Power Project Mechanical Engineer
CurrentWorking with project team responsible for overseeing the construction of a thermal power block that features a combined cycle gas turbine (CCGT) with a total capacity of 680 MW, driven by the gas turbine M701JAC supplied by MITSUBISHI POWER and equipped with MPW steam turbine having gross output 217MW.