Manufacturing Planner 3
•Assigned to support Shipside Action Tracker (SAT) Tiger Team to knock out as many SAT’s as possible. •On loan to Propulsion/Fuel Systems Installation updating PDM and Capp documents.•Recovery Plan Reduced IP’s Back log from 456 to 117 in 30 days using PDM/CAPPII•Ship Side Production Test ME (PTME) Avionics for Positions 0 thru 4 Back-up Lead Proper procedures utilizing Project Engineering, Liaison Engineering, and Quality.•Addressed Urgent Production Test for MT’s, Issues that occur at ship side support with HIRF Tests and Retests.•Back-up Lead for supporting manufacturing with Emergent Removals (ER's) Subject Matter Expert (SME) Processing of SOI Revision Request (SRR's) Non Conformance (NC’s), and Checker, WCCR focal