Community Design E.I.
CurrentSSO Control: City of Cleveland Heights MS4 Sewer Partial Consent Decree Projects- Assembling a detailed Basis of Design report with an alternatives analysis for the client to select a final design, resulting in control of two active SSOs. The analysis illustrates 3 potential solutions for eliminating sanitary discharges, with each having supporting documents describing their necessary scopes of construction/design work and a Class 5 cost estimate. Involves H&H modeling, GIS data… Show more SSO Control: City of Cleveland Heights MS4 Sewer Partial Consent Decree Projects- Assembling a detailed Basis of Design report with an alternatives analysis for the client to select a final design, resulting in control of two active SSOs. The analysis illustrates 3 potential solutions for eliminating sanitary discharges, with each having supporting documents describing their necessary scopes of construction/design work and a Class 5 cost estimate. Involves H&H modeling, GIS data investigations, and feasibility checks.- Civil 3D drafting of drawings for two additional Cleveland Heights MS4 projects for final design phase. 1. Separation of a common trench over/under configuration in poor condition 2. Sanitary sewer relief for elimination of another two active SSOs & illicit residential connections------------------------------------------------------------------------------------------------Advanced Stormwater Planning: NEORSD Problem Areas in Big Creek, West Branch Basin- Performing existing data review for areas where project SWMM5 models require recalibration or are missing critical parameters. Show less