Mechanical Engineer
CurrentPreparing daily & monthly progress reports.Installation of Air handling units, Fan coil Units, Installation of Chilled Water piping, Installation of Package units, Installation of Evaporative Units, Exhaust and Fresh Air Fans. Tested, troubleshot, and repaired systems by identifying malfunctions and replacing parts and components. Read diagrams, specifications, drawings, blueprints, and schematics.Firefighting & HVAC Pressure testing. • FCUs & AHUs Testing & Commissioning. • Preparing daily & monthly progress purport • Ensuring the method of stamen to be implemented as per project specification & drawings. • Responsible for ensuring HVAC Ducts, fittings, accessories and chilled water piping, fittings, valves are available and approved by inspection team prior to installation. • Firefighting suppression installation. (Sprinkle & FM200) • Planning of shutdown maintenance schedule, computed requirements of man power and other inputs work• execution to ensure work accomplishments as minimum production free time. • Provided engineering support and direction for the maintenance. • Schedule all necessary inspections and escort inspector throughout.