Electrical Engineer
Current✔Electrical System/ ElectroMechanical→ Installation, modification, maintenance, testing and commissioning of LV/ MV 415V/11kV Switchgear that includes: • PT/CT Test using Omicron• Busbar and feeder cable test using hi-pot test, primary and secondary injection test and Insulation Resistance Test.→ Overhauling, maintenance and repair, re-installation, inspection, Performance and vibration test analysis and modification of LT and HT Induction Motors/ DC Motors including:• Bearing Housing clearance inspection and resleeving• Oil Deflector gap clearance inspection• Polarization index test• Wedges inspection for re-wedging• Motor - Pump alignment (Radial - Axial) inspection→ Installation, Testing, modification and Commissioning of Lighting System.→ Installation, Testing and commissioning of 415V Heat Tracing System (Chromalox)→ Supervision of earthing and 415V/ 11k V electrical cable laying, termination and testing including cable trays and supports installation.→ Installation, testing and commissioning of 415V Motor Operated Valves - MOV (AUMA).→ Installation, testing and commissioning of step-down ONAN OLTC 11kV/ 415V Transformer.→ Modification of 11kV Motor Feeder into Transformer Feeder (ABB).→ Installation and commissioning of power JBs and equipments according to hazardous area classification.✔Instrumentation→ Modification and testing of existing motor control centre instrument cables from DCS/ ESD to motor feeder for upgradation of Fuel Oil System.→ Survey and drawing implementation for replacement of existing instrument transmitter cables (PIT, LIT, DPIT) according to P&ID.→ Supervision of instrument cable laying and termination/ cable tray and support installation.→ Instrument cable replacement and modification, termination and testing for existing Marshalling Cabinet from DCS to local switchgear.→ Installation, testing and commissioning of telecommunications system (MAN, WAN, LAN, WLAN) in ring and mesh connection system.