I has managed the construction survey works of a wide range of building, foundation, tunnel, runway, rail, infrastructure, Aquarium, casino and marine works Projects throughout 29 years career in the Construction industry. Some skills used for Microstation, Inroads, Autocad and excel.

Eric Kwok's Current Company Details

Land Surveyor
Eric Kwok Work Experience Details
  • Leighton Contractors (Asia) Ltd
    Senior Surveyor
    Leighton Contractors (Asia) Ltd Jun 2011 - Nov 2020
    香港特別行政區
    06/2011 - 04/2016 Senior Surveyor on MTR Contract South Island Line (East) 903 - Ocean Park Station, Wong Chuk Hang Station, Viaducts and Aberdeen Channel Bridge (contract value HK$2.5bn).The scope of works involves construction of two elevated stations at Ocean Park and Wong Chuk Hang, 2.1km of viaduct and a 246m-long cast in-situ balanced cantilever bridge over a water channel. Wong Chuk Hang Station is being built with a public interchange underneath. The viaduct is constructed using the… Show more 06/2011 - 04/2016 Senior Surveyor on MTR Contract South Island Line (East) 903 - Ocean Park Station, Wong Chuk Hang Station, Viaducts and Aberdeen Channel Bridge (contract value HK$2.5bn).The scope of works involves construction of two elevated stations at Ocean Park and Wong Chuk Hang, 2.1km of viaduct and a 246m-long cast in-situ balanced cantilever bridge over a water channel. Wong Chuk Hang Station is being built with a public interchange underneath. The viaduct is constructed using the precast segmental method and has three sections, the first crossing several busy roads and the remaining sections being constructed in restricted working conditions due to limited space and reduced access.Responsibilities on the project included, prepare survey data for setting out and check setting out works. As built record of construction. Monitoring settlement works. Receiving and organization of site works. Management Surveyors to site works. Organize and update construction drawings. Drawing plan & section assist projects. 04/2016 – 11/2020 Senior Surveyor on MTR Shatin-Central Link Contract 1123 - Exhibition Station and Western Approach Tunnel (contract value HK$5.8bn). The scope of works involves construction of underground stations at Exhibition Centre (interchange station) and 300m Cut and Cover Tunnels. Diaphragm or pile walls are commonly used in station and tunnel construction.Responsibilities on the project included, prepare survey data for setting out and check setting out works. As built record of construction. Monitoring settlement works. Receiving and organization of site works. Management Surveyors to site works. Organize and update construction drawings. Drawing plan & section assist projects. Show less
  • Gammon Construction Company Ltd
    Surveyor
    Gammon Construction Company Ltd May 2010 - Jun 2011
    Hong Kong Sar
    Surveyor on Cathay Pacific Cargo Terminal at Hong Kong International Airport ,(contract value HK$4.2bn), comprises the construction of an eight- storey warehouse in precast/insitu concrete; ramps to the warehouse and an office building. It also includes co-ordination of Material Handling System (MHS); building services and finishing. The gross floor area is approximately at 280,000 square metres.Responsibilities on the project included, prepare survey data for setting out and check setting… Show more Surveyor on Cathay Pacific Cargo Terminal at Hong Kong International Airport ,(contract value HK$4.2bn), comprises the construction of an eight- storey warehouse in precast/insitu concrete; ramps to the warehouse and an office building. It also includes co-ordination of Material Handling System (MHS); building services and finishing. The gross floor area is approximately at 280,000 square metres.Responsibilities on the project included, prepare survey data for setting out and check setting out works. As built record of construction. Monitoring settlement works. Receiving and organization of site works. Management Surveyors to site works. Organize and update construction drawings. Drawing plan & section assist projects. Show less
  • Engineering Surveys Ltd
    Senior Surveyor
    Engineering Surveys Ltd Jun 2009 - Apr 2010
    Hong Kong Sar
    06/2009 – 04/2010 Senior surveyor on Ocean Park Redevelopment - Plaza, Aqua City and Grand Aquarium, (contract value HK$1.25bn). This project included the construction of the Entry Plaza (new front entrance to the park), Aqua City (large lagoon with surrounding retail and F&B outlets) and the Grand Aquarium (a 5 million litre aquarium) and associated infrastructure services and front of house fit-out.Responsibilities on the project included, prepare survey data for setting out and check… Show more 06/2009 – 04/2010 Senior surveyor on Ocean Park Redevelopment - Plaza, Aqua City and Grand Aquarium, (contract value HK$1.25bn). This project included the construction of the Entry Plaza (new front entrance to the park), Aqua City (large lagoon with surrounding retail and F&B outlets) and the Grand Aquarium (a 5 million litre aquarium) and associated infrastructure services and front of house fit-out.Responsibilities on the project included, prepare survey data for setting out and check setting out works. As built record of construction. Receiving and organization of site works. Management Surveyors to site works. Organize and update construction drawings. Drawing plan & section assist projects. Show less
  • Engineering Surveys Ltd.
    Senior Surveyor
    Engineering Surveys Ltd. Apr 2007 - Apr 2009
    Macao Sar
    Senior surveyor on City of Dreams, Macau (contract value $HK14bn). Construction of a mega-size integrated urban entertainment resort. The scope of work consisted of 600,000m2 of developed floor space which included four deluxe towers of between 30 and 36 storeys containing Grand Hyatt, Hyatt Regency, Crown and Hard Rock Hotels, a gambling casino, serviced apartments, an underwater-themed casino, luxury retail arcades and department store, a custom-designed water theatre with seating for around… Show more Senior surveyor on City of Dreams, Macau (contract value $HK14bn). Construction of a mega-size integrated urban entertainment resort. The scope of work consisted of 600,000m2 of developed floor space which included four deluxe towers of between 30 and 36 storeys containing Grand Hyatt, Hyatt Regency, Crown and Hard Rock Hotels, a gambling casino, serviced apartments, an underwater-themed casino, luxury retail arcades and department store, a custom-designed water theatre with seating for around 2,000 people. A custom-built energy centre covering six levels was built to contain electrical substations, a central cooling plant and an emergency power generator.Responsibilities on the project included, prepare survey data for setting out and check setting out works. As built record of construction. Receiving and organization of site works. Management Surveyors to site works. Organize and update construction drawings. Drawing plan & section assist projects. Show less
  • Engineering Surveys Ltd
    Surveyor
    Engineering Surveys Ltd Dec 2005 - Mar 2007
    Hong Kong Sar
    Surveyor on MTR Contract KDB200 Kowloon Southern Link, West Kowloon Station and Tunnels, Jordan Road to East Tsim Sha Tsui (contract value HK$2bn). The project scope included construction of a new underground station, twin 1km-long tunnels using TBM and evacuation shafts. Over 450m of cut-and-cover construction took place for a new underground station and cut-and-cover tunnel near Austin Road, plus 50m of cut-and-cover tunnel in Salisbury Road. The project was constructed in a highly developed… Show more Surveyor on MTR Contract KDB200 Kowloon Southern Link, West Kowloon Station and Tunnels, Jordan Road to East Tsim Sha Tsui (contract value HK$2bn). The project scope included construction of a new underground station, twin 1km-long tunnels using TBM and evacuation shafts. Over 450m of cut-and-cover construction took place for a new underground station and cut-and-cover tunnel near Austin Road, plus 50m of cut-and-cover tunnel in Salisbury Road. The project was constructed in a highly developed area and required extensive traffic management.Responsibilities on the project included, setting out works on site mainly and prepare survey data for setting out and check setting out works.As built record of construction. Receiving and organization of site works. Show less
  • Mbh Joint Venture
    Surveyor
    Mbh Joint Venture Aug 2004 - Oct 2005
    Hong Kong Sar
