Engineer - Civil (Precast Yard)
Vadodara, Gujarat, India
HSR C6 Project (First Bullet Train Flag Ship Project of India)The Mumbai-Ahmedabad High Speed Rail (MAHSR Bullet Train) project is the first of its kind in India. In which the length of the corridor will be 508.17 km, with a total of twelve stations in the states of Maharashtra, Gujarat as well as the Union Territory of Dadra and Nagar Haveli. It will cover a distance of 155.76 kms in the state of Maharashtra (7.04 kms in Mumbai suburban, 39.66 kms in Thane district and 109.06 kms in Palghar district), 4.3 kms of Dadra and Nagar Haveli and 348.04 kms in Gujarat state, 26 in high speed rail Mumbai. excluding kilometers, a viaduct would be running at a speed of 320 km/h on an elevated (10 to 15 m) track above ground, which would be underground. All stations except Bandra Kurla Complex station (Mumbai) will be elevated. Bandra Kurla Complex will remain underground, covering a total of 12 stations in Mumbai, Thane, Virar, Boisar (in Maharashtra) and Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad and Sabarmati (in Gujarat). The C6 package comprising a viaduct of 87.425kms has been provided to L&T TI IC. The C6 package runs from Vadodara to Ahmedabad in the state of Gujarat and includes 1 station in Anand, Gujarat.