Assistant Engineer- Section Head -Gazetted
CurrentProject Handled1. Taluk Hospital Building at Adimali –5 Storied-Area -64.56k Sqrft- Cost- 2.8 Million USD2. Veterinary Hospital Building in Adimali – Area -3k Sqft – Cost – 1.3 Lakh USD3. Gov.School Projects in Adimali& Thodupuzha- 4 Numbers- Area – 81.77k Sqft- Cost-3.5 Million USD4. Residential Project (Staff quarters) in Munnar –3 StoriedArea -25k Sqrft- Cost-1.1M USD5. 14 Fit out Projects in Munnar-Adimali-Thodupuzha-Cost – 3.5 Lakh USD6. Site Development work of Gov.LP School –Thoupuzha R/W -120m L, 7.5m H-Cost-3.4Lakh USD7. Highway Construction Project- Cubummettu Road- Length- 28.1KM- Cost -10 Million USD- (On Progreess-80%)Managed and supervised the above construction projects, ensuring compliance with regulations and meeting project deadlines, resulting in a 90% project completion rate and a client satisfaction score of 9Collaborate with stakeholders like Investigation/Survey team, Design Team, Architectural team, Contractors, Subcontractors, Client Departments and for Project proposal including Feasibility Study, Topographic survey , Soil Investigation, Architectural drawings, Structural Drawings, Estimation, Tendering, Technical and Financial sanction, Project Execution, QA/QC procedures , Measurements and Bill preparation including routine Lab and Field Test on Materials and worksOptimizing the project cost and achieving desired quality with suitable Mix Design, choosing correct Materials, and giving proper technical advice to subordinate Conduct cost estimation and budgeting for the projects, achieving an accuracy rate of 90% and delivering cost savings of $1 Lakh on a project budget of $1m USDPerformed routine site inspections and resolving technical issues, enhancing project quality and safety with a safety incident rate of zeroPrepare BOQ, Tender Documets, Bills with (FIDIC, POMI,CESMM,IS 1200, SP 27)Developing & Implementing ITP, PQP, Method Statement, check list, NCR, Quality Manual, Lab Manual, in QC Procedures