Electrical Engineer
Aecom/Urs Engineers & Constructors Romania, Formerly Washington Group Intl.
Bucharest, Romania
• One line diagrams;• Technical bid evaluations;• Interconnection drawings for DCS, junction boxes, switchgears (MV & LV) and vendor panels;• Wiring diagrams;• Power distribution panel schedules;• Cable routing and Management with Cable Manager software;• Cable sizing calculations, material take-off and Requisition;• Cable tray sizing, material take-off and Requisitions;• Power and Control material take-off, Requisitions;• Conduit sizing, material take-off and Requisitions;• Typical mounting details;• Grounding and lightning system design;• Electrical equipment general arrangement;• Vendor drawings and Data Sheets review;• Answer to client request for information and review comments;• Prepare deviation request to project specifications;Assignments:-Participating at factory acceptance test for 6,6&11kV switchgears (06.Apr.07-11.Apr.07) ABB-Czech republic.-3 month (02.June.07-01.Sep.07) assignment to Denver office for project support.-2 month (26.Mar.08-24.May.08) assignment to site (Qatar, Middle East) for project support.-11 months (during November 2009-March 2011), assigned to WGI Middle East for project support on site: Qatar, Ras Laffan