Site Engineer
CurrentMAHSR (Mumbai-Ahmedabad) Bullet Train Project at C3 Package. Project Details:Design and Construction of Civil and Building Works including Testing and Commissioning onDesign Build Lump Sum Price Basis for Double Line High Speed Railway involving Viaducts & Bridges (excluding fabrication and transportation of steel truss girder components), Maintenance Depot, Tunnels,Earth Structures and Stations (Thane, Virar and Boisar), between Shilphata in the State of Maharashtra and Zaroli at Maharashtra-Gujarat border from MAHSR Km 21.150 to MAHSR Km 156.600 [excluding Thane Depot] for the Project for Construction of Mumbai-Ahmedabad High Speed Rai(MAHSR).Client: National High-Speed Rail CorporationLimited (NHSRCL)Roles and Responsibilities: All Site Responsibilities and civil works, Site Execution, Site Supervision, Document controller, Site Billing, Monitoring and information, reviewing method statements, reviewing proposed drawings from the contractor, coordinating with contractors designer, coordinating with the contractor planning engineer.