    Surveyor on Sha Tin New Town Stage II Construction of Road T3, (contract value HK$2120m).The Project works comprise mainly the construction of about 2 kilometers long dual two-lanes elevated roadway running between Tai Po Road (Sha tin Section) and Tai Po Road (Tai Wai Section), which connects to R8 near Sha Tin Heights, together with constructing an underpass of about 200 meters long, slip roads connections at Tai Wai, associated noise barriers and enclosures, drainage works, slope protection… Show more Surveyor on Sha Tin New Town Stage II Construction of Road T3, (contract value HK$2120m).The Project works comprise mainly the construction of about 2 kilometers long dual two-lanes elevated roadway running between Tai Po Road (Sha tin Section) and Tai Po Road (Tai Wai Section), which connects to R8 near Sha Tin Heights, together with constructing an underpass of about 200 meters long, slip roads connections at Tai Wai, associated noise barriers and enclosures, drainage works, slope protection works and landscape works.Responsibilities on the project included, setting out works on site mainly and prepare survey data for setting out, Monitoring settlement works and check setting out works.As built record of construction. Show less
  • Amec-Hong Kong Construction Cc-202 Joint Venture
    Surveyor
    Amec-Hong Kong Construction Cc-202 Joint Venture Sep 2000 - Jul 2004
    Hong Kong Sar
    Surveyor on The KCRC West Rail Project_Yuen Long & Long Ping Station. Job CC202. KCRC West Rail CC202 Long Ping Station. The scope of works involves construction of two elevated stations at Yuen Long & Long Ping Station. Multi-cell R.C. Box Culverts, Drainages, Services Tunnel, Retaining Walls and Footbridge.Responsibilities on the project included, receiving and organization of site works. Management Surveyors to site works. Organize and update construction drawings.
  • Downer Construction (Hong Kong) Limited
    Assistant Surveyor
    Downer Construction (Hong Kong) Limited Sep 1998 - Sep 2000
    Hong Kong Sar
    Assistant Surveyor on Tai Po Ting Kok Road Improvement Phase 2.The Project works comprise mainly the construction of R.C. Box Culverts, Drainages, Slope formation, Retaining Walls & Road works.Responsibilities on the project included, setting out works on site mainly and prepare survey data for setting out and check setting out works. As built record of construction.
  • Amec-C-G Joint Venture
    Assistant Surveyor
    Amec-C-G Joint Venture Oct 1997 - Sep 1998
    e 1994 – 199708/1994 –10/19971991 – 199408/1994 –10/1997Airport (Chek Lap Kok Airport – C402). The Project works comprise mainly the construction of Runway , Taxiway bridge, Ancillary Facilities, pavement & Underground Utilities.Responsibilities on the project included, setting out works on site mainly.Check setting out works. As built record of construction.
  • Tysan Management Limited
    Assistant Surveyor
    Tysan Management Limited Aug 1994 - Oct 1997
    Assistant Surveyor on Tak Keung Court (Lok Fu), Chung Ming Court (Tseung Kwan O), Ma Tau Kok Road_Jubilant Place (To Kwa Wan), North Point Government Office, Lung Pon Court (Daimond Hill), Cheong Wan Road_Metropolis Drive (Hung Hom).The projects comprise mainly the construction of foundation piling & building construction (Basement to Platform).Responsibilities on the project included, setting out works on site mainly.Check setting out works. As built record of construction.
  • Sanfield Building Contractors Limited
    Assistant Surveyor
    Sanfield Building Contractors Limited Apr 1991 - Jul 1994
    Hong Kong Sar
    Assistant Surveyor on Ho Tung Lau Depot. The project comprise mainly the construction of foundation piling & building construction (Depot to Platform).Responsibilities on the project included, setting out works on site mainly.Check setting out works. As built record of construction.

Eric Kwok Education Details

  • Choi Hung Estate Catholic Secondary School
    Choi Hung Estate Catholic Secondary School

Frequently Asked Questions about Eric Kwok

What is Eric Kwok's role at the current company?

Eric Kwok's current role is Land Surveyor.

What schools did Eric Kwok attend?

Eric Kwok attended Choi Hung Estate Catholic Secondary School.

Not the Eric Kwok you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.