Engineer | Wet Utility
Location
Badr City, Cairo, Egypt
Company size

Who is Emad Abdelshafi Elsayed? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Emad Abdelshafi Elsayed is listed as Infrastructure Lead Engineer | Wet Utility at Shaker Consultancy Group, a with 896 employees, based in Badr City, Cairo, Egypt. AeroLeads shows a matched LinkedIn profile for Emad Abdelshafi Elsayed.

Emad Abdelshafi Elsayed previously worked as Infrastructure lead engineer at Shaker Consultancy Group and Technical Office Engineer Infrastructure, Construction at Shaker Consultancy Group. Emad Abdelshafi Elsayed holds B.Sc. In Civil Engineering, Construction Division, Good General Rating- Graduation Project Grade: V. Good from El Shorouk Acd.

Company email context

Email format at Shaker Consultancy Group

This section adds company-level context without repeating Emad Abdelshafi Elsayed's masked contact details.

Shaker Consultancy Group

Review company-level records connected to Emad Abdelshafi Elsayed before choosing the right outreach path.

Profile bio

About Emad Abdelshafi Elsayed

Extensive experience in managing large-scale infrastructure projects, including scheduling, cost control, and team coordination, Proficient in reviewing and preparing shop drawings for various utility networks and infrastructure components. Skilled in using software such as Revit Structure and Civil 3D for modeling, Proven ability to coordinate between multiple disciplines, lead progress meetings, and resolve project-related challenges effectively ,Adept at generating detailed project reports, including daily, weekly, and monthly updates, and managing compliance documentation ,Experience in overseeing construction activities, ensuring adherence to technical specifications, and managing material procurement and project inventory.

Current workplace

Emad Abdelshafi Elsayed's current company

Company context helps verify the profile and gives searchers a useful next step.

Shaker Consultancy Group
Shaker Consultancy Group
Infrastructure Lead Engineer | Wet Utility
cairo, al qahirah, egypt
Website
Employees
896
AeroLeads page
6 roles

Emad Abdelshafi Elsayed work experience

A career timeline built from the work history available for this profile.

Infrastructure Lead Engineer

Current

Cairo, Egypt

Projects:- Noor Smart City – Capital Gardens | TMG- Privado, Madinaty – New Cairo | TMGKey Achievements and Responsibilities:- Solve problems that arise during project implementation.- Technical knowledge of both wet and dry infrastructure utilities (including sewer, stormwater, potable water, irrigation and firefighting water, electrical and telecommunications).- Coordinate with the other disciplines including dry and wet utilities in addition to road… Show more Projects:- Noor Smart City – Capital Gardens | TMG- Privado, Madinaty – New Cairo | TMGKey Achievements and Responsibilities:- Solve problems that arise during project implementation.- Technical knowledge of both wet and dry infrastructure utilities (including sewer, stormwater, potable water, irrigation and firefighting water, electrical and telecommunications).- Coordinate with the other disciplines including dry and wet utilities in addition to road engineering and transport planning team.- Review all civil documents & reports prepared by civil engineers before the official submittal to ensure compliment with project requirement, standard time schedule. Including but not limited to Earth work, soil stabilization, piling design, retaining walls, and geotechnical measurement.- Attend design meeting with client, consultant and vendors. - Able to determine cost and time effects for variation orders, new proposals and modifications.- Preparing and Reviewing project contractors’ agreements- Preparing and Following the project schedules - Reviewing shop drawings and supervising their implementation for different utility networks, including sewage, stormwater, subsoil, water, fire, and irrigation as per material used UPVC, HDPE, Concrete and DI - Led progress and quality meetings, actively participating in workshops.- Successfully managed teams and resolved project-related challenges.- Review and study Requests for Information RFIs) raised by Project Contractors. Review and comment on actual design Show less

Feb 2021 - Present

Technical Office Engineer Infrastructure, Construction

Cairo, Egypt

Projects : - The New Administrative Capital - Implementation of Spending and Infrastructure in The Southern 90th Street- The New Administrative Capital -Strategic Underground Water and Irrigation tanks Capacity Of 125,000 m3 Key Achievements and Responsibilities: - Reviewing shop drawings for different utility networks, including sewage, stormwater, water, and irrigation Networks as per material used UPVC, HDPE, Concrete, DI and Carbon Steel -… Show more Projects : - The New Administrative Capital - Implementation of Spending and Infrastructure in The Southern 90th Street- The New Administrative Capital -Strategic Underground Water and Irrigation tanks Capacity Of 125,000 m3 Key Achievements and Responsibilities: - Reviewing shop drawings for different utility networks, including sewage, stormwater, water, and irrigation Networks as per material used UPVC, HDPE, Concrete, DI and Carbon Steel - Reviewed shop drawings for Underground Tanks utility buildings (Water, Irrigation Pump Room – Generator, Transformer and admin Buildings), and service tunnels.- Reviewing and following up schedules within a cost of 1.9 billion EGP, creating monthly reports, and establishing executive positions to Owner .- Created a 3D model in Revit Structure for service tunnel, TEE, Links to Substations and Reservoir utility buildings- Team building and development of coordination, communication, and site skills- Interface and coordinate with the Clients and prepare and conduct presentations.- Coordinate with design teams, site teams, clients and authorities.- Prepare engineering document list and control the engineering process to comply with projects time schedules.- Project drawings coordination and match them, and ensure their integrity and approval by the project owner- Preparing the reports form (by specialized program)and following the daily and weekly reports with the site engineers Show less

Mar 2019 - Feb 2021

Planning, Technical Office Engineer Infrastructure

Masaraat Al-Wosta For Contracting Est.

Jiddah, Makkah, Saudi Arabia

Project: - King Abdul-Aziz University, Jeddah - Completion of The Discharge of RainwaterKey Achievements and Responsibilities:- Demonstrated ability taking responsibility for resolving technical issues within the discipline, other disciplines, and engineering staff as well as with third parties (customer, suppliers, and regulators).- Prepared project schedules in Primavera R17, managing a cost of 21 million SR.- Made executive positions and generated daily,… Show more Project: - King Abdul-Aziz University, Jeddah - Completion of The Discharge of RainwaterKey Achievements and Responsibilities:- Demonstrated ability taking responsibility for resolving technical issues within the discipline, other disciplines, and engineering staff as well as with third parties (customer, suppliers, and regulators).- Prepared project schedules in Primavera R17, managing a cost of 21 million SR.- Made executive positions and generated daily, 3 weeks look ahead, and monthly reports.- Prepared shop drawings and proposed lines in Civil 3D program.- Quantities surveying and preparing progress invoices- Prepare requests for information (RFI) documents to ensure correctness and completeness for sending them to the customer or engineering consultant.- Creating 2D and 3D model for shop drawing and As built- Resolve arising conflicts between various design components.- Provide calculations of the quantities required of each material or design items especially in lump sum projects, and communicate these to relevant project personnel for cost estimation and analysis. Show less

Oct 2017 - Jan 2019

Senior Site Engineer

Masaraat Al-Wosta For Contracting Est.

Jeddah, Makkah, Saudi Arabia

Projects:- Maysam Project, Northern Abhor, Jeddah - Implementation of Sewage, Storm, Water Networks, and Electricity Duct- Smart City of Asfan First Phase, Jeddah - Implementation Of 300 Workshops for Sewage, Water, And Fire Networks House Connections- Tabuk Prevent Flood Hazards and Discharge of Rainwater to The MunicipalityKey Achievements and Responsibilities:- Executed projects according to terms and technical specifications.- Prepared… Show more Projects:- Maysam Project, Northern Abhor, Jeddah - Implementation of Sewage, Storm, Water Networks, and Electricity Duct- Smart City of Asfan First Phase, Jeddah - Implementation Of 300 Workshops for Sewage, Water, And Fire Networks House Connections- Tabuk Prevent Flood Hazards and Discharge of Rainwater to The MunicipalityKey Achievements and Responsibilities:- Executed projects according to terms and technical specifications.- Prepared shop drawings for various networks and coordinated on-site meetings.- Submitted materials submittals, compliance statements, and method statements.- Managed the ordering of materials and tools and prepared monthly progress reports.- Study the project contract and the conditions and specifications of the implementation of the works- Setting schedules showing technical and regular manpower, work teams, materials and equipment required at each stage of implementation in a manner consistent with the schedule - Establishing or contributing to setting the timetable for the implementation of the project works according to the project implementation period- Reviewing the work site and informing the owner of the project of any obstacles hindering the start of implementation- Providing samples for all materials used in the project and approving them from the owner- Calculating the quantities of excavation or backfilling according to the retina and the design levels- Following up on the manufacture of reinforcing steel according to the rules according to the plans and auditing the distribution and fixation of the iron Show less

Apr 2015 - Oct 2017

Site Civil Engineer

The Dimensions Of The Gravity Of The Contracting - Riyadh -Ksa

Riyadh, Saudi Arabia

Projects:- The Military Police Battalion, Riyadh - Implementation of Security Facilities Building 2nd Phase- The Military Police Battalion, Riyadh - Maintenance of 1 Warehouses of The Engineers Corps- Subway Restaurant, Riyadh - Finishing Of 3 ShopsKey Achievements and Responsibilities:- Executed projects according to terms and technical specifications.- Prepared and submitted method statements, inspection requests, and materials submittals.- Managed the… Show more Projects:- The Military Police Battalion, Riyadh - Implementation of Security Facilities Building 2nd Phase- The Military Police Battalion, Riyadh - Maintenance of 1 Warehouses of The Engineers Corps- Subway Restaurant, Riyadh - Finishing Of 3 ShopsKey Achievements and Responsibilities:- Executed projects according to terms and technical specifications.- Prepared and submitted method statements, inspection requests, and materials submittals.- Managed the ordering of materials and tools and prepared monthly progress reports.- Completed the Subway Restaurant with its American design. Show less

Sep 2013 - Dec 2014

Supervision Civil Engineer

The Islamic Establishment For Contracting – Sharkia - Egypt

Egypt

Projects:- The Medical Center of Awlad Saqr- The New Branch of The Central Hospital of Kafr Saqr - Implementation Of 5th Floor Structure Slab Only Within Area Of 1000m2- Ophthalmology Hospital in Zagazig - Implementation Of 1st Floor Structure Slab Only 500m3Key Achievements and Responsibilities:- Executed projects according to terms and technical specifications.- Prepared architectural drawings for residential buildings and villas.- Managed… Show more Projects:- The Medical Center of Awlad Saqr- The New Branch of The Central Hospital of Kafr Saqr - Implementation Of 5th Floor Structure Slab Only Within Area Of 1000m2- Ophthalmology Hospital in Zagazig - Implementation Of 1st Floor Structure Slab Only 500m3Key Achievements and Responsibilities:- Executed projects according to terms and technical specifications.- Prepared architectural drawings for residential buildings and villas.- Managed project inventory and prepared extracts.- Ordered materials and tools as per specifications and consultant approval.- Study the project contract documents (time schedule, project design drawings, BOQ, etc.).- Update the shop drawing log before sending the shop drawing to the consultant for approvals.- Study and prepare requests for information (RFIs) for all missing, unclear, conflicting or other technical matters that may arise during construction.- Prepare as-built drawings at the end of the project and hand over to the project consultant Achievement - Participate in solving/reporting any unexpected technical difficulties, and other problems that may arise during construction to the Technical Office Manager for discussion and proper solution.- Participate in implementing technical office policies and procedures. Show less

Apr 2011 - Sep 2013
Team & coworkers

Colleagues at Shaker Consultancy Group

Other employees you can reach at shakergroup.com. View company contacts for 896 employees →

1 education record

Emad Abdelshafi Elsayed education

  • El Shorouk Acd
    El Shorouk Acd
    Good General Rating- Graduation Project Grade: V. Good
FAQ

Frequently asked questions about Emad Abdelshafi Elsayed

Quick answers generated from the profile data available on this page.

What company does Emad Abdelshafi Elsayed work for?

Emad Abdelshafi Elsayed works for Shaker Consultancy Group.

What is Emad Abdelshafi Elsayed's role at Shaker Consultancy Group?

Emad Abdelshafi Elsayed is listed as Infrastructure Lead Engineer | Wet Utility at Shaker Consultancy Group.

Where is Emad Abdelshafi Elsayed based?

Emad Abdelshafi Elsayed is based in Badr City, Cairo, Egypt while working with Shaker Consultancy Group.

What companies has Emad Abdelshafi Elsayed worked for?

Emad Abdelshafi Elsayed has worked for Shaker Consultancy Group, Masaraat Al-Wosta For Contracting Est., The Dimensions Of The Gravity Of The Contracting - Riyadh -Ksa, and The Islamic Establishment For Contracting – Sharkia - Egypt.

Who are Emad Abdelshafi Elsayed's colleagues at Shaker Consultancy Group?

Emad Abdelshafi Elsayed's colleagues at Shaker Consultancy Group include Mohamed Salah, Moatasem Yahia, Ahmed Mohamed Elazb, Mohamed Fouad, and Nesrine Zakaria.

How can I contact Emad Abdelshafi Elsayed?

You can use AeroLeads to view verified contact signals for Emad Abdelshafi Elsayed at Shaker Consultancy Group, including work email, phone, and LinkedIn data when available.

What schools did Emad Abdelshafi Elsayed attend?

Emad Abdelshafi Elsayed holds B.Sc. In Civil Engineering, Construction Division, Good General Rating- Graduation Project Grade: V. Good from El Shorouk Acd.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.