Project Manager
CurrentManaging the construction process of a residential building in AlKhobar - as an owner representative - from scratch till the current process of construction.
Please complete the CAPTCHA to continue
A concise factual answer block for searchers comparing this professional profile.
Muhammed Abbas is listed as Project Manager | Civil Engineer at YAMIN for Real Estate and Development, based in Al Khobar, Eastern, Saudi Arabia. AeroLeads shows a matched LinkedIn profile for Muhammed Abbas.
Muhammed Abbas previously worked as Project Manager at Yamin For Real Estate And Development and Project Manager at Barq Almustaqbal. Muhammed Abbas holds Bachelor'S Degree, Civil Engineering from Mansoura University.
I am Muhammed Abbas, a highly experienced Construction Manager with over 13 years of expertise in various construction projects. My career has been marked by dedication, organization, and motivation. I excel in technical calculations and details, and I'm currently enhancing my skills through Project Management courses. I've worked with companies of all sizes in Egypt and Saudi Arabia, consistently improving productivity, reducing costs, and ensuring top-quality project delivery. My strengths include team management, effective delegation, communication, and innovation in construction processes.
Company context helps verify the profile and gives searchers a useful next step.
A career timeline built from the work history available for this profile.
Al Khobar, Eastern, Saudi Arabia
Managing the construction process of a residential building in AlKhobar - as an owner representative - from scratch till the current process of construction.
Tabuk, Saudi Arabia
• Managed the Temporary Depots Project for the Roads Division of NEOM, valued at 15 Million SAR.• The project involved the construction of four maintenance camps located in Tabuk, AlBadaa, Muweilah, and AlSharaf.• Each camp was designed to serve as a maintenance hub for addressing road accidents and emergency maintenance operations.• The camps were equipped with full accommodation facilities and were fully furnished, including large steel sheds serving as workshops with all necessary equipment.• These sites were developed from scratch in remote locations with considerable distances between them, exceeding 100 kilometers between any two sites.Key Achievements:• Improved project performance and productivity rates by an impressive 15%, showcasing your leadership and management skills.• Established effective communication channels with stakeholders, ensuring continuous cooperation and keeping all parties informed with the latest project updates.• Successfully created a comprehensive project scope and planning for various project activities, contributing to efficient project execution.• Managed a diverse team of more than 20 individuals with different specialties, highlighting your ability to lead and coordinate a multifaceted workforce.• Enhanced the experience of your assistants, fostering their confidence and ability to make informed decisions.• Achieved a notable cost reduction of more than 5%, demonstrating your commitment to efficient cost management.• Executed the project according to the defined scope with minimal defects in the quality of delivered works, maintaining a defect rate of less than 3%.
Cairo, Egypt
During my work in AlSafwa company I worked on three projects, worked on two projects in parallel as technical office manager and worked as project manager on the third project. The first project was Police Complex at 10th of Ramadan City (Owner: Ministry of Interior - value 92 million EGP) – Sharqia – Egypt. The project consisted of five buildings (Police Station – Civil Registration – Firefighting Brigade – Soldiers building – Mosque) with total area of 10000 m2 and also includes Infrastructure works of the project (Sanitation Sewage pipelines, fresh water pipelines, electrical cables, firefighting pipelines and underground water tanks and road construction works).The second project was construction of Public school at 15th district (Owner: Ministry of Housing - value 14 million EGP) -10th of Ramadan City -Sharqia – Egypt. The project consisted of school building of 4 floors and 28 classes besides labs, teacher’s rooms and administration rooms. Landscape works include playgrounds, exterior walls and kindergarten’s garden. infrastructure works like sanitation sewage pipelines, electrical cables and firefighting tanks and pipelines.The Third Project was R/C firefighting ground concrete tank with 1000m3 capacity with control, pumps and pipes network (68 Million EGP) – AlRoubiky -Badr City – Cairo – Egypt.The Project consisted of underground reinforced concrete tank with 1000 m3 water capacity. Attached with this tank several rooms for pumps, control panels and generators. The project also included firefighting pipelines, fire hoses, heat sensors and smoke sensors.
Cairo, Cairo, Egypt
• Designed various structural elements, including slabs, columns, and foundations, using design software. This indicates your proficiency in structural engineering and design.• Conducted quantity surveying of different construction materials, demonstrating your skills in material estimation and cost analysis.• Prepared project tender documents and item specifications, showcasing your attention to detail in project documentation.• Observed and monitored project scope, progress, and delivery in collaboration with site engineers, ensuring projects were executed according to plan.• Prepared customer submittals, emphasizing your ability to communicate effectively with clients and stakeholders.My responsibilities during this working period was: Designing different structural elements using design software (Slabs, Columns and Foundations).Quantity surveying of different construction materials.Preparing project’s tender and items specs.Observing project work path and progress and coordination with site engineers.Preparing customer submittals.
Cairo, Cairo, Egypt
Project Overview:• Worked on the Commercial Compound project located in the 5th District of New Cairo, Egypt.• The project encompassed the construction of 12 blocks, exterior walls, and infrastructure works, including sanitation sewage pipelines, fresh water pipelines, electrical cables, exterior lighting, and road construction.Responsibilities:• Produced CAD shop drawings, as-built drawings, and 3D models necessary for site works, indicating your proficiency in technical drafting and documentation.• Managed subcontractor invoices, overseeing financial aspects of the project's subcontracting relationships.• Led the preparation of quantity surveying and calculated project material requirements, contributing to effective project planning and resource management.
El Arish, North Sinai, Egypt
• Project: Technical Commercial Institute in AlArish, Egypt• Owner: Ministry of High Education• Project Value: 18 Million EGP• Project Details:• Five-story building with over 1000 m2 of area per story• Facilities included educational rooms, four large lecture halls, labs, administrative offices, and additional roomsResponsibilities:• Tender study, pricing, and bidding• Surveyed the site, including cut and fill works• Supervised R/C and PC works for foundations• Managed foundation’s bricklayers, insulation, and PC floors• Oversaw R/C structure works and a firefighting ground concrete tank with a 120m3 capacity• Supervised finishing works and electromechanical installations• Prepared subcontractor’s invoices• Created shop drawings, as-built drawings, and 3D modeling for site works• Conducted quantity surveying and calculated project’s material needs.
Buraydah, Al Qasim, Saudi Arabia
• Project: Public Schools Complex in Buraidah, KSA (Value: 80 million SAR)• Three schools: Primary, Prep, and High SchoolResponsibilities• Supervised finishing works and electromechanical installations.• Coordinated with consultant counterparts for optimal results.
El Mansoura, Ad Daqahliyah, Egypt
• Residential building (10 stories) attached to a two-story mall in Mansoura, Egypt (Value: 12 Million EGP)Responsibilities:• Supervised R/C and PC works for foundations.• Oversaw R/C structure construction.• Managed finishing works and electromechanical installations.• Coordinated with consultant counterparts to maximize results.
Quick answers generated from the profile data available on this page.
Muhammed Abbas works for YAMIN for Real Estate and Development.
Muhammed Abbas is listed as Project Manager | Civil Engineer at YAMIN for Real Estate and Development.
Muhammed Abbas is based in Al Khobar, Eastern, Saudi Arabia while working with YAMIN for Real Estate and Development.
Muhammed Abbas has worked for Yamin For Real Estate And Development, Barq Almustaqbal, Alsafwa Co, For Construction, Concrete Company For Construction, and Igc Co, For Construction.
You can use AeroLeads to view verified contact signals for Muhammed Abbas at YAMIN for Real Estate and Development, including work email, phone, and LinkedIn data when available.
Muhammed Abbas holds Bachelor'S Degree, Civil Engineering from Mansoura University.