Emre Özen Email and Phone Number
Emre Özen is a Investment Manager at Medcem Cement Group at Medcem Cement Group / Medcem Çimento Grubu. He possess expertise in proje planlama, tedarik, dik değirmen montajı, devreye alma, havalı bant montajı and 2 more skills.
-
Investment ManagerMedcem Cement Group / Medcem Çimento Grubu Aug 2024 - PresentSilifke, Mersin, Türkiye -
Investment Chief At Medcem CementMedcem Cement - Medcem Çimento Feb 2021 - Aug 2024Silifke, Mersin, TürkiyeI started to chief of the Investment for Medcem Cement second line project in 2021.I started to my new job with below items• Arrangement of the Proses flow sheet and general layout for new line.• Determine of type of the equipments and prepare of equipment lists.• Prepare of Comprise table of the second line main equipments.• Prepare of tender documents of local construction company.After the determine of all suppliers.• Technical meetings with equipment suppliers by… Show more I started to chief of the Investment for Medcem Cement second line project in 2021.I started to my new job with below items• Arrangement of the Proses flow sheet and general layout for new line.• Determine of type of the equipments and prepare of equipment lists.• Prepare of Comprise table of the second line main equipments.• Prepare of tender documents of local construction company.After the determine of all suppliers.• Technical meetings with equipment suppliers by the Medcem requirements for basic design• Checking to basic engineering drawing of equipment suppliers• Coordination with between to equipment supply companies with local engineering company for prepare of detail arrangement drawings.• Checking to detail arrangement drawings and section views according to basic engineering drawings.• Checking to static projects according to detail section drawings• Provide of all projects for construction company from Detail engineering company• Checking to workshops of local construction supplier for manufacturing.• Checking to investment progress according to schedule• Coordination of between to Construction supplier and Supervisors of Equipment suppliers.• Structural steel works• Site check, for all erection jops with my team.Management of below Units at My responsibility;- 9.000tpd clinker capacity kiln and cooler (Polysius)- 700t/h capacity vertical Raw mill (Loesche)- 60t/h capacity vertical Coal mill (Loesche)- 210t/h capacity vertical Cement mill (Loesche)- 30.000t capacity homogenization silo (Claudius Peters)- 30.000t capacity 4sections Cement silo (Claudius Peters)- ESP for kiln (FLS Airtech)- Bag filters (CTP)- Fans (Venti-Oelde)- Bucket elevators, pan conveyors, drag chains and truck loaders (Aumund)- Belt weight (Schenck)- Dust coal transport (FLSPfister)- SNCR system (YARA)- Explosion doors and dust coal silo (Thornwesten)- CO2 inertization system (Rebecco)And all local suppliers Show less -
Power Plant ChiefMedcem Cement - Medcem Çimento Jan 2018 - Oct 2021Silifke / MersinI assigned to manager of the power plant during to installation on 1st January of 2018.I managed to cold and hot commissioning.Power plant had start up at 1st april of 2018. I had management of production in 3 years the 10mWh capacity waste heat recovery power plant in the Medcem Cement Plant after the start up.Power plans has 3 steam boiler, steam turbine, Demineralization system and air-cooling condenser.I had responsible for all systems management, maintenance, and… Show more I assigned to manager of the power plant during to installation on 1st January of 2018.I managed to cold and hot commissioning.Power plant had start up at 1st april of 2018. I had management of production in 3 years the 10mWh capacity waste heat recovery power plant in the Medcem Cement Plant after the start up.Power plans has 3 steam boiler, steam turbine, Demineralization system and air-cooling condenser.I had responsible for all systems management, maintenance, and preventative maintenance.I had constituted management system of the power plant.I made training for the personals.I prepared documentation according to ISO 9001.I prepared checklists of systems.I made schedule for repairing of year. Show less -
Preventative Maintenance ChiefMedcem Cement - Medcem Çimento Jan 2020 - Feb 2021Silifke, MersinI had responsible management of the preventative maintenance of the Medcem Cement Plant.I continued work responsible of the power plant in same time.I was help the Medcem Investment department for combiflex cement mill investment at the site for 3 months, in this time. (220t/h roller press and ball mill by Polysius). I was assigned Investment Chief when Medcem was decided new line Investment. -
Project EngineerMedcem Cement - Medcem Çimento Aug 2016 - Jan 2018SilifkeI assigned 10MWh turnkey Waste Heat Recovery System Investment in the Medcem Cement Plant.I was started this project When I was start to this Investment, I work to project engineer. Manager left in my company, and I was continuing alone at WHR investment. I was management to site and erection as far as end of the project.İn my responsible;- 3 steam boilers- 1 Steam Turbine- Demineralization systems- 1 Generator- Air cooling condensers- pumps, pipelines, and… Show more I assigned 10MWh turnkey Waste Heat Recovery System Investment in the Medcem Cement Plant.I was started this project When I was start to this Investment, I work to project engineer. Manager left in my company, and I was continuing alone at WHR investment. I was management to site and erection as far as end of the project.İn my responsible;- 3 steam boilers- 1 Steam Turbine- Demineralization systems- 1 Generator- Air cooling condensers- pumps, pipelines, and all installation activitiesI assigned to manager of the power plant during to installation on 1st January of 2018.I managed to cold and hot commissioning. Show less -
Installation EngineerMedcem Cement - Medcem Çimento Nov 2012 - Aug 2016Silifke, Mersin, TürkiyeI had responsible checking to installation at the site. I checked to construction company activities and İnstallation according to project and manuals.Coordination of between to Construction supplier and Supervisors of Equipment suppliers.I had responsible management to installation company during to cold and hot commissioning at the site.Management of below Units at My responsibility;10.500tpd clinker capacity kiln and cooler (Polysius)420t/h capacity vertical raw mill… Show more I had responsible checking to installation at the site. I checked to construction company activities and İnstallation according to project and manuals.Coordination of between to Construction supplier and Supervisors of Equipment suppliers.I had responsible management to installation company during to cold and hot commissioning at the site.Management of below Units at My responsibility;10.500tpd clinker capacity kiln and cooler (Polysius)420t/h capacity vertical raw mill (Loesche)75t/h capacity vertical coal mill (Loesche)20.000t capacity homogenization silo (Claudius Peters)Dust coal transport (FLSPfister)Bag filters (CTP)Coal Mill Bag Fİlter (Scheuch)ESP(Redecam)Bucket elevators (Aumund)Belt weight (Schenck)Paletless Pletizing (FLS Ventomatic) Show less -
Project EngineerAslanlar Metal Ltd. Dec 2011 - Oct 2012Sarıçam, Adana, TürkiyeI assigned for Investment of solar vacuum tube Investment project.We made all local manufacturing and installation with themself with our team. We didnt work with supplier company for construction.I worked in this investment as technical expert. I read all drawing for the construction.I worked arrangement of general layout of the plant.I worked to arrangement of substructure jobs.I had responsible local manufactures of 24tpd capacity glass kiln at workshop.I managed to… Show more I assigned for Investment of solar vacuum tube Investment project.We made all local manufacturing and installation with themself with our team. We didnt work with supplier company for construction.I worked in this investment as technical expert. I read all drawing for the construction.I worked arrangement of general layout of the plant.I worked to arrangement of substructure jobs.I had responsible local manufactures of 24tpd capacity glass kiln at workshop.I managed to team for installation after the manufacturing progress.I had responsible in cold and hot commissioning. Show less
Emre Özen Skills
Emre Özen Education Details
-
Mechanical Engineering
Frequently Asked Questions about Emre Özen
What company does Emre Özen work for?
Emre Özen works for Medcem Cement Group / Medcem Çimento Grubu
What is Emre Özen's role at the current company?
Emre Özen's current role is Investment Manager at Medcem Cement Group.
What schools did Emre Özen attend?
Emre Özen attended Mustafa Kemal University.
What skills is Emre Özen known for?
Emre Özen has skills like Proje Planlama, Tedarik, Dik Değirmen Montajı, Devreye Alma, Havalı Bant Montajı, Whr, Imalat.
Not the Emre Özen you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial