Yazılım Test Mühendisi
CurrentAn effective test plan has been created and added to Jira.• Test cases and test steps were prepared in Excel byconverting acceptance criteria, product designs andfunctional details into test scenarios. Prepared test caseswere transferred to Jira.• After the manual tests of the test cases transferred to Jirawere completed, the execute operations were performedin jira and the Bug and Defects found in the test results wereperiodically reported and Bug Tickets were created, theerrors occurred during the tests were followed and the testswere run with Jira.• Screenshots or video recordings were taken and addedto Jira during the reporting of bugs and defects thatpassed without errors